Noosa Mining Investor Conference Presentation
Released
Released
Announcement PDF
BREAK-THROUGH
COPPER DISCOVERY
IN THE LAND OF THE
COPPER GIANTS
ASX:CPO | OTCQB:CPORF NOVEMBER 2025
LANA CORINA
VISTA MONTANA
Disclaimer
CULPEO MINERALS ASX:CPO | OTCQB:CPORF 2
This Presentation and any accompanying verbal Presentation (together the Presentation) has been prepared by Culpeo Minerals Limited (Culpeo or the Company) and approved
by the Executive Chairman of the Company. The information contained in the Presentation (Information) is a summary only and should be read in conjunction with any oral briefing
and all other documents provided to you by the Company. The Information is current as of the date of this release and the Company does not undertake to provide any additional
or updated information, whether as a result of new information, future events or results or otherwise. By receiving the Presentation, you acknowledge and represent to the
Company that you have read, understood and accepted the terms of this disclaimer.
The Company has prepared the Presentation based on information available as of this release. No representation or warranty, express or implied, is made as to the currency,
accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Neither Culpeo, its related bodies corporate, shareholders
or affiliates, nor any of their respective officers, directors, employees, affiliates, agents or advisers (Agents) guarantee or make any representations or warranties, express or implied,
as to or take responsibility for, the currency, accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Culpeo does
not represent or warrant that this Presentation is complete or that it contains all material information about Culpeo or which a prospective investor or purchaser may require in
evaluating a possible investment in Culpeo or acquisition of shares. To the maximum extent permitted by law, Culpeo and its Agents expressly disclaim any and all liability,
including, without limitation, any liability arising out of fault or negligence, for any loss arising from the use of information contained in this Presentation, or otherwise arising in
connection with it.
Any forward-looking statements in this Presentation, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an
indication or guarantee of future performance and involve known and unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which are
outside the control of Culpeo and which are subject to change without notice and could cause the actual results, performance or achievements of Culpeo to be materially different
from the future results, performance or achievements expressed or implied by such statements. Past performance is not necessarily a guide to future performance and recipients of
this Presentation are cautioned not to place undue reliance on such forward-looking statements.
The information contained in this Presentation is for information purposes only, does not constitute investment or financial product advice (nor taxation, accounting or legal advice)
and is not intended to be used as the basis for making an investment decision. In providing this Presentation, Culpeo has not considered the objectives, financial position or needs
of any particular recipients. Before making an investment decision prospective investors should consider the appropriateness of the information in this Presentation having regard
to their own objectives, financial situation and needs, and seek legal, taxation and financial advice appropriate to their jurisdiction and circumstances.
This Presentation is not a prospectus, product disclosure statement or other offering document under Australian law or any other law (and will not be lodged with the Australian
Securities and Investments Commission, or any other foreign regulator) and is not, and does not constitute, an invitation or offer of securities for subscription, purchase or sale in
any jurisdiction. In particular, this Presentation does not constitute an invitation or offer of securities for subscription, purchase or sale in the United States or any other jurisdiction
in which such an offer would be illegal. The securities referred to in this Presentation have not been, and will not be, registered under the U.S. Securities Act of 1933 as amended or
the securities laws of any state or other jurisdiction of the United States and may not be offered or sold, directly or indirectly in the United States.
The information in this Presentation is strictly confidential. It may not be disclosed, reproduced, disseminated, quoted or referred to in whole or in part, without the express consent
of Culpeo.
INVESTOR PRESENTATION
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
CHILEAN COPPER
DEVELOPMENT
ESSENTIAL
FOR TECHNOLOGY
AND
ELECTRIFICATION
INVESTOR PRESENTATION 3
1. Refer Appendix 1 for additional details including CuEq calculation methodology.
2. Refer to ASX announcement dated 7 October 2025.
Culpeo confirms that it is not aware of any new information or data that materially affects the
information included in those releases. All material assumptions and technical parameters underpinning
those releases continues to apply and has not materially changed.
Antofagasta
CHILE
La Serena
Copiapo
PERU
ARGENTINA
Fortuna
Lana Corina
BOLIVIA
Santiago
Jupiter
Lana Corina Project3
High-grade outcropping copper
molybdenum discovery:
454m at 0.93% CuEq Mo
Cu
Fortuna Project1,2
Multiple outcropping copper targets,
grades of 9.78% Cu and 48.30g/t Au
Potential new discovery at La Florida4
6.10m at 1.35% Cu from 10m
Au
Cu
COPPER PROJECTS
ON THE
INFRASTRUCTURE
LADEN CHILEAN
COASTAL BELT
CULPEO MINERALS ASX:CPO | OTCQB:CPORF INVESTOR PRESENTATION 4
INVESTMENT HIGHLIGHTS
HIGH-QUALITY COPPER
DISCOVERY IN THE PREMIER
PRODUCING REGION
FEATURING THE NEWLY DISCOVERED HIGH-GRADE
LANA CORINA COPPER MOLYBDENUM PROJECT
100% CHILEAN ASSET FOCUS
THE LAND OF THE COPPER GIANTS
DYNAMIC AND SYSTEMATIC EXPLORATION
DESIGNED FOR MULTIPLE DISCOVERIES
PROVEN TEAM WITH DEEP LOCAL EXPERIENCE
POSITIONED TO DELIVER RAPID DEVELOPMENT
LANA CORINA
FORTUNA
Potential for Multiple High-Grade Copper Discoveries
CULPEO MINERALS ASX:CPO | OTCQB:CPORF INVESTOR PRESENTATION 5
District potential with outcropping prospects over 20km
Lana Corina Copper Molybdenum Discovery:
• 454m at 0.93% CuEq from 90m (CMLCD014)4; incl
• 78m at 1.24% CuEq from 200m.
La Florida First Ever Drill Programme intersected9:
• 6.65m at 1.03% Cu from 14.00m (CMLFD002);
• 6.10m at 1.35% Cu from 10.00m (CMLFD005);
• 16.0m at 0.7% Cu from 107.00m (CMLFD005); incl
• 7.47m at 1.36% Cu from 115.00m; incl
• 0.49m at 4.19% Cu from 121.50m.
Maiden Drill Programme indicates we are on the margin
of potential New Porphyry System
Second phase of drilling to commence Q1 2026
NEW HIGH-GRADE COPPER-MOLYBDENUM NEW
OUTCROPPING HIGH-GRADE COPPER4,9 PLAN VIEW OF PROJECTS1,2,3,4,5,6,7,8,9,10
Lana Corina Project
CULPEO MINERALS ASX:CPO | OTCQB:CPORF INVESTOR PRESENTATION 6
Breakthrough high-grade copper-molybdenum discovery
• 454m at 0.93% CuEq from 90m (CMLCD014)4; incl
78m at 1.24% CuEq from 200m.
• 257m at 1.10% CuEq from 170m (CMLCD002)1;
• 173m at 1.09% CuEq from 313m (CMLCD003)2;
• 169m at 1.21% CuEq from 239m (CMLCD010)3;
• 72m @ 0.91% CuEq from 352m (CMLCD013)7; incl
• 35m @ 1,704ppm Mo (0.84% CuEq) from 570m; incl
• 1m @ 15,000ppm Mo (6.09% CuEq) from 591m.
• Up to 2.62% copper, 2.07g/t gold and 11.2g/t silver from
rock chip sampling at Vista Montana
• Potential for 3km mineralised trend linking Lana Corina
to Vista Montana.
• Vista Montana to be drill tested in Q4 2025 and Q1 2026.
NEW HIGH-GRADE COPPER-MOLYBDENUM DISCOVERY LANA CORINA FROM SURFACE TO >600M 1,2,3,4,5,6
Lana Corina Project
CULPEO MINERALS ASX:CPO | OTCQB:CPORF INVESTOR PRESENTATION 7
North-easterly mineralised trend with outcropping copper targets over 3km1,2,3
NEW
IMAGE
HERE
3km mineralised
corridor linking Lana
Corina to Vista
Montana
Extensive
mineralised
breccias
mapped
VISTA
MONTANA
Interpreted
intrusive centre
Mineralised sheeted
veins 400m x 300m
Plan view showing Lana Corina detailed surface
geology map and the high priority targets1.
3KM MINERALISED
CORRIDOR LINKING
LANA CORINA TO
VISTA MONTANA
Mineralised sheeted
veins 400m x 300m
Interpreted
intrusive centre
VISTA
MONTANA
Extensive
mineralised
breccias
mapped
STOCK ZONE 400M X 400M
CORINA
LAURA
LANA
PORPHYRY TARGET
PORPHYRY TARGET
Lana Corina (LHS) and Vista
Montana (RHS) long section:
Defined targets over greater
than 3km of strike
(VOXI 3D magnetic inversion
model image)2,3
Magnetic low
Near surface breccia drill targets
Zoned porphyry target
Vista Montana
Lana Corina Project
North-easterly mineralised trend with outcropping copper targets over 3km
Lana Corina
3 kilometre strike potential
CULPEO MINERALS ASX:CPO | OTCQB:CPORF INVESTOR PRESENTATION 8
PHASE 1 DRILLING
(CMLCD014)
HIGH-GRADE CU
ZONE
454m at 0.93% CuEq
(90m - 544m)1
OPEN IN
ALL
DIRECTIONS
La Florida Prospect within the Fortuna Project
CULPEO MINERALS ASX:CPO | OTCQB:CPORF INVESTOR PRESENTATION 9
Outcropping targets immediately north of the Lana Corina Discovery
• Multiple zones of high-grade copper within a
1.7km by 500m structural corridor.
• First ever drill programme intersected1:
• 6.65m at 1.03% Cu from 14.00m (CMLFD002); incl
• 4.40m at 1.44% Cu from 15.00m.
• 6.10m at 1.35% Cu from 10.00m (CMLFD005).
• 16.0m at 0.7% Cu from 107.00m (CMLFD005); incl
• 7.47m at 1.36% Cu from 115.00m; incl
• 0.49m at 4.19% Cu from 121.50m.
• Maide drill programme results indicate we are
on the margins of New Porphyry System
HIGH-GRADE COPPER UP TO 4.19%1 LA FLORIDA MAIDEN DRILLING
Corporate Snapshot
CULPEO MINERALS ASX:CPO | OTCQB:CPORF INVESTOR PRESENTATION 10
9%
31%
60%
Board and management
Top 20
Other
Share price1 A$0.016
Shares on issue2 521M
Unlisted options and rights2 178M
Market capitalisation1,2 A$8.3M
Cash3 A$1.2M
Debt3 Nil
Enterprise value (undiluted) A$7.1M
CAPITAL STRUCTURE MAJOR SHAREHOLDERS
TIGHT REGISTER WITH SUPPORTIVE
EXPLORATION-FOCUSED SHAREHOLDER BASE
Compelling entry price offering strong leverage to further exploration success
1. As at 10 November 2025.
2. Post settlement of Tranche 2 Placement Shares and Options approved at a general meeting of shareholders on 3
July 2025.
3. Approximate cash balance as at 30 September 2025.
EXECUTIVE CHAIR NON-EXECUTIVE DIRECTOR NON-EXECUTIVE DIRECTOR CHILEAN COUNTRY MANAGER
Board and Senior Management
CULPEO MINERALS ASX:CPO | OTCQB:CPORF INVESTOR PRESENTATION 11
Geoff
McNamara
• Over 30 years’ of international resource
sector experience.
• Co-founder of Tesoro Gold Ltd which
discovered the El Zorro Gold Project Chile.
• Previously Director of Mining Finance at
Societe General, New York.
• Private Equity Manager for PRCM (FUM
US$800M).
• Previous operational roles include Project
Manager, Senior Mine Geologist and Mine
Geologist for Ivanhoe Mines, Lion Ore
International and WMC.
Zeffron
Reeves
• Geologist with more than 20 years’ of
resource experience, spanning greenfield
exploration, mineral discovery, definition
and feasibility, construction, production
and closure.
• Managing Director of ASX listed Tesoro
Gold Ltd, a company that has defined the
El Zorro Gold Project in Chile.
• Track record of exploration success
identifying and delineating new gold
districts in Brazil and Chile.
Paul
Schmiede
• Mining engineer with over 25 years’
experience in mining, exploration and
corporate development across gold and
base metal commodities within Australia,
Burkina Faso and DRC.
• Currently Vice President Corporate
Development TSS-V listed Sarama
Resources Ltd.
• Previously held senior roles with Moto
Goldmines, Gold Fields and WMC
Resources.
• Member of the Australasian Institute of
Mining and Metallurgy.
Sergio
Uribe
• Corporate administrator, manager and
development professional with deep
Chilean experience.
• More than 10 years’ resource sector
experience spanning greenfields
exploration, discovery production, closure,
retreatment and tailings reclamation.
• Country Manager for ASX listed Tesoro
Gold Ltd Chile, and previously General
Manager of Acorn Mining Chile and
Country Manager for Cleveland Mining
Chile.
Successful track record of discovery, project development and value creation
CULPEO MINERALS ASX:CPO | OTCQB:CPORF INVESTOR PRESENTATION 12
PROJECT ACTIVITY Q4-25 Q1-26 Q2-26 Q3-26
LANA
CORINA
Vista Montana drilling ■ ■
Lana Corina drilling ■ ■
FORTUNA
La Florida mapping, trenching and geophysics ■
2nd phase of diamond drilling at La Florida ■ ■
Follow up drilling El Quillay and Pedra Dura ■ ■
VISTA MONTANA
DRILLING Q4 2025
AND Q1 2026
ACTIVE COPPER
EXPLORATION
STRONG NEWS
FLOW THROUGH
2025 AND 2026
SET TO DELIVER
LARGE SCALE NEAR
SURFACE
DISCOVERIES
SET TO FOLLOW UP
MAIDEN DRILLING
SUCCESS AT LA
FLORIDA
CHILEAN COPPER
DEVELOPMENT
FOR A CLEAN
ENERGY FUTURE
FEATURING THE NEWLY DISCOVERED HIGH-GRADE
LANA CORINA COPPER MOLYBDENUM PROJECT
100% CHILEAN ASSET FOCUS
THE LAND OF THE COPPER GIANTS
DYNAMIC AND SYSTEMATIC EXPLORATION
DESIGNED FOR MULTIPLE DISCOVERIES
PROVEN TEAM WITH DEEP LOCAL EXPERIENCE
POSITIONED TO DELIVER RAPID DEVELOPMENT
CULPEO MINERALS ASX:CPO | OTCQB:CPORF INVESTOR PRESENTATION 13
APPENDICES
Course Chalcopyrite Veins 2.40% Cu (341.5 -342.5m) in CMLCD0051
Sulphides in Breccia 2.75% Cu (231 -232m) in CMLCD0051
CULPEO MINERALS ASX:CPO | OTCQB:CPORF INVESTOR PRESENTATION 15
• 454m at 0.93% CuEq from 90m (CMLCD014) 9; including
• 78m at 1.24% CuEq from 200m; and
• 68m at 1.14% CuEq from 320m; and
• 40m at 1.20% CuEq from 394m.
• 257m at 1.10% CuEq from 170m (CMLCD002)2;
• 173m at 1.09% CuEq from 313m (CMLCD003)3;
• 169m at 1.21% CuEq from 239m (CMLCD010)7;
• 104m at 0.81% CuEq from 155m (CMLCD001)1;
• 81m at 1.16% CuEq from 302m (CMLCD005)4;
• 72m at 0.91% CuEq from 352m (CMLCD013)8;
• 34.7m at 0.97% CuEq from 515m (CMLCD007)6; and
• 16.4m at 1.38% CuEq from 118m (CMLCD005A)5.
Appendix A
Lana Corina Diamond Drilling Results:
CULPEO MINERALS ASX:CPO | OTCQB:CPORF INVESTOR PRESENTATION 16
• Assumed commodity prices: Cu US$3.00/lb, Au US$1,700/oz, Mo US$14/lb and
Ag US$20/oz.
• Recoveries are assumed from similar deposits: Cu = 85%, Au = 65%, Ag = 65%,
Mo = 80%.
• CuEq (%) calculated using the following formula: {((Cu% x Cu price 1% per tonne
x Cu recovery) + (Au(g/t) x Au price per g/t x Au recovery) + (Mo ppm x Mo price
per g/t x Mo recovery) + Ag ppm x Ag price per g/t x Ag recovery)) / (Cu price 1%
per tonne x Cu recovery)}.
• CuEq (%): Cu (%) + (0.54 x Au (g/t)) + (0.00037 x Mo (ppm)) + (0.0063 x Ag (ppm)).
• It is the Company’s opinion that all elements included in the metal equivalents have
a reasonable potential to be recovered and sold.
Appendix B
Additional Information
COPPER EQUIVALENT (CuEq) VALUE CALCULATIONS COMPETENT PERSONS’ STATEMENTS
Slide 3: Refer to Appendix 1, (1) ASX announcement 12 December 2023; (2) ASX announcement 1 November 2023; (3)
ASX announcement 10 July 2024; (4) ASX announcement 7 October 2025. Slide 5: (1) ASX announcement 7 August 2023;
(2) ASX announcement 12 December 2023; (3) ASX announcement 1 November 2023; (4) ASX announcement 10 July
2024. (5) ASX announcement 21 November 2023; (6) ASX announcement 4 January 2024; (7) ASX announcement 17
January 2024; (8) ASX announcement 29 February 2024; (9) ASX announcement 7 October 2025; (10) ASX announcement
11 September 2023. Slide 6: (1) ASX announcement 11 May 2022; (2) ASX announcement 6 June 2022; (3) ASX
announcement 23 November 2022; (4) ASX announcement 10 July 2024; (5) ASX announcement 21 November 2023; (6)
ASX announcement 20 June 2022; (7) ASX announcement 17 January 2024. Slide 7: (1) ASX announcement 23 August
2022; (2) ASX announcement 18 May 2022: (3) ASX announcement 27 May 2024. Slide 8: (1) Refer to ASX announcement
dated 10 July 2024; (2) ASX announcement 1 November 2023; (3) ASX announcement 12 December 2023. Slide 9: (1)
ASX announcement 21 November 2023. Slide 14: (4) ASX announcement 20 June 2022. Slide 15: (1) ASX announcement
2 May 2022; (2) ASX announcement 11 May 2022. (3) ASX announcement 6 June 2022; (4) ASX announcement 20 June
2022; (5) ASX announcement 6 September 2022; (6) ASX announcement 19 July 2022; (7) ASX announcement 23
November 2022; (8) ASX announcement 16 January 2023; (9) ASX announcement 10 July 2024.
REFERENCES
The information in this announcement that relates to the historic Exploration Results and Geophysical Results as listed
in the table below is based on, and fairly represents, information and supporting documentation prepared by the
Competent Person whose name appears in the same row, who is a Director or shareholder of or independent
consultant to the Company and is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM),
Australian Institute of Geoscientists (AIG), Australian Society of Exploration Geophysics (ASEG), or a Recognised
Professional Organisation (RPO). Each person named in the table below has sufficient experience which is relevant to
the style of mineralisation and types of deposits under consideration and to the activity which he has undertaken to
quality as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves.
Activity Competent Person Membership Status
Exploration Results
(until 31 Oct 2024)
Mr Maxwell Donald Tuesley
(Shareholder and former Director)
AusIMM Member
Exploration Results
(after 31 Oct 2024)
Mr Zeffron Reeves
(Director and Shareholder)
AIG Member
Geophysical Results
Mr Nigel Cantwell
(Consultant)
AIG and ASEG Member
Appendix C
CULPEO MINERALS ASX:CPO | OTCQB:CPORF INVESTOR PRESENTATION 17
Earn-In Schedules
Lana
Corina1
Period from
original signing
Consideration2 Work
Commitment
Stage
Interest
Aggregate
Interest
(Months) (US$) Description (%) (%)
1 Signing 100,000 N/A 0 0
2 12 150,000 US$1M expenditure 20 20
3 24 250,000 US$1M expenditure 30 50
4 3rd May 2025 100,000 N/A 0 50
5 4th March 2026 750,000 N/A 5 55
6 4 September 2026 700,000 N/A 10 65
7 4 September 2027 1,000,000 N/A 5 70
8 4 September 2027 1,650,000 N/A 10 80
Fortuna3 Period from
original signing
Cash
Consideration
Work
Commitment
Stage
Interest
Aggregate
Interest
(Months) (US$) Description (%) (%)
1 12 120,000 N/A 80 80
2 24 120,000 N/A 0 80
3 36 120,000 N/A 0 80
4 48 120,000 N/A 0 80
5 60 120,000 US$1M expenditure4
0 80
1. Refer to ASX announcement dated 28 April 2025.
2. Culpeo has the option of cash or share payments in the remaining four stages under the Earn-In schedule.
3. Refer to ASX announcement dated 7 Augst 2023.
4. Expenditure at Lana Corina can be included in required amount for Fortuna.
5. Refer to ASX announcement dated 14 April 2025.
6. ASX announcement 20 June 2022
Jupiter5 Period from
original signing
Cash
Consideration
Work
Commitment
Stage
Interest
Aggregate
Interest
(Months) (US$) Description (%) (%)
1 Signing 40,000 N/A 0 0
2 12 80,000 N/A 0 0
3 24 200,000 2,000m of drilling 51 51
4 36 300,000 2,000m of drilling 0 51
5 48 380,000 N/A 0 51
6 60 1,000,000 2,000m of drilling 29 80
CULPEO MINERALS ASX:CPO | OTCQB:CPORF INVESTOR PRESENTATION 18
CHILEAN COPPER
DEVELOPMENT
CONTACT
LEVEL 39, 152-158 ST GEORGES
TERRACE
PERTH WA 6000
+61 (8) 6311 9160
info@culpeominerals.com.au
geoff.mcnamara@culpeominerals.com.au
Share your feedback
Discover