Maiden Drilling Programme Commences at Vista Montana
Released
Released
Announcement PDF
CULPEOMINERALS.COM.AU
PAGE |1
ASX ANNOUNCEMENT
9 SEPTEMBER 2026
ASX:CPO OTCID:CPORF
MAIDEN DRILLING PROGRAMME
COMMENCES AT VISTA MONTANA
Culpeo Minerals Limited (Culpeo or the Company) (ASX: CPO, OTCQID: CPORF) is pleased
to report that its maiden drilling programme has commenced at the Vista Montana Prospect,
which lies within the Lana Corina Project (the Project), Chile.
The initial four-hole, 2,000m diamond drilling programme will test the continuity and scale
of the Lana Corina Project’s mineralised system which has already produced strong copper
intersections including 454m at 0.96% CuEq1
from 90m and 257m at 1.10% CuEq from 170m2
.
The Company has also commenced additional ground-geophysical surveys to assist drill
targeting along Project’s prospective 3km-long structural corridor.
HIGHLIGHTS
• A 2,000m diamond drilling programme has commenced at the Vista Montana
Prospect
• IP surveys have commenced at Lana Corina and Vista Montan to enhance drill
targeting
Culpeo Minerals’ Non-Executive Chair, Geoff McNamara commented:
“We are delighted to have commenced the maiden diamond drilling at Vista Montana which has the
potential to materially expand the Lana Corina discovery and with the recently commenced IP survey,
will help refine existing targets and potentially identify new targets along this highly prospective >3km
structural corridor.”
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 SEPTEMBER 2026
PAGE |2
VISTA MONTANA MAIDEN DIAMOND DRILLING PROGRAMME
The maiden diamond drill hole (CMVMD001) has commenced at the Vista Montana Prospect
(Figure 1).
The initial four-hole, 2,000m diamond drilling programme is designed to test key targets within the
interpreted mineralised corridor at Vista Montana. The programme will provide the first substantial
assessment of a prospect characterised by a large, mineralised footprint and strong depth extension
potential as evidenced by geochemistry and geophysical anomalies The programme aims to evaluate
the continuity, scale and overall prospectivity of this mineralising system.
The programme may be extended subject to geological observations and results from initial drilling.
Figure 1: Drilling of CMVMD001 at Vista Montana
CMVMD001 is planned to reach 600m depth and is targeting a large demagnetised zone that is
interpreted to be coincident with Cu-Mo porphyry style mineralisation. The demagnetisation is
potentially a result of the influx of mineralised hydrothermal fluids and is seen as the cooler blue
colours in Figure 2.
Previous drilling results at Lana Corina include:
• 454m at 0.96% CuEq from 90m in CMLCD014¹
• 257m at 1.10% CuEq from 170m in CMLCD002²;
• 173m at 1.09% CuEq from 313m in CMLCD003³;
• 169m at 1.21% CuEq from 239m in CMLCD010⁴;
• 104m at 0.83% CuEq from 155m in CMLCD01A⁵;
• 81m at 1.14% CuEq from 302m in CMLCD005A⁶;
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 SEPTEMBER 2026
PAGE |3
Figure 2: Lana Corina magnetic data image projected long section highlighting porphyry target areas and
including the planned drill area at Vista Montana and planned drill trace of CMVMD0011
Vista Montana is located 1km north-east of the Lana Corina Cu-Mo discovery and is
interpreted to form part of the same north-northeast trending mineralised corridor (Figure 3).
The Prospect has been defined through a combination of ground magnetic surveying, geological
mapping, geochemical soil sampling and rock chip sampling.
This work has identified numerous copper and gold mineralised quartz veins and breccias within the
target corridor. The corridor is also characterised by phyllic alteration, comprising quartz, sericite and
pyrite, observed at surface. This alteration assemblage is often associated with porphyry-style copper
mineralisation and supports Vista Montana’s ranking as a priority drill target for Culpeo.
Demagnetisation of host rocks along the structural corridor is interpreted to reflect
hydrothermal alteration associated with a copper mineralising event, consistent with
observations at Lana Corina (Figure 4).
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 SEPTEMBER 2026
PAGE |4
Figure 3: Vista Montana and Lana Corina geological setting with multiple targets1
Figure 4: Vista Montana and Lana Corina target areas on magnetic background1
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 SEPTEMBER 2026
PAGE |5
LANA CORINA IP PROGRAMME
The TITAN DCIP survey will provide high resolution resistivity and chargeability imaging to over 500m
deep along prospective geological corridors.). Six east-west orientated lines for a total of 9.6 line km
are planned to cover the Vista Montana Prospect, and one northwest-southeast line 1.8km in length
is planned to cover the Lana Corina Deposit. Two of the Vista Montana lines have been completed.
IP surveys in copper exploration are used to detect subsurface disseminated sulphide minerals (such
as chalcopyrite and bornite) associated with copper deposits. IP measures how well the ground
"stores" an electrical charge (chargeability) to accurately identify unexposed ore bodies and pinpoint
high-priority drilling targets. The survey of resistivity measures the ground's resistance to electrical
flow. This helps map different rock types, alteration zones, and geological structures. This survey will
be completed in mid-September with results to follow within a week from completion.
EL QUILLAY SOUTH DRILLING PROGRAMME
Two drill holes (CMQD004 and CMQD005) have been completed for a total of 505.95m. Assays have
been received for CMQD004, and these included the following intersections (Table 1). Samples from
CMQD005 will be sent for assaying this week and assays are expected in three weeks’ time.
Table 1: Summary of assays in CMQD004
From To Width (m) Au_ppm Cu_% CuEq_%
68.7 75.0 5.5 0.16 0.28 0.40
inc. 73.1 75.0 1.9 0.65 0.76 1.32
146.6 148.2 1.6 0.07 0.92 0.76
inc. 147.6 148.2 0.6 0.10 1.61 1.71
152.0 153.0 1.0 0.04 0.47 0.51
161.5 163.0 1.5 0.01 0.20 0.29
233.0 234.5 1.5 0.77 0.58 1.27
inc. 233.0 233.5 0.5 1.02 1.13 2.11
and. 234.0 234.5 0.5 1.28 0.51 1.58
244.0 245.6 1.6 0.06 0.29 0.34
Minimum grade: ≥0.2% Cu or ≥0.2 g/t Au, Minimum width: ≥ 0.5m (minimum sample), No Internal dilution applied.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 SEPTEMBER 2026
PAGE |6
Figure 5: Culpeo Minerals primary project areas, showing significant drilling results,2,3,4,5,6,7
CONTACT
Geoff McNamara
Non-Executive Chairman
E: geoff.mcnamara@culpeominerals.com.au
P: +61 (08) 6383 7894
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 SEPTEMBER 2026
PAGE |7
ABOUT CULPEO MINERALS LIMITED
Culpeo Minerals Limited is a copper-focused exploration and development company with a strategic
portfolio of high-quality assets located in Chile, the world’s leading copper-producing jurisdiction.
The Company is targeting high-grade copper systems within Chile’s infrastructure-rich Coastal
Cordillera, a proven belt hosting multiple major copper deposits.
Culpeo has delivered a significant copper and molybdenum discovery at the Lana Corina Project and
continues to systematically advance its highly prospective Fortuna Project. These assets form the
basis of a focused growth and discovery strategy aiming at unlocking district-scale potential through
disciplined exploration and staged project advancement.
The Lana Corina and Fortuna Projects are located in Chile’s Coquimbo Region, approximately 350
kilometres north of Santiago, in proximity to the world-class Los Pelambres mine. Both projects host
extensive outcropping copper mineralisation and are situated in areas supported by well-developed
infrastructure, including road access, power transmission, water availability and a skilled local mining
workforce - factors critical in enabling cost-effective and efficient development
The Company is led by a highly experienced Board and management team with a strong track record
of exploration success and operational delivery in Chile. Culpeo’s strategy is centred on creating
shareholder value through the discovery and development of high-grade, near-surface copper
systems in a Tier 1 mining jurisdiction, supported by a clear pathway to development and scalability.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 SEPTEMBER 2026
PAGE |8
COMPETENT PERSONS’ STATEMENTS
The information in this report that relates to Exploration Results is based on information compiled
by Mr Ed Turner (B App Science - Geology). Mr Turner is a member of the Australian Institute of
Geoscientists and a full-time employee of the Company. Mr Turner has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration and to the activity
which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr
Turner consents to the inclusion in this report of the matters based on this information in the form
and context in which it appears.
The information in this announcement that relates to the historic Exploration Results as listed in the
table below is based on, and fairly represents, information and supporting documentation prepared
by the Competent Person whose name appears in the same row, who is a Director or shareholder of
or independent consultant to the Company and is a Member of the Australasian Institute of Mining
and Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG), or a Recognised Professional
Organisation (RPO). Each person named in the table below has sufficient experience which is relevant
to the style of mineralisation and types of deposits under consideration and to the activity which he
has undertaken to quality as a Competent Person as defined in the 2012 Edition of the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.
Activity Competent Person Membership Status
Exploration Results (until 31 Oct 2024) Mr Maxwell Tuesley (Shareholder and former Director) AusIMM Member
Exploration Results (after 31 Oct 2024) Mr Zeffron Reeves (Director and Shareholder) AIG Member
The Company confirms that it is not aware of any new information or data that materially affects the Exploration
Results information included in previous announcements. The Company confirms that the form and context in
which the applicable Competent Persons’ findings are presented have not been materially modified from the
previous announcements.
FORWARD LOOKING STATEMENTS
This document may include forward-looking statements. Forward-looking statements include, but are not
limited to, statements concerning Culpeo Minerals Limited’s planned exploration program and other
statements that are not historical facts. When used in this document, the words such as "could," "plan,"
"estimate," "expect," "intend," "may”, "potential," "should," and similar expressions are forward-looking
statements. Although Culpeo Minerals Limited believes that its expectations reflected in these forward-looking
statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that
actual results will be consistent with these forward-looking statements.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 SEPTEMBER 2026
PAGE |9
Appendix A: Technical Details
Assumed commodity prices: Cu US$4.75/lb, Au US$3,200/oz, Mo US$20/lb and Ag US$35/oz. Recoveries are
assumed from similar deposits: Cu 85%, Au 65%, Ag 65% and Mo 80%.
CuEq (%) is calculated using the following formula:
((Cu% x Cu price 1% per tonne x Cu recovery) + (Au(g/t) x Au price per g/t x Au recovery) + (Mo g/t x Mo price
per g/t x Mo recovery) + (Ag g/t x Ag price per g/t x Ag recovery)) / (Cu price 1% per tonne x Cu recovery).
CuEq (%) = Cu (%) + (0.83 x Au (g/t)) + (0.00040 x Mo (g/t)) + (0.009 x Ag (g/t)).
It is the Company’s opinion that all elements included in the metal equivalent calculation have a reasonable
potential to be recovered and sold.
Appendix B: References
1. ASX Announcement dated 10 July 2024 “Lana Corina Drill Results Extended – 454m @ 0.93% CuEq”.
2. ASX Announcement dated 11 May 2022 “Culpeo Intersects 257m @ 0.95% copper at Lana Corina”.
3. ASX Announcement dated 6 June 2022 “Culpeo Minerals Intersects 173m @ 1.05% copper”.
4. ASX Announcement dated 23 November 2022 “Drilling Intersects 169m @ 1.08% Cu Grades up to 3.56% Cu”.
5. ASX Announcement dated 2 May 2022 “Culpeo Intersects 104m @ 0.74% copper at Lana Corina”.
6. ASX Announcement dated 20 June 2022 “Multiple High-Grade Cu Intersections at Lana Corina”.
7. ASX Announcement dated 10 November 2025 “Noosa Mining Investor Conference Presentation”.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 SEPTEMBER 2026
PAGE |10
APPENDIX C: JORC CODE TABLE 1 – FORTUNA PROJECT
SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down-hole gamma sondes, or
handheld XRF instruments, etc.). These examples
should not be taken as limiting the broad meaning of
sampling.
• At El Quillay South Culpeo has completed
two diamond drill holes for 505.95m.
Diamond drill holes were drilled with HQ.
Sampling was half core at geologically
defined and significant mineralisation
boundaries.
• The CP considers the sampling
methodologies to be appropriate for this
style of mineralisation.
• Diamond drilling was used to obtain half core
samples of various lengths (minimum 0.25m),
from which samples were delivered to ALS
laboratories in Chile where the following
analytical techniques were undertaken: Au-
AA24, Au-GRA22, Cu-AA62, Mo-AA62 and
Ag-AA62
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g. ‘Reverse circulation’ drilling was used to
obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases,
more explanation may be required, such as where there
is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc.) and
details (e.g. core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method,
etc.).
• two holes for a total of 505.95 metres of
diamond drilling was undertaken.
• Sampling and chemical analysis was
undertaken for 232 samples, 232 analyses for
copper, gold, silver and molybdenum.
•
Drill sample
recovery
Method of recording and assessing core and chip
sample recoveries and results assessed.
• Core recovery was estimated using the
drillers recorded depth marks against the
length of the core recovered. Reviewing the
core photos, there are occasional
shears/faults where core is broken. There is
however no significant core loss. For the 2026
drilling program all HQ3 drilling is oriented,
with bottom of hole marked.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Logging Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
• For the drilling program, logging is
undertaken for Lithology, Alteration,
Mineralisation and Structural Controls.
• Logging of diamond core was qualitative,
and diamond core was photographed.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
The total length and percentage of the relevant
intersections logged.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half
or all core taken.
• For the 2026 program, half core is sampled.
• No percussion drilling has been completed
• The sample preparation of crushing half core
at the lab to mm size prior to splitting off a
250g (either by cone/quarter or riffle) for
pulverisation provides an appropriate and
representative sample for analysis.
• Half core was collected for the entirety of the
Culpeo drilling, as such there was consistency
throughout the drilling. Core was logged by
a qualified geoscientist. Each sub-sample is
If non-core, whether riffled, tube sampled, rotary split,
etc. and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 SEPTEMBER 2026
PAGE |11
Criteria JORC Code explanation Commentary
including for instance results for field duplicate/second-
half sampling.
considered to be representative of the
interval.
• Sampling of half core is representative of the
in-situ material.
• Sample sizes collected were considered
appropriate to reasonably represent the
material being tested
Whether sample sizes are appropriate to the grain size
of the material being sampled.
Quality of
assay data and
laboratory
tests
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
• For the 2026 drilling programs - standards
and blanks are routinely inserted in sample
batches and a QAQC program is in place.
• Assays reported in this report were
undertaken at the accredited laboratory of
ALS Santiago, which is fully certified. Core
samples of various lengths were assayed
(minimum 0.25m) from which 250g of
material was pulverized passing 200 mesh
standards and blanks were regularly inserted
in sample batches and monitored as part of
the company’s QAQC procedure.
• Standard chemical analyses were used for
grade determination. There was no reliance
on determination of analysis by geophysical
tools.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (i.e.
lack of bias) and precision have been established.
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
• For the 20256drilling program, a high-quality
database is maintained, and protocols are in
place to ensure this data is checked by both
the Senior Geologist and Geology Manager.
• No twin holes have been completed due to
the early stage of the project.
• Drilling is digitally entered and stored
following documented core handling
protocols. The protocols are considered
adequate.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Location of
data points
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral Resource
estimation.
• For the 2026 drilling program, hole collars are
established using a handheld GPS, downhole
surveys are undertaken using a north seeking
gyroscope.
• The grid system used PSAD56 19S.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results. • Drill hole spacing is variable with holes
targeted at specific geological features at this
early stage of exploration.
• No Mineral resource is being reported.
Whether the data spacing and distribution is sufficient
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications
applied
Whether sample compositing has been applied.
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
• Drilling orientations are not considered to be
biased with several drilling orientations used.
• Drill holes were drilled across the interpreted
strike of the mineralisation.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Sample
security
The measures taken to ensure sample security. • Chain of Custody of digital data is managed
by the Company. Physical material was stored
on site and, when necessary, delivered to the
assay laboratory. Thereafter laboratory
samples were controlled by the nominated
laboratory which to date is ALS Santiago. All
sample collection was controlled by digital
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 SEPTEMBER 2026
PAGE |12
Criteria JORC Code explanation Commentary
sample control file(s) and hardcopy ticket
books.
Audits or
reviews
The results of any audits or reviews of sampling
techniques and data.
• No audits have been undertaken.
SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location and ownership
including agreements or material issues with third parties such
as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate
in the area.
• The Fortuna Project area comprises
21 exploitation concessions, which
cover a total area of approximately
1,775 Hectares. Culpeo Minerals has
agreements in place to earn up to
80%. It also comprises 31
exploration concessions totalling
5,516 Hectares that are 100%
owned by Culpeo.
Exploration done by
other parties
Acknowledgment and appraisal of exploration by other parties. • Historic exploration was undertaken
by Inversiones Em Dos Limitada
from 2007 to the present.
• Alara Resources undertook a 17
hole drilling program at El Quillay
from 2011 to 2012 and also
undertook an IP geophysical survey.
Geology Deposit type, geological setting, and style of mineralisation. • The Fortuna Project is associated
with a structural belt orientated in a
NS / NW direction, about 6km long
and 500m wide. Mineralisation is
predominantly copper with
accessory gold, silver, and
molybdenum. Mineralisation is
structurally controlled and
associated with breccias and
intrusive units.
Drillhole
Information
A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all material drillholes:
• easting and northing of the drillhole collar
• elevation or RL (elevation above sea level in metres) of the
drillhole collar
• dip and azimuth of the hole
• down hole length and interception depth hole length
• CMQD004 is located at
6,569,590N/298,198E and drilled at
a dip of -65 towards 070 azimuth
finishing at 305.5m. CMQD005 is
located at 6569221N/298219E and
drilled at a dip of -65 towards 080
azimuth.
Data aggregation
methods
In reporting exploration results, weighting averaging
techniques, maximum and/or minimum grade truncations (e.g.
cutting of high grades) and cut-off grades are usually material
and should be stated.
• No cutting of grades has been
undertaken at this early stage of
exploration drilling.
• Significant results are calculated
using a length weighted averaging
method.
Relationship
between
mineralisation
widths and intercept
lengths
If the geometry of the mineralisation with respect to the
drillhole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (e.g. ‘down hole
length, true width not known’).
• True width of mineralisation is
unknown.
Diagrams Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery
being reported. These should include, but not be limited to, a
plan view of drillhole collar locations and appropriate sectional
views.
• No significant discovery is being
reported.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 SEPTEMBER 2026
PAGE |13
Criteria JORC Code explanation Commentary
Balanced reporting Where comprehensive reporting of all exploration results is not
practicable, representative reporting of both low and high
grades and/or widths should be practiced avoiding misleading
reporting of exploration results.
• Results have been reported for the
main elements targeted (Cu, Au).
Other substantive
exploration data
Other exploration data, if meaningful and material, should be
reported including, but not limited to, geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
• N/A
Further work The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
• Two further diamond drill holes for
a total of 400m are planned at El
Quillay South along strike from
these holes.
Share your feedback