Strong IP Anomalies Define Priority Drill Targets at Fortuna
Released
Released
Announcement PDF
info@culpeominerals.com.au 31 CLIFF STREET, FREMANTLE 6160 61 (8) 6383 7894
ASX ANNOUNCEMENT
18 AUGUST 2026
ASX:CPO OTCID:CPORF
STRONG IP ANOMALIES DEFINE PRIORITY DRILL
TARGETS AT FORTUNA
Culpeo Minerals Limited (Culpeo or the Company) (ASX: CPO, OTCQID: CPORF) is pleased
to report identification of two strong chargeability anomalies from a recently completed
Induced Polarisation (IP) survey at the El Quillay North Prospect and a newly defined
prospect, El Quillay West both within the Fortuna Project, in Chile.
Both anomalies coincide with surface copper mineralisation and alteration, with previous
rock-chip sampling having returned assays greater than 1.0% copper in areas overlying the
geophysical responses.
The two targets have been prioritised for diamond drilling.
HIGHLIGHTS
• Two strong chargeability anomalies delineated in recently completed IP survey1
.
• Both anomalies coincide with surface copper mineralisation, alteration and
previous rock-chip assays >1.0% Cu.
• El Quillay North anomaly extends over approximately 500m x 200m, including a
stronger 300m x 200m chargeability high.
• Newly defined El Quillay West is a discrete 300m x 300m “bullseye” anomaly and
the strongest response identified from the southern IP lines.
• 500m of initial diamond drilling planned, comprising one 250m hole into each
anomaly.
Culpeo Minerals’ Non-Executive Chair, Geoff McNamara commented:
“We are delighted that the IP survey has already defined two additional drill targets that we know are
associated with surface mineralisation. Drilling of these targets will commence immediately following
the completion of drilling at the El Quillay South2
which is in progress, so we expect a continuous flow
of assay results over the coming months”.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 18 AUGUST 2026
PAGE |2
FORTUNA IP PROGRAMME
An IP survey using the Pole-Dipole IP (PDIP) method commenced within the Company’s Fortuna
Project in early July comprising ten survey lines for a total of 24line km’s of surveying. The survey was
designed to assess multiple high-priority copper-gold targets within the La Florida, El Quillay North,
El Quillay South, and Piedra Dura Prospects and identify chargeable anomalies and electrically
conductive anomalies associated with sulphide minerals and subsurface geology to assist with drill
targeting.
The five southern PDIP survey lines have an east-west orientation which have defined two strong
chargeability anomalies at El Quillay North (EQN) and at a new prospect named El Quillay West
(EQW).
Surface mapping has identified hydrothermal alteration and Cu-oxide mineralisation in numerous
locations over these IP anomalies. Previous rock chip sampling in this area has returned values
of >1% Cu above both IP anomalies (Figure 1).
Figure 1: Surface rock chip samples on geological background over both drill target areas.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 18 AUGUST 2026
PAGE |3
Strong IP chargeability anomalies may be a result of disseminated copper (Cu) sulphide
mineralisation that is found in porphyry and Iron Oxide Copper Gold (IOCG) style mineralised
bodies found through the Chilean IOCG belt (see Figure 6 and regional map at the bottom of this
release).
Host rocks at Quillay consist of volcanic and volcaniclastic sequences showing veins and fractures
with Fe-oxide and Cu-oxide minerals. In the IP survey area, outcrops of dioritic intrusives have been
observed, that have been affected by silica–albite–sericite alteration, and associated copper oxide,
iron oxide, specular hematite, and jarosite mineralization.
Two diamond drill holes have been planned to test the IP anomalies with one 250m hole at
each prospect. Drilling will commence following completion of the current El Quillay South
drill programme.
The IP anomaly on L2050N consists of two chargeability highs of approximately 500m x 200m and
300m x 200m in size (Figures 2 and 3). Nearby Cu mineralisation in veins has been historically mined
at small scale from surface. The IP chargeability anomaly is interpreted to be the deeper source of
the known Cu veins.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 18 AUGUST 2026
PAGE |4
Figure 2: L2050N IP survey line with chargeability cross-section projected to surface on its side, and
planned drill hole trace to test this anomaly at depth.
Figure 3: 3D view of the IP chargeability response along survey line L2050N with planned drill hole
trace.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 18 AUGUST 2026
PAGE |5
The IP programme has also defined a new prospect at El Quillay West with a “bullseye” IP target
identified which is potentially associated with Cu sulphide mineralisation on L1700N. The new target
measures approximately 300m x 300m (Figures 4 and 5).
Figure 4: IP survey line L1700N with chargeability section projected to surface on its side and planned
drill hole trace to test this anomaly at depth.
Figure 5: 3D view of IP chargeability response along survey line L1700N with planned drill hole trace.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 18 AUGUST 2026
PAGE |6
Figure 6: Culpeo Minerals primary project areas, with significant drilling results3
CONTACT
Geoff McNamara
Non-Executive Chairman
E: geoff.mcnamara@culpeominerals.com.au
P: +61 (08) 6383 7894
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 18 AUGUST 2026
PAGE |7
ABOUT CULPEO MINERALS LIMITED
Culpeo Minerals Limited is a copper-focused exploration and development company with a strategic
portfolio of high-quality assets located in Chile, the world’s leading copper-producing jurisdiction.
The Company is targeting high-grade copper systems within Chile’s infrastructure-rich Coastal
Cordillera, a proven belt hosting multiple major copper deposits.
Culpeo has delivered a significant copper and molybdenum discovery at the Lana Corina Project and
continues to systematically advance its highly prospective Fortuna Project. These assets form the
basis of a focused growth and discovery strategy aiming at unlocking district-scale potential through
disciplined exploration and staged project advancement.
The Lana Corina and Fortuna Projects are located in Chile’s Coquimbo Region, approximately 350
kilometres north of Santiago, in proximity to the world-class Los Pelambres mine. Both projects host
extensive outcropping copper mineralisation and are situated in areas supported by well-developed
infrastructure, including road access, power transmission, water availability and a skilled local mining
workforce - factors critical in enabling cost-effective and efficient development
The Company is led by a highly experienced Board and management team with a strong track record
of exploration success and operational delivery in Chile. Culpeo’s strategy is centred on creating
shareholder value through the discovery and development of high-grade, near-surface copper
systems in a tier one mining jurisdiction, supported by a clear pathway to development and
scalability.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 18 AUGUST 2026
PAGE |8
COMPETENT PERSONS’ STATEMENTS
The information in this report that relates to Exploration Results is based on information compiled
by Mr Ed Turner (B App Science - Geology). Mr Turner is a member of the Australian Institute of
Geoscientists and a full-time employee of the Company. Mr Turner has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration and to the activity
which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr
Turner consents to the inclusion in this report of the matters based on this information in the form
and context in which it appears.
The information in this report that relates to Geophysical Results is based on information compiled
by Dr Jayson Meyers who is a Fellow of the Australian Institute of Geoscientists. Dr Meyers is a
consultant to Culpeo Minerals Limited and has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Meyers consents to the
inclusion in this report of the matters based on information provided by him and in the form and
context in which it appears. Dr Meyers does not hold any securities in the Company.
The information in this announcement that relates to the historic Exploration Results as listed in the
table below is based on, and fairly represents, information and supporting documentation prepared
by the Competent Person whose name appears in the same row, who is a Director or shareholder of
or independent consultant to the Company and is a Member of the Australasian Institute of Mining
and Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG), or a Recognised Professional
Organisation (RPO). Each person named in the table below has sufficient experience which is relevant
to the style of mineralisation and types of deposits under consideration and to the activity which he
has undertaken to quality as a Competent Person as defined in the 2012 Edition of the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.
Activity Competent Person Membership Status
Exploration Results (until 31 Oct 2024) Mr Maxwell Tuesley (Shareholder and former Director) AusIMM Member
Exploration Results (after 31 Oct 2024) Mr Zeffron Reeves (Director and Shareholder) AIG Member
The Company confirms that it is not aware of any new information or data that materially affects the Exploration
Results information included in previous announcements. The Company confirms that the form and context in
which the applicable Competent Persons’ findings are presented have not been materially modified from the
previous announcements.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 18 AUGUST 2026
PAGE |9
FORWARD LOOKING STATEMENTS
This document may include forward-looking statements. Forward-looking statements include, but are not
limited to, statements concerning Culpeo Minerals Limited’s planned exploration program and other
statements that are not historical facts. When used in this document, the words such as "could," "plan,"
"estimate," "expect," "intend," "may”, "potential," "should," and similar expressions are forward-looking
statements. Although Culpeo Minerals Limited believes that its expectations reflected in these forward-looking
statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that
actual results will be consistent with these forward-looking statements.
Appendix A: Technical Details
Assumed commodity prices: Cu US$4.75/lb, Au US$3,200/oz, Mo US$20/lb and Ag US$35/oz.
Recoveries are assumed from similar deposits: Cu 85%, Au 65%, Ag 65% and Mo 80%.
CuEq (%) is calculated using the following formula:
((Cu% x Cu price 1% per tonne x Cu recovery) + (Au(g/t) x Au price per g/t x Au recovery) + (Mo g/t
x Mo price per g/t x Mo recovery) + (Ag g/t x Ag price per g/t x Ag recovery)) / (Cu price 1% per
tonne x Cu recovery).
CuEq (%) = Cu (%) + (0.83 x Au (g/t)) + (0.00040 x Mo (g/t)) + (0.009 x Ag (g/t)).
It is the Company’s opinion that all elements included in the metal equivalent calculation have a
reasonable potential to be recovered and sold.
Appendix B: References
1.
Refer to ASX announcement dated 13 July 2026 “IP Survey Commences at the Fortuna Project”.
2.
Refer to ASX announcement dated 6 July 2026 “Drilling Underway At El Quillay South”.
3.
Refer to ASX announcement dated 20 July 2026 “Culpeo Minerals Expands Landholding By 45%”.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 18 AUGUST 2026
PAGE |10
APPENDIX C: JORC CODE TABLE 1 – FORTUNA PROJECT
SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such
as down-hole gamma sondes, or handheld XRF instruments,
etc.). These examples should not be taken as limiting the
broad meaning of sampling.
• At Fortuna Culpeo has completed rock chip
sampling at sites selected during geological
mapping that were considered to be
mineralised. All samples were taken as rock
chips using a hammer. Samples average 3kg
and were between 2 and 4kg in size.
• The CP considers the sampling
methodologies to be appropriate for this
style of mineralisation however rock chip
sampling is a point sample rather than an
interval sampling so cannot be used to
estimate the grade of a given area.
• No drilling results are being reported here.
Samples were sent to ALS laboratories in
Santiago, Chile where several assaying
methods. When assaying just for Cu, Au, Ag
and Mo the ME-OG62 analytical was used
(Au-AA24, Cu-AA62, Mo-AA62 and Ag-
AA62). For the 26 multi-element suite the
ME-MS61 method was used:
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation’ drilling was used to obtain
1 m samples from which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has
inherent sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules) may warrant
disclosure of detailed information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
• No drill results are being reported here.
Drill sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
• No drill results are being reported here.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Logging Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
• All rock chip samples were logged for
lithology, mineralisation and alteration. Rock
chip sampling is not appropriate for
supporting a Mineral Resource estimate.
• Logging of rock chip samples is qualitative
in nature.
• No intersections were logged. All samples
represent points and not intervals.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
The total length and percentage of the relevant intersections
logged.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half or all
core taken.
• No core was sampled.
• Rock chip samples do not undergo any of
these processes.
• No sample preparation or sub sampling was
completed with the rock chip samples prior
to submission to the laboratory for assay.
• The rock chips taken are considered to be
representative of mineralisation at the point
they were taken from only. Field duplication
is not appropriate for this method of
sampling at this time.
• 2-4kg samples are appropriate for the grain
size of the material sampled.
If non-core, whether riffled, tube sampled, rotary split, etc.
and whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness
of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected, including for
instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 18 AUGUST 2026
PAGE |11
Criteria JORC Code explanation Commentary
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• The assaying methods reported here were
undertaken at the accredited laboratory of
ALS Santiago are considered appropriate for
the style of mineralisation. The technique is
considered to be partial.
• No geophysical methods are being reported
here.
• Standards and blanks are submitted
periodically with the rock chip samples.
Duplicates and external laboratory checks
are not considered necessary at this stage of
the exploration process.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
• No intersections are being reported here.
• Drill results are not being reported here.
• Sampling data is manually recorded in the
field then entered into the Company
database. The Company has documented
procedures for the handling and
administration of all data. All data collected
is verified by the Geologist responsible
before entering the database.
• No adjustments are made to the assay data.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Location of
data points
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
• No drill holes are reported here.
• Sample locations and elevations were
recorded using a handheld GPS.
• The grid system used is PSAD56 19S.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results. • Sampling sites are at irregular distances and
cannot be used for Mineral Resource
estimates.
• No sample compositing was applied.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied
Whether sample compositing has been applied.
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
• Some rock chip samples were taken across
strike of the mineralisation and some were
taken along mineralised structures.
Sometimes it was not possible to determine
the direction of the mineralisation when
isolated small outcrops were sampled.
• No drilling is being reported here.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
Sample security The measures taken to ensure sample security. • Rock chip samples were stored on site and,
when necessary, delivered to the assay
laboratory by a transport company.
Thereafter laboratory samples were
controlled by the nominated laboratory
which is ALS Santiago. All sample data
collected was controlled at all times by
Company personnel.
Audits or
reviews
The results of any audits or reviews of sampling techniques
and data.
• No audits have been undertaken.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 18 AUGUST 2026
PAGE |12
SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location and ownership
including agreements or material issues with third parties such
as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate
in the area.
• The Fortuna Project area comprises
two groups of concessions. Culpeo
Minerals has agreements in place to
earn up to 80% of 21 exploitation
concessions, which cover a total
area of approximately 1,775
hectares. Culpeo also has 100%
ownership of 31 exploration
concessions covering a total area of
5516 hectares.
Exploration done by
other parties
Acknowledgment and appraisal of exploration by other parties. • Historic exploration was undertaken
by Inversiones Em Dos Limitada
from 2007 to the present.
• Alara Resources undertook a 17
hole drilling program at El Quillay
from 2011 to 2012 and also
undertook an IP geophysical survey.
Culpeo does not have a validated
dataset that can be reported from
this drilling programme.
Geology Deposit type, geological setting, and style of mineralisation. • The Fortuna Project is associated
with a structural belt orientated in a
NS / NW direction, about 6km long
and 500m wide. Mineralisation is
predominantly copper with
accessory gold, silver, and
molybdenum. Mineralisation is
structurally controlled and
associated with breccias and
intrusive units.
Drillhole
Information
A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all material drillholes:
• easting and northing of the drillhole collar
• elevation or RL (elevation above sea level in metres) of the
drillhole collar
• dip and azimuth of the hole
• down hole length and interception depth hole length
• No drilling results are being
reported here.
Data aggregation
methods
In reporting exploration results, weighting averaging
techniques, maximum and/or minimum grade truncations (e.g.
cutting of high grades) and cut-off grades are usually material
and should be stated.
• Data aggregation is not required for
the reporting of rock chip assay
results.
Relationship
between
mineralisation
widths and intercept
lengths
If the geometry of the mineralisation with respect to the
drillhole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (e.g. ‘down hole
length, true width not known’).
• True width of mineralisation is
unknown.
Diagrams Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery
being reported. These should include, but not be limited to, a
plan view of drillhole collar locations and appropriate sectional
views.
• Diagrams are included in the main
body of the report.
Balanced reporting Where comprehensive reporting of all exploration results is not
practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of exploration results.
• Results have been reported in the
body of this report for the main
elements targeted (Cu, Ag, Au, and
Mo) and full assay results are
included in Appendix A.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 18 AUGUST 2026
PAGE |13
Criteria JORC Code explanation Commentary
Other substantive
exploration data
Other exploration data, if meaningful and material, should be
reported including, but not limited to, geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
• IP survey results reported here
Further work The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
• Surface mapping and sampling
programs are ongoing within the
project areas with the objective of
delineating drill targets in the
future.