Culpeo Minerals Limited (Culpeo or the Company) (ASX:CPO, OTCQB:CPORF) is pleased to report on its
activities for the quarter ended 30 September 2024 (the Quarter).
HIGHLIGHTS
LANA CORINA PROJECT (50% CULPEO, EARNING 80%1)
•
Assay results from diamond hole CMLCD014 further increased the mineralised interval to 454m
@ 0.93% CuEq from 90m and included several wide zones of high-grade molybdenum, with
the following notable copper equivalent results:2,3
•
78m @ 1.24% CuEq from 200m;
•
68m @ 1.14% CuEq from 320m; and
•
40m @ 1.20% CuEq from 394m.
•
Three zones of associated high-grade, molybdenum mineralisation delineated within drill hole
CMLCD014.
•
CMLCD014 expanded the mineralised zone to 600m x 400m, to a depth of 870m and remains
open in all directions.
•
Drilling of CMLCD014 was completed during the Quarter to a final depth of 977m, with the remainder
of the assays expected to be reported in Q4 of the 2024 calendar year.
•
Site clearance and drill contractor selection for upcoming drilling at the Vista Montana Prospect
underway.
FORTUNA PROJECT (80% CULPEO12)
•
High-grade copper assays of up to 1.83% Cu returned from rock chips at the newly discovered El
Quillay West Prospect.17
•
Outcropping copper mineralisation at El Quillay West confirmed over 1,000m by 500m trend, with
strong correlation to earlier geophysical anomalies.
•
Ongoing trenching at El Quillay South continues to advance, defining targets and extending
mineralisation which remains open to the south.18
•
Notable results have returned thick surface mineralisation from outcropping gold-copper
system.
CULPEOMINERALS.COM.AU
info@culpeominerals.com.au
Level 39, 152-158 St Georges Terrace, Perth WA 6000
61 (8) 6383 7894
ASX ANNOUNCEMENT 31 OCTOBER 2024
•
Notable results from the Phase 1 Trenching Program at El Quillay South, include: 18
•
46m at 0.90% CuEq in trench EQS002 (hangingwall);
•
6m at 3.21% CuEq in trench EQS002 (footwall);
•
20m at 0.51% CuEq in trench EQS001 (hangingwall); and
•
6m at 1.43% CuEq in trench EQS003 (footwall).
CORPORATE
•
Successful capital raise, with approximately $2.0 million receipted to date through a two-tranche
equity placement (Placement), strongly validating the high prospectivity of the Company's Chilean
copper portfolio 23.
•
Post Quarter end, $420k received from part-completion of the second tranche of the Placement.
•
The Company’s cash balance, post Tranche 2 Placement funds received to-date, stood at $1.22
million.
•
Post Quarter end, the Company announced the appointment of Mr Geoff McNamara as Interim
Executive Chairman following the resignation of Mr Max Tuesley as Managing Director24.
Operating Activities
During the September Quarter, further results were received from drilling activities conducted at Lana
Corina over the previous Quarter. Promising surface sampling results were also returned from the Fortuna
Project, where high-grade copper mineralisation was confirmed at El Quillay West.
Figure 1: Plan view of the Fortuna and Lana Corina Project areas.
PAGE | 2
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 OCTOBER 2024
LANA CORINA PROJECT (50% CULPEO EARNING 80%1)
The Lana Corina Project is located in the coastal belt of Chile, approximately 350km north of Santiago.
The Project benefits from substantial existing local infrastructure, including sealed road access and a
75MW power station approximately 3km to the east.
The Project is associated within a structural zone oriented in a northeast-southwest direction with >3km
of strike and up to 400m wide. High-grade copper mineralisation is associated with four known breccia
pipes occurring in the upper levels of a large copper-bearing porphyry hosted mineralised system.
The top of the Lana Corina and Vista Montana mineralised system (Figure 2) presents a series of
outcropping copper bearing magmatic / hydrothermal breccias. At depth, the system transitions into a
mineralised micro-tonalite which hosts consistent copper mineralisation, present mainly as chalcopyrite.
A high-grade zone of molybdenite mineralisation is located below the Lana Corina intrusive/breccia
complex representing a magmatic cupola zone. The deeper molybdenum mineralisation is interpreted as
a continuous mineralised system varying in style as a result of temperature and pressure gradients. The
footprint of the Lana Corina system is 600m by 400m, with drilling extending mineralisation to a current
depth of 870m3.
Figure 2: Lana Corina/Vista Montana long section: defined targets over >3km of strike (background image is
the VOXI 3D magnetic inversion model).3,4,5,6
PAGE | 3
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 OCTOBER 2024
During the Quarter, Culpeo received additional results from drill hole CMLCD014, where previous assay
results produced an extremely wide, copper-molybdenum intersection of 298m @ 0.98% CuEq2.
The objective of this drill hole was to test Culpeo’s current understanding of the revised geological model
at Lana Corina and extend the known high-grade breccia hosted mineralisation to the west and to the
surface.
These additional results increased the intersection of near-surface, high-grade copper
mineralisation to 454m @ 0.93% CuEq from 90m3. This significant intersection includes several wide
zones of high-grade molybdenum mineralisation.
Figure 3: Cross-section through the Lana Corina Project showing position of diamond drill hole CMLCD014
(looking north-east with a 40m wide clipping plane)3.
PAGE | 4
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 OCTOBER 2024
Figure 4: Plan View Lana Corina Project showing position of diamond drill hole CMLCD014 3,7,8,9,10,11
To date, this intersection includes the following notable high-grade zones2,3:
•
78m @ 1.24% CuEq from 200m;
•
68m @ 1.14% CuEq from 320m; and
•
40m @ 1.20% CuEq from 394m.
Assay results from hole CMLCD014 confirm a copper-molybdenum intersection of 454m @ 0.93% CuEq
from 90m to 544m. This extends the longest continuously mineralised intersection at Lana Corina
achieved to date. The consistency of the 454m intersection supports the current geological model and
demonstrates the potential to expand the scale of the near-surface, high-grade breccia zone and the
associated porphyry mineralisation.
Below the outcropping high-grade breccia / porphyry hosted copper mineralisation, the current drill hole
has intersected several wide zones of significant molybdenum, with assay results returning a zone of
1,638ppm Mo (0.68% CuEq) over 46 metres3.
PAGE | 5
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 OCTOBER 2024
Figure 5: Example of high-grade copper mineralisation in hole CMLCD014, 1.74% CuEq (416m to 418m).3
Figure 6: Example of high-grade molybdenum mineralisation in hole CMLCD014, 4,350ppm Mo (1.70% CuEq)
(498m to 500m). 3
PAGE | 6
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 OCTOBER 2024
FORTUNA PROJECT (80% CPO12)
El Quillay West
Geophysical data remodelling conducted within the El Quillay copper trend identified a large Induced
Polarisation (IP) chargeability anomaly, indicative of copper sulphide mineralisation13. This anomaly has
a large footprint of 500m x 300m, representing a possible new third zone of copper sulphide
mineralisation.
Figure 7: High-grade rock chips results returned from El Quillay West Prospect.13,14,15,16, 17
Results have been returned from 16 rock chip samples collected at El Quillay West, where Culpeo’s
geologists identified copper mineralisation in outcrop, primarily in the form of copper carbonates.
Notably, three of the 16 samples returned assays of over 1% copper, with the highest grade reaching
1.83% Cu.17
Earlier reprocessing of historical geophysical data13 identified three Pole-Dipole Induced Polarisation
(PDIP) chargeability anomalies at El Quillay West, which were subsequently targeted for detailed mapping
and sampling. The prospectivity of this area has now been confirmed, with a surface geochemical anomaly
extending over 1,000m along strike and up to 500m wide. A clear spatial association exists between the
chargeability anomalies and copper mineralised samples (refer to Figure 8).
PAGE | 7
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 OCTOBER 2024
Figure 8: Rock chip results showing strong spatial relationship with El Quillay PDIP chargeability anomaly
areas over a depth slice image from 100m below ground level.
Pink = Higher Chargeability and Blue = Lower Chargeability13,14,15,16,17
Mineralisation is hosted primarily in andesitic volcanics and is associated with significant alteration
including chlorite, epidote, albite and magnetite (refer to Figures 9 and 10).
El Quillay West is a high-priority target where no historical drilling has been undertaken. Given its
proximity to the main mineralised El Quillay host structure, El Quillay West is interpreted to represent
another potential conduit for the focus of mineralising fluids.
Culpeo continues to expand its geological, structural and mineralisation knowledge at the Fortuna Project,
aiming to enhance its exploration models and refine future exploration targets, for pursuit in the next
phase of work.
PAGE | 8
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 OCTOBER 2024
Figure 9: Sample CPO0008964 - Andesite host rock, brecciated texture with chlorite-epidote-albite alteration,
featuring mineralisation in vugs and patchy zones with limonite, copper oxide, and magnetite17.
Figure 10: Sample CPO0008966 - Andesite host rock brecciated texture with chlorite-epidote-albite alteration,
featuring mineralization in vugs and patchy zones with limonite, malachite and magnetite17.
El Quillay South
Recent mapping at El Quillay South has extended the known mineralisation by a further 1,000m bringing
the total strike length to over 2,000m (refer to Figure 11). A systematic trenching program began in
August 2024, with an additional 1,500m planned to follow up on historic sampling.
The El Quillay structure has now been mapped over a strike length of >3km. Initial results from a
systematic trenching program have returned copper mineralisation with widths of up to 43.1m at 1.00%
Cu and 1.31g/t Au.16
PAGE | 9
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 OCTOBER 2024
An additional 1,500m of planned trenching is currently in progress to identify drill targets and extend the
known mineralisation which remains open to the south. Four trenches have been completed at the El
Quillay South Prospect with results for 166 samples already received.
Mineralisation at El Quillay South is focused on both the footwall and hangingwall of the structure. Results
indicate that wider copper dominant mineralisation is hosted within the hangingwall, and a higher-grade
gold zone distributed in the footwall.18
Figure 11: Plan view of the southern Fortuna Project, including the planned trenching program at El Quillay
South Prospect.12,13,14,15,16,17,18,19,20,21,22
PAGE | 10
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 OCTOBER 2024
Table 1: El Quillay South - Phase 1 Trench Results 18
Trench Location
Easting
Northing
RL
Au ppm
Cu %
Mo ppm
Ag ppm
CuEq %
Trench 1 Footwall
298319
6569720
825
0.72
0.49
10.00
0.64
0.88
Trench 1 Hangingwall
298286
6569688
829
0.38
0.30
6.00
0.50
0.51
Trench 2 Footwall
298426
6569584
872
5.04
0.49
5.00
1.17
3.21
Trench 2 Hangingwall
298409
6569572
951
0.68
0.53
5.22
0.67
0.90
Trench 3 Footwall
298425
6569076
799
0.32
1.25
5.00
0.50
1.43
Trench 3 Hangingwall
298356
6569033
772
0.22
0.29
5.00
0.77
0.42
Trench 4 Footwall
298432
6568577
747
0.54
1.29
5.00
23.00
1.72
Trench 4 Hangingwall
298407
6568519
744
0.09
0.20
5.00
2.42
0.27
Figure 12: Trenching at an andesite outcrop with silica-albite-sericite alteration within a silicified and
brecciated structure. Mineralisation shown to consist of quartz, iron oxides, and copper oxides.
Samples CPO0009117-CPO0009118- CPO0009119 Trench 1 (5.5m at 0.88% CuEq) 18.
Corporate Activities
Appointment of Interim Executive Chairman
On 14 October 2024, Culpeo advised of the appointment of Mr Geoff McNamara as Interim Executive
Chairman of the Company, effective 1 November 2024.23 Mr McNamara’s appointment follows the
decision of current Managing Director, Mr Max Tuesley, to step down due to family reasons. Mr
McNamara will continue as Interim Executive Chairman until a new Managing Director is appointed.
Mr McNamara, a co-founder and major shareholder of Culpeo, has served as Non-Executive Chairman
since the Company’s incorporation and has played a pivotal role in establishing and developing the
PAGE | 11
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 OCTOBER 2024
business since its ASX listing. With 30 years of international resource sector experience, his career spans
roles as a Geologist, Project Manager and Fund Manager.
Successful Equity Raise of $2.0 million24
The Company progressed its equity Placement comprising the issue of 53.75 million new fully paid
ordinary shares to sophisticated and professional investors at an issue price of $0.04 per share. At the
date of this report, the Placement raised approximately $2.0 million (before costs) with the issuance of
48.75 million new fully paid ordinary shares.
The placement consists of two tranches comprising:
•
Tranche 1: 38,250,000 Placement shares which raised approximately $1.53 million and was
completed during the quarter; and
•
Tranche 2: 15,500,000 Placement shares to raise approximately $0.62 million. Tranche 2 includes
Director participation and was approved by shareholders at the Annual General Meeting held on
16 October 2024. Post Quarter end, Tranche 2 was part-completed with the issue of 10,500,000
Placement shares and the receipt of $0.42 million.
Cash Position at Quarter End
During the quarter, the Company spent $442k on exploration activities, primarily focused on exploration
drilling and assays, and sampling programs. At Quarter end, the Company had $0.973 million in cash and
cash equivalents and zero debt.
Post Quarter end, the Company received $420k from the part-completion of Tranche 2 of the equity
placement. The Company’s cash balance post-receipt stood at $1.22 million.
Payments to Related Parties
As outlined in the Appendix 5B for the Quarter ending 30 September 2024 (Sections 6.1 and 6.2),
approximately $155k in payments were made to related parties and/or their associates, which comprised
remuneration for the Managing Director, Non-Executive Director fees and Consulting fees.
This announcement has been authorised by the Board of Directors of Culpeo Minerals Limited
COMPANY CONTACT
Geoff McNamara
Interim Executive Chairman
E: geoff.mcnamara@culpeominerals.com.au
P: +61 (08) 6383 7894
PAGE | 12
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 OCTOBER 2024
ABOUT CULPEO MINERALS LIMITED
Culpeo Minerals Limited is committed to copper exploration and development, with strategic
investments in Chile, a leading global copper producer. Focusing on high-grade copper systems in
Chile's infrastructure laden Coastal Cordillera. The Company has recently announced a significant
copper and molybdenum discovery at Lana Corina and acquired the promising Fortuna Project.
Both projects are located in Chile's Coquimbo region, renowned for its numerous world-class copper
and gold mines. These project areas feature significant outcropping high-grade copper deposits, and
the region's infrastructure includes access roads, power lines, water sources, and local settlements,
all of which are essential for, and help facilitate economic mining activities.
PAGE | 13
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 OCTOBER 2024
The Company is led by a skilled board and management team with extensive Chilean knowledge and
a strong local network. Drawing on over two decades of experience and established relationships
within Chile, the Company actively seeks cost-efficient discoveries and acquisitions. Culpeo’s main
objective is to increase shareholder value through the exploration, acquisition, and development
high-grade, near surface copper systems.
COMPETENT PERSONS’ STATEMENTS
The information in this announcement that relates to Exploration Results is based on information
compiled by Mr Maxwell Donald Tuesley, BSc (Hons) Economic Geology, MAusIMM (No 111470). Mr
Tuesley is a member of the Australian Institute of Mining and Metallurgy and is a shareholder and
Director of the Company. Mr Tuesley has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Tuesley consents to the
inclusion in this report of the matters based on this information in the form and context in which it
appears.
The information in this announcement that relates to Geophysical Results is based on information
compiled by Nigel Cantwell. Mr Cantwell is a Member of the Australian Institute of Geoscientists
(AIG). Mr Cantwell is a consultant to Culpeo Minerals Limited and he has sufficient experience which
is relevant to the style of mineralisation and type of deposit under consideration and to the activity
which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources & Ore Reserves. The
Company confirms that it is not aware of any new information or data that materially affects the
historical geophysical results included in the original report
PAGE | 14
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 OCTOBER 2024
Appendix A: Culpeo Minerals Exploration Concessions at 30 September 2024
Project
Licence
Company
Area (Ha)
Grant
Expiry
Ownership
Lana - Corina
San Agustin
Socavon
Lana Segunda
Corina
Laco 1 al 10
Sara 1 – 20
Patty 2 1 – 75
Patty 3 1 – 260
Patty 4 1 - 111
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
Antofagasta Minerals
SCM Antares
SCM Antares
SCM Antares
1
1
1
1
10
90
75
260
111
1951
1951
1951
1951
2015
2006
2019
2019
2019
None
None
None
None
None
None
None
None
None
50%
50%
50%
50%
50%
50%
50%
50%
50%
Peta 31/55
Peta 91/92
Peta 15/28
La Rosa 27/28
La Rosa 31/46
La Rosa 1/30
Corredor 2, 1/12
Corredor 3, 1/6
Cachorro 1/20
Cachorro 1,1/160
Cachorro 2, 1/95
Cachorro 3, 1/24
Cachorro 4, 1/173
Cachorro 5, 1/87
Almudena 1,1
Amudena 2, 1/3
Almudena 3, 1/2
Almudena 4, 1/7
Almudena 5, 1/6
Almudena 6,1
Almudena 7,1
Almudena 8,1/4
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
11-Nov-89
11-Nov-89
06-Nov-89
26-Dec-89
28-Jun-11
25-Nov-91
18-Feb-15
18-Feb-15
11-Nov-14
28-Jul-15
18-Feb-15
18-Feb-15
18-Feb-15
18-Feb-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
San Sebastian 1/16 (2/16)
San Sebastian 1/16 (1)
Minera Panga SpA
Minera Panga SpA
1998
1998
None
None
100%
100%
LA FLORIDA 1 a 20
LA FLORIDA II 1 al 20
PIEDRA DURA 1 a 20
EL QUILLAY 5A 1 al 17
EL QUILLAY 4A 1 al 25
Bastis 29CB 1 al 16
Bastis 29CB 17 al 20
LOS QUILLAYES 1/4 (3/4)
LA ESPERANZA 1/10
PRETECATEMO 1/20
Antares 1 al 165
MATILDE 2 1 al 50
El Quillay 2 1 al 224
El Quillay 3 1 al 236
El Quillay 4A 1 al 89
El Quillay 4B 1 al 40
El Quillay 5A 1
El Quillay 5C 1 al 98
El Quillay 6 1 al 13
El Quillay 6A 1 al 7
La Escondida 1-14
FLORIDA 1
FLORIDA 10
FLORIDA 11
FLORIDA 12
FLORIDA 2
FLORIDA 3
FLORIDA 4
FLORIDA 5
FLORIDA 6
FLORIDA 7
FLORIDA 8
FLORIDA 9
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SLM La Escondida
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
2007
2010
2006
2011
2011
2011
2011
1984
1960
1953
2011
2011
2011
2011
2011
2011
2011
2011
2011
2011
2005
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
15/03/2026
15/03/2026
15/03/2026
15/03/2026
15/03/2026
21/02/2026
21/02/2026
13/02/2026
13/02/2026
14/02/2026
14/02/2026
20/02/2026
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Total – Lana Corina
Petacas
550 Ha
Total – Las Petacas
San Sebastian
1,406 Ha
Total – San Sebastian
Fortuna
120
10
70
6
80
300
12
6
20
160
95
242
173
87
1
3
2
7
6
1
1
4
45
5
50 Ha
Total – Fortuna
100
100
96
17
25
127
35
10
50
100
165
200
224
236
89
40
1
98
13
7
42
300
300
300
300
300
300
300
300
300
300
300
300
5,375 Ha
PAGE | 15
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 OCTOBER 2024
Appendix B: Technical Details
Copper Equivalent (CuEq) values: Assumed commodity prices for the calculation of CuEq is Cu
US$3.00/lb, Au US$1,700/oz, Mo US$14/lb and Ag US$20/oz. Recoveries are assumed from similar
deposits: Cu = 85%, Au = 65%, Ag = 65%, Mo = 80%, CuEq (%) was calculated using the following
formula: ((Cu% x Cu price 1% per tonne x Cu recovery) + (Au(g/t) x Au price per g/t x Au recovery) +
(Mo ppm x Mo price per g/t x Mo recovery) + Ag ppm x Ag price per g/t x Ag recovery)) / (Cu price
1% per tonne x Cu recovery). CuEq (%) = Cu (%) + (0.54 x Au (g/t)) + (0.00037 x Mo (ppm)) + (0.0063
x Ag (ppm)). It is the Company’s opinion that all elements included in the metal equivalents have a
reasonable potential to be recovered and sold.
References
1
Refer to ASX announcement dated 21 March 2024 “Ownership Interest in Lana Corina Project Increased to 50%”.
2
Refer to ASX announcement dated 19 June 2024 “Exceptional, High-Grade Copper Intersected at Lana Corina – 298m @ 0.98% CuEq”.
3
Refer to ASX announcement dated 10 July 2024 “Drill Results Extend Mineralisation at Lana Corina to 454m @ 0.93% CuEq”.
4
Refer to ASX announcement dated 31 August 2022 “Culpeo Minerals Strikes Critical Metals at Lana Corina”.
5
Refer to ASX announcement dated 8 March 2023 ” Geochemical Survey Completed at Lana Corina”.
6
Refer to ASX announcement dated 27 May 2024 “High-Grade Copper Assay Results in Rock Chip Samples from Vista Montana”.
7
Refer to ASX announcement dated 11 May 2022 “Culpeo intersects 257m @ 0.95% copper at Lana Corina”.
8
Refer to ASX announcement dated 6 June 2022 “Culpeo Minerals intersects 173m @ 1.05% copper”.
9
Refer to ASX announcement dated 23 November 2022 “Drilling intersects 169m @ 1.08% Cu grades up to 3.56% Cu”.
10
Refer to ASX announcement dated 2 May 2022 “Culpeo intersects 104m @ 0.74% copper at Lana Corina”.
11
Refer to ASX announcement dated 20 June 2022 “Multiple high-grade Cu intersections at Lana Corina Project”.
12
Refer to ASX announcement dated 7 August 2023 “CPO Acquires Significant New Tenement Package”.
13
Refer to ASX announcement dated 9 April 2024 “Compelling IP Chargeability Target Defined at Fortuna”.
14
Refer to ASX announcement dated 14 May 2024 “Reconnaissance Drilling Delivers Grades of up to 2.19% CuEq at Fortuna Project”.
15
Refer to ASX announcement dated 11 September 2023 “High Priority El Quillay North Target Defined”.
16
Refer to ASX announcement dated 17 January 2024 “Drilling Returns Wide Copper Intersections (Replacement)”.
17
Refer to ASX announcement dated 18 September 2024 “Surface Results up to 1.83% Copper Confirm High-Priority Targets at Fortuna”.
18
Refer to ASX announcement dated 2 October 2024 “Thick Surface Mineralisation Resturned from Outcropping Copper-Gold System at Fortuna Project, Chile.”
19
Refer to ASX announcement dated 1 November 2023 “New High-Grade Cu and Au Trend at Fortuna”.
20
Refer to ASX announcement dated 12 December 2023 “Culpeo extends Piedra Dura Mineralisation”.
21
Refer to ASX announcement dated 29 February 2024 “High-Grade Surface Cu and Au Confirmed at El Quillay South”.
22
Refer to ASX announcement dated 18 March 2024 “Culpeo Minerals Identifies New Target at Fortuna Project”.
23
Refer to ASX announcement dated 14 October 2024 “Appointment of Interim Executive Chairman”.
24
Refer to ASX announcement dated 2 August 2024 “Culpeo Secures Funding to Advance Copper Exploration at Vista Montana, Lana Corina and Fortuna”.
PAGE | 16
CULPEOMINERALS.COM.AU
Share your feedback
Discover