Investor Presentation
Released
Released
Announcement PDF
LANA CORINA
VISTA MONTANA
BREAK THROUGH
DISCOVERY
IN THE L AND OF THE
COPPER GIANTS
ASX:CPO | OTCQB:CPORF
May 2025
Disclaimer
This Presentation and any accompanying verbal Presentation (together the Presentation) has been prepared by Culpeo Minerals Limited (Culpeo or the Company) and approved
by the Executive Chairman of the Company. The information contained in the Presentation (Information) is a summary only and should be read in conjunction with any oral briefing
and all other documents provided to you by the Company. The Information is current as of the date of this release and the Company does not undertake to provide any additional
or updated information, whether as a result of new information, future events or results or otherwise. By receiving the Presentation, you acknowledge and represent to the
Company that you have read, understood and accepted the terms of this disclaimer.
The Company has prepared the Presentation based on information available as of this release. No representation or warranty, express or implied, is made as to the currency,
accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Neither Culpeo, its related bodies corporate, shareholders
or affiliates, nor any of their respective officers, directors, employees, affiliates, agents or advisers (Agents) guarantee or make any representations or warranties, express or implied,
as to or take responsibility for, the currency, accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Culpeo does
not represent or warrant that this Presentation is complete or that it contains all material information about Culpeo or which a prospective investor or purchaser may require in
evaluating a possible investment in Culpeo or acquisition of shares. To the maximum extent permitted by law, Culpeo and its Agents expressly disclaim any and all liability,
including, without limitation, any liability arising out of fault or negligence, for any loss arising from the use of information contained in this Presentation, or otherwise arising in
connection with it.
Any forward-looking statements in this Presentation, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an
indication or guarantee of future performance and involve known and unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which are
outside the control of Culpeo and which are subject to change without notice and could cause the actual results, performance or achievements of Culpeo to be materially different
from the future results, performance or achievements expressed or implied by such statements. Past performance is not necessarily a guide to future performance and recipients of
this Presentation are cautioned not to place undue reliance on such forward-looking statements.
The information contained in this Presentation is for information purposes only, does not constitute investment or financial product advice (nor taxation, accounting or legal advice)
and is not intended to be used as the basis for making an investment decision. In providing this Presentation, Culpeo has not considered the objectives, financial position or needs
of any particular recipients. Before making an investment decision prospective investors should consider the appropriateness of the information in this Presentation having regard
to their own objectives, financial situation and needs, and seek legal, taxation and financial advice appropriate to their jurisdiction and circumstances.
This Presentation is not a prospectus, product disclosure statement or other offering document under Australian law or any other law (and will not be lodged with the Australian
Securities and Investments Commission, or any other foreign regulator) and is not, and does not constitute, an invitation or offer of securities for subscription, purchase or sale in
any jurisdiction. In particular, this Presentation does not constitute an invitation or offer of securities for subscription, purchase or sale in the United States or any other jurisdiction
in which such an offer would be illegal. The securities referred to in this Presentation have not been, and will not be, registered under the U.S. Securities Act of 1933 as amended or
the securities laws of any state or other jurisdiction of the United States and may not be offered or sold, directly or indirectly in the United States.
The information in this Presentation is strictly confidential. It may not be disclosed, reproduced, disseminated, quoted or referred to in whole or in part, without the express consent
of Culpeo.
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
INVESTOR PRESENTATION
2
PERU
BOLIVIA
CHILE
Antofagasta
3. Jupiter
THREE QUALIT Y
PROJECTS
ON THE
INFRASTRUCTURE
L ADEN CHILEAN
COASTAL BELT
Copiapo
CHILEAN COPPER
DEVELOPMENT
La Serena
1. Lana Corina Project
2. Fortuna
1. Lana Corina
Santiago
ESSENTIAL
FOR THE
TECHNOLOGY AND
ELECTRIFICATION
REVOLUTION
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
A new high-grade outcropping
discovery:
454m @ 0.93% CuEq1
Cu Mo
2. Fortuna Project
ARGENTINA
Nine key outcropping copper
targets, providing high discovery
potential
Cu
Au
Cu
Au
3. Jupiter Project
1. Refer Appendix 1 for additional details including CuEq calculation methodology.
2. Refer to ASX announcement dated 14 April 2025.
Culpeo confirms that it is not aware of any new information or data that materially affects the
information included in those releases. All material assumptions and technical parameters underpinning
those releases continues to apply and has not materially changed.
Two distinct zones of
mineralisation with copper
grades of up to 3.07%2
INVESTOR PRESENTATION
CHILEAN COPPER
DEVELOPMENT
THERE IS NO
QUESTION
THE WORLD NEEDS
MORE COPPER
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
INVESTOR PRESENTATION
4
CORPORATE OVERVIEW
HIGH-QUALIT Y PORTFOLIO OF
ASSETS IN THE PREMIER
COPPER PRODUCING REGION
FEATURING THE NEWLY DISCOVERED HIGH-GRADE
LANA CORINA COPPER MOLYBDENUM PROJECT
100% CHILEAN ASSET FOCUS IN THE LAND OF THE
COPPER GIANTS
DYNAMIC AND SYSTEMATIC EXPLORATION TO
UNLOCK FULL ASSET POTENTIAL
PROVEN TEAM TO DELIVER RAPID ASSET
DEVELOPMENT
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
INVESTOR PRESENTATION
5
1. Lana Corina Project
Game Changing Outcropping Copper Discovery
HIGH-GRADE COPPER
PLAN VIEW OF THE LANA CORINA PROJECT
• 454m at 0.93% CuEq from 90m (CMLCD014) 4 including;
• 78m at 1.24% CuEq from 200m.
• 257m at 1.10% CuEq from 170m (CMLCD002)1;
• 173m at 1.09% CuEq from 313m (CMLCD003)2; and
• 169m at 1.21% CuEq from 239m (CMLCD010)3.
• Large open mineralised system;
• Multiple look alike targets along strike; and
• Significant expansion potential with further drilling.
HIGH-GRADE MOLYBDENUM
• 85m @ 1,367 ppm Mo (0.58% CuEq) from 486m2;
• 35m @ 1,704 ppm Mo (0.84% CuEq) from 570m3, including;
•
4m @ 8,845 ppm Mo (3.48% CuEq); and
•
1m @ 15,000 ppm Mo (6.09% CuEq).
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
INVESTOR PRESENTATION
6
1. Lana Corina Project
Regional Potential with Outcropping Copper Targets over 3km of Strike
Plan view showing Lana Corina detailed surface
geology map and the high priority targets 1.
Plan view of high-resolution ground magnetic data
(high-pass filtered TMIRTP) 2,3.
Interpreted
intrusive centre
3km mineralised
corridor linking Lana
Corina to Vista
Montana
Interpreted
intrusive centre
Mineralised sheeted
veins 400m x 300m
VISTA
MONTANA
NEW
IMAGE
HERE
Extensive
mineralised
breccias
mapped
Extensive
mineralised
breccias
mapped
NEW
IMAGE
HERE
Mineralised sheeted
veins 400m x 300m
VISTA
MONTANA
3km mineralised
corridor linking Lana
Corina to Vista
Montana
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
INVESTOR PRESENTATION
7
1. Lana Corina Project
Is the Initial Discovery Just the First in a Multi-Deposit System?
NEW HIGH-PRIORITY PORPHYRY TARGET
• Mapping, rock chip, channel sampling and
geophysics confirmed a well-defined 250m
by 250m copper porphyry target.
• Interpreted to be a “finger” of a larger buried
intrusive identified by geophysics.
VISTA MONTANA PORPHYRY TARGET
Interpreted intrusive
centre
Extensive
mineralised
breccias
mapped
• Surface sampling returned results of up to
2.62% copper, 2.07g/t gold, 11.2g/t silver,
749ppm antimony and 117.5ppm bismuth.
• Maiden diamond drilling program planned to
test the new target in Q2 CY25.
1. Refer to ASX announcement dated 14 April 2025.
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
INVESTOR PRESENTATION
8
1. Lana Corina Project
PHASE 1 DRILLING
Very large, linked system potential
High-grade Cu zone
Lana Corina
Outcropping breccia
hosted copper and
molybdenum
(CMLCD014)
454m at 0.93% CuEq (90m - 544m)1
High-grade Mo zones
46m at 1,638 ppm Mo (498m – 544m)
30m at 613 ppm Mo (580m – 610m)
38m at 748 ppm Mo (720m – 758m)
Vista Montana
Surface copper anomaly
1,000m x 400m with
grades up to 2.62% Cu2
Lana Corina (LHS) and Vista
Montana (RHS) long section:
Defined targets over greater
than 3km of strike
(VOXI 3D magnetic inversion
model image)3,4
OPEN IN
ALL
DIRECTIONS
Magnetic low
PORPHYRY TARGET
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
PORPHYRY TARGET
3 kilometre strike potential
Near surface breccia drill targets
Zoned porphyry target
INVESTOR PRESENTATION
9
2. Fortuna Project
Outcropping Targets Immediately North of the Lana Corina Discovery
NINE HIGH-PRIORITY OUTCROPPING TARGETS
PLAN VIEW OF THE FORTUNA PROJECT1,2,3,4,5,6,7,8
– Vaca Muerta
– Piedra Dura
– La Florida
– El Quillay North
– El Quillay Central
– El Quillay South
– El Quillay East
– El Quillay West
– Lucero
FORTUNA CONCESSION
AREA COVERS 4,025
HECTARES
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
TOTAL STRIKE OF
HISTORIC MINES
OVER 6KM
INVESTOR PRESENTATION 10
2. Fortuna Project
High Priority El Quillay North Target
Maiden drill hole intersected:
PLAN VIEW OF EL QUILLAY PROSPECT3,4,5,6,7,8,9,10,11.
• 26m at 0.81% CuEq, including 4m @ 1.87% CuEq1.
• Induced polarisation (IP) anomaly identified a 500m x
300m target less than 100m below surface.
Phase 1 trenching program included:
• 46m at 0.90% CuEq;
• 6m at 3.21% CuEq;
• 6m at 1.43% CuEq; and
GRADES UP TO 3.96% Cu AND 2.61G/T Au1.
• 3m at 1.72% CuEq.
Historical sample results included2:
• 3m at 6.92% Cu;
• 15m at 1.50% Cu; and
• 5m at 2.70% Cu.
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
INVESTOR PRESENTATION 11
2. Fortuna Project
El Quillay West IP target
INTERPRETED EL
QUILLAY FAULT ZONE
EL QUILLAY WEST TARGETS
• Multiple targets generated
through remodelled geophysics1.
• Includes a large 500m x 300m
PDIP chargeability anomaly
(right), indicative of copper
sulphide mineralisation.
• Potential for an additional zone
of mineralisation 500m to the
southwest of El Quillay.
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
Legend
El Quillay PDIP chargeability anomaly
areas (green polygons) with priority
ranking shown over a depth slice image
from 100m below ground level. Pink =
higher chargeability and blue = lower
chargeability1
2. Fortuna Project
Porphyry Copper and Gold System at La Florida Prospect – First Drill Targets Defined
MINERALISATION AT LA FLORIDA
Copper sulphide present as chalcopyrite Sample # CPO0008692 3.18% Cu and 2.61g/t Au 1.
COPPER-GOLD
PORPHYRY SYSTEM
PLAN VIEW OF THE LA FLORIDA PROSPECT 1
Copper oxide present as malachite and chrysocolla
Sample #CPO0008688: 3.96% Cu and 1.17g/t Au 1.
LARGE 1.7KM X 0.5KM
FOOTPRINT
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
GRADES UP TO 3.96%
Cu AND 2.61G/T Au1.
INVESTOR PRESENTATION 13
3. Jupiter Project
Exciting New Copper Exposure
GREENFIELD EXPLORATION
ZONE 1
• Acquired April 2025.
• Large, tenement package
approximately 4,000ha.
• Two anomalous zones 5km
long and 3km wide.
• Due diligence sampling
returned surface grades up to
4.33% Cu and 3.24g/t Au1.
• Copper results include
4.33% Cu, 4.14% Cu, 3.93%
Cu; and 3.60 % Cu1.
ZONE 2
Jupiter Project location map showing Culpeo sample locations. Pink denotes
samples >1.50% Cu, mapped alteration zones in orange and mineralised faults in
black. Jupiter project concessions shown by red outline. Datum PSAD56 19S
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
INVESTOR PRESENTATION 14
PROJECT
ACTIVITY
JUPITER
Mapping, geochemistry
and geophysics program
FORTUNA
ACTIVE COPPER
E XPLORATION
STRONG NE WS
FLOW IN 2025
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
LANA
CORINA
Drilling at La Florida and
El Quillay Prospects
Drilling at Vista Montana
and Lana Corina
MAIDEN DRILLING
PROGRAM AT
VISTA MONTANA
Q1-25
Q2-25
■
■
■
■
■
TARGETING
BROAD ZONES OF
OUTCROPPING
HIGH-GRADE
COPPER
Q3-25
Q4-25
■
SET TO DELIVER
LARGE SCALE NEAR
SURFACE
DISCOVERIES
INVESTOR PRESENTATION 15
Corporate Snapshot
Compelling Entry Price with Strong Leverage to Further Exploration Success
CAPITAL STRUCTURE
Share price1
MAJOR SHAREHOLDERS
A$0.011
Shares on issue2
217M
Unlisted options and rights2
26M
Market capitalisation1,2
15%
39%
Top 20
A$2.4M
39%
7%
Cash3
A$0.4M
Debt3
Nil
Enterprise value (undiluted)
A$2M
Board and management
1832 Asset Management L.P.
Other
TIGHT REGISTER WITH SUPPORTIVE
EXPLORATION-FOCUSED SHAREHOLDER BASE
1. As at 5 May 2025.
2. As at 5 May 2025.
3. As at 30 March 2025
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
INVESTOR PRESENTATION 16
Board and Senior Management
Successful Track Record of Discovery, Project Development and Value Creation
Geoff
McNamara
Zeffron
Reeves
Paul
Schmiede
Sergio
Uribe
EXECUTIVE CHAIR
NON-EXECUTIVE DIRECTOR
NON-EXECUTIVE DIRECTOR
CHILEAN COUNTRY MANAGER
• Over 30 years’ of international resource
sector experience.
• Co-founder of Tesoro Gold Ltd which
discovered the El Zorro Gold Project Chile.
• Previously Director of Mining Finance at
Societe General, New York.
• Private Equity Manager for PRCM (FUM
US$800M).
• Previous operational roles include Project
Manager, Senior Mine Geologist and Mine
Geologist for Ivanhoe Mines, Lion Ore
International and WMC.
• Geologist with more than 20 years’ of
resource experience, spanning greenfield
exploration, mineral discovery, definition
and feasibility, construction, production
and closure.
• Managing Director of ASX listed Tesoro
Gold Ltd, a company that has defined the
El Zorro Gold Project in Chile.
• Track record of exploration success
identifying and delineating new gold
districts in Brazil and Chile.
• Mining engineer with over 25 years’
experience in mining, exploration and
corporate development across gold and
base metal commodities within Australia,
Burkina Faso and DRC.
• Currently Vice President Corporate
Development TSS-V listed Sarama
Resources Ltd.
• Previously held senior roles with Moto
Goldmines, Gold Fields and WMC
Resources.
• Member of the Australasian Institute of
Mining and Metallurgy.
• Corporate administrator, manager and
development professional with deep
Chilean experience.
• More than 10 years’ resource sector
experience spanning greenfields
exploration, discovery production, closure,
retreatment and tailings reclamation.
• Country Manager for ASX listed Tesoro
Gold Ltd Chile, and previously General
Manager of Acorn Mining Chile and
Country Manager for Cleveland Mining
Chile.
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
INVESTOR PRESENTATION 17
QUALITY COPPER PORTFOLIO FEATURING THE
NEWLY DISCOVERED HIGH-GRADE LANA
CORINA COPPER MOLYBDENUM PROJECT
100% CHILEAN ASSET FOCUS IN THE LAND
OF THE COPPER GIANTS
CHILEAN COPPER
DEVELOPMENT
FOR A CLEAN
ENERGY FUTURE
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
DYNAMIC AND SYSTEMATIC EXPLORATION
TO UNLOCK FULL ASSET POTENTIAL
PROVEN TEAM TO DELIVER RAPID ASSET
DEVELOPMENT
INVESTOR PRESENTATION 18
APPENDICES
Appendix A
Lana Corina Diamond Drilling Results:
• 454m @ 0.93% CuEq from 90m (CMLCD014) 9 including;
• 78m @ 1.24% CuEq from 200m; and
• 68m @ 1.14% CuEq from 320m; and
• 40m @ 1.20% CuEq from 394m.
• 257m @ 1.10% CuEq from 170m (CMLCD002)2;
• 173m @ 1.09% CuEq from 313m (CMLCD003)3;
• 169m @ 1.21% CuEq from 239m (CMLCD010)7;
• 104m @ 0.81% CuEq from 155m (CMLCD001)1;
• 81m @ 1.16% CuEq from 302m (CMLCD005)4;
• 72m @ 0.91% CuEq from 352m (CMLCD013)8.
• 34.7m @ 0.97% CuEq from 515m (CMLCD007)6; and
• 16.4m @ 1.38% CuEq from 118m (CMLCD005A)5
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
INVESTOR PRESENTATION 20
Appendix B
Additional Information
COPPER EQUIVALENT (CuEq) VALUE CALCULATIONS
COMPETENT PERSONS’ STATEMENTS
•
Assumed commodity prices: Cu US$3.00/lb, Au US$1,700/oz, Mo US$14/lb and
Ag US$20/oz.
•
Recoveries are assumed from similar deposits: Cu = 85%, Au = 65%, Ag = 65%,
Mo = 80%.
•
CuEq (%) calculated using the following formula: {((Cu% x Cu price 1% per tonne
x Cu recovery) + (Au(g/t) x Au price per g/t x Au recovery) + (Mo ppm x Mo price
per g/t x Mo recovery) + Ag ppm x Ag price per g/t x Ag recovery)) / (Cu price 1%
per tonne x Cu recovery)}.
The information in this announcement that relates to the historic Exploration Results and Geophysical Results as listed
in the table below is based on, and fairly represents, information and supporting documentation prepared by the
Competent Person whose name appears in the same row, who is a Director or shareholder of or independent
consultant to the Company and is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM),
Australian Institute of Geoscientists (AIG), Australian Society of Exploration Geophysics (ASEG), or a Recognised
Professional Organisation (RPO). Each person named in the table below has sufficient experience which is relevant to
the style of mineralisation and types of deposits under consideration and to the activity which he has undertaken to
quality as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves.
•
CuEq (%): Cu (%) + (0.54 x Au (g/t)) + (0.00037 x Mo (ppm)) + (0.0063 x Ag (ppm)).
•
It is the Company’s opinion that all elements included in the metal equivalents have
a reasonable potential to be recovered and sold.
REFERENCES
Activity
Competent Person
Membership
Status
Exploration Results
(until 31 Oct 2024)
Mr Maxwell Donald Tuesley
(Shareholder and former Director)
AusIMM
Member
Exploration Results
(after 31 Oct 2024)
Mr Zeffron Reeves
(Director and Shareholder)
AIG
Member
Geophysical Results
Mr Nigel Cantwell
(Consultant)
AIG and ASEG
Member
Slide 3: (1) ASX announcement 10 July 2024; (2) ASX announcement dated 14 April 2025. Slide 6: (1) ASX announcement
11 May 2022. (2) ASX announcement 6 June 2022; (3) ASX announcement 23 November 2022; (4) ASX announcement 10
July 2024. Slide 7: (1) ASX announcement 23 August 2022; (2) ASX announcement 18 May 2022: (3) ASX announcement
27 May 2024. Slide 8: (1) Refer to ASX announcement dated 14 April 2025. Slide 9: (1) ASX announcement 8 March
2023; (2) ASX announcement 10 July 2024; (3) ASX announcement 27 May 2024; (4) ASX announcement 31 August 2022.
Slide 10: (1) ASX announcement 7 August 2023; (2) ASX announcement 11 September 2023; (3) ASX announcement 1
November 2023; (4) ASX announcement 12 December 2023; (5) ASX announcement 21 November 2023; (6) ASX
announcement 4 January 2024; (7) ASX announcement 17 January 2024; (8) ASX announcement 29 February 2024.
Slide 11: (1) ASX announcement 17 January 2024; (2) ASX announcement 11 September 2023; (3) ASX announcement 17
January 2024; (4) ASX announcement 11 September 2023; (5) ASX announcement 1 November 2023; (6) ASX
announcement 12 December 2023; (7) ASX announcement 17 January 2024; (8) ASX announcement 29 February 2024;
(9) ASX announcement 18 March 2024; (10) ASX Announcement 9 April 2024; (11) ASX Announcement 14 May 2024.
Slide 12: (1) ASX announcement 9 April 2024. Slide 13: (1) ASX announcement 4 January 2024. Slide 14 (1) ASX
announcement dated 14 April 2025. Slide 20: (1) ASX announcement 2 May 2022; (2) ASX announcement 11 May 2022.
(3) ASX announcement 6 June 2022; (4) ASX announcement 20 June 2022; (5) ASX announcement 6 September 2022; (6)
ASX announcement 19 July 2022; (7) ASX announcement 23 November 2022; (8) ASX announcement 16 January 2023;
(9) ASX announcement 10 July 2024.
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
INVESTOR PRESENTATION 21
Appendix C
Earn-In Schedules
Period from
original signing
Cash
Consideration
Work
Commitment
Stage
Interest
Aggregate
Interest
(Months)
(US$)
Description
(%)
(%)
1
12
120,000
N/A
80
80
20
2
24
120,000
N/A
0
80
30
50
3
36
120,000
N/A
0
80
N/A
0
50
4
48
120,000
N/A
0
80
750,000
N/A
5
55
5
60
120,000
US$1M expenditure4
0
80
4 September 2026
700,000
N/A
10
65
7
4 September 2027
1,000,000
N/A
5
70
Period from
original signing
Cash
Consideration
Work
Commitment
Stage
Interest
Aggregate
Interest
8
4 September 2027
1,650,000
N/A
10
80
(Months)
(US$)
Description
(%)
(%)
1
Signing
40,000
N/A
0
0
2
12
80,000
N/A
0
0
3
24
200,000
2,000m of drilling
51
51
4
36
300,000
2,000m of drilling
0
51
5
48
380,000
N/A
0
51
6
60
1,000,000
2,000m of drilling
29
80
Lana
Corina1
Period from
original signing
Consideration2
Work
Commitment
Stage
Interest
Aggregate
Interest
(Months)
(US$)
Description
(%)
(%)
1
Signing
100,000
N/A
0
0
2
12
150,000
US$1M expenditure
20
3
24
250,000
US$1M expenditure
4
3rd May 2025
100,000
5
4th March 2026
6
1. Refer to ASX announcement dated 28 April 2025.
2. Culpeo has the option of cash or share payments in the remaining four stages under the Earn -In schedule.
3. Refer to ASX announcement dated 7 Augst 2023.
4. Expenditure at Lana Corina can be included in required amount for Fortuna.
5. Refer to ASX announcement dated 14 April 2025.
CULPEO MINERALS ASX:CPO | OTCQB:CPORF
Fortuna3
Jupiter5
INVESTOR PRESENTATION 22
C O N TAC T
LEVEL 39, 152-158 ST GEORGES TERRACE
PERTH WA 6000
+61 (8) 6383 7894
info@culpeominerals.com.au
geoff.mcnamara@culpeominerals.com.au
Share your feedback
Discover