Compelling IP Chargeability Target Defined at Fortuna
Released
Released
Announcement PDF
A SX A NNOUNCEMENT
9 APRIL 2024
ASX:CPO OTCQB:CPORF
COMPELLING IP CHARGEABILITY TARGET DEFINED AT
FORTUNA
Culpeo Minerals Limited (Culpeo or the Company) (ASX:CPO, OTCQB:CPORF) is pleased to
announce, that a possible new third zone of copper sulphide mineralisation has been
identified within the El Quillay copper trend at its Fortuna Project in Chile (Figure 1).
Considerable exploration potential exists within the 3km long trend which hosts high-grade
copper mineralisation in a series of parallel structures.
HIGHLIGHTS
• Significant new El Quillay West targets generated through remodelled geophysical
data at the Fortuna Project enhancing recent exploration success.
• New target has potential for additional zone of mineralisation 500m to the
southwest of the already defined El Quillay Fault Zone (see Figure 1).
• An Induced Polarisation (IP) chargeability anomaly, indicative of copper sulphide
mineralisation, has a large footprint of 500m x 300m.
• The new El Quillay West target has had no prior exploration.
• The El Quillay Fault Zone extends for >3km where previous drilling returned an
intersection of 26m @ 0.81% CuEq 1.
• Upcoming drilling to test lateral and depth extensions of mineralisation within multiple
structures proximate to the El Quillay Fault Zone.
•
Culpeo’s exploration program continues with new breccia targets at Lana Corina and
Vista Montana to be drilled in the coming weeks.
Culpeo Minerals’ Managing Director, Max Tuesley, commented:
“The identification of the new El Quillay West target confirms our belief that a much larger mineralised
system exists at El Quillay than previously recognised. Geophysical data remodelling has identified a
large chargeability anomaly suggesting the presence of a third zone of parallel mineralisation to the
south-west of the El Quillay North Prospect. We look forward to drill testing these targets during 2024.”
info@culpeominerals.com.au
CULPEOMINERALS.COM.AU
Level 48, 152-158 St Georges Terrace, Perth WA 6000
+61 (8) 6311 9160
ASX ANNOUNCEMENT 9 APRIL 2024
Figure 1: Plan view of El Quillay copper trend, showing multiple zones of potential parallel mineralisation 1,2,3,4,5.
RESULTS
During January 2024, Resource Potentials Pty Ltd (ResPot) was commissioned to review,
reprocess, model, image and interpret historic Pole-Dipole Induced Polarisiation (PDIP)
survey data. ResPot identified four PDIP chargeability anomaly targets from the raw PDIP
data, which have potential for copper sulphide mineralisation.
The four PDIP chargeability anomalies are located within the north-western part of the PDIP
survey area, including one chargeability anomaly high coincident with known copper
sulphide within the El Quillay North Prospect area (Figure 2). Three of the PDIP target areas
are untested by existing drilling, including a high-priority target with follow-up ground
based exploration planned.
PAGE | 2
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 APRIL 2024
ABOUT THE HISTORIC PDIP SURVEY
During January and February 2012, Zonge Engineering and Geophysics (Chile) (Zonge)
acquired 33.4 line-km of PDIP survey data along 17 PDIP survey lines located within the El
Quillay Prospect area. This survey covered the mineralised El Quillay fault zone with survey
lines oriented NE-SW (055-235) and spaced 200m apart (Figure 2). Time-domain electrical
resistivity and chargeability data were acquired using 200m receiver dipole lengths and
200m station moves to a maximum pseudo-depth of N=6, which provides a theoretical
maximum depth of investigation to ~600m.
Figure 2: El Quillay PDIP chargeability anomaly areas (green polygons) with priority ranking shown over a depth
slice image from 100m below ground level. Pink = higher chargeability and blue = lower chargeability.
PAGE | 3
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 APRIL 2024
ResPot reprocessed the PDIP survey data and filtered out poor quality measurements from
the database prior to further interpretation and modelling. Data gridding and imaging of
apparent resistivity and chargeability N-level data was also completed to assist with anomaly
interpretation and targeting.
ResPot also completed unconstrained 2D conductivity and chargeability inversion modelling
to produce conductivity and chargeability model cross sections assisting interpretation and
targeting of conductivity and chargeability anomalies.
3D block models of conductivity and chargeability were then created by gridding data in 3D
across the 2D inversion model cross sections and then depth slice images below ground
level have been generated to assist interpretation and targeting (example shown in Figure
2).
Culpeo continues to expand its geological, structural and mineralisation knowledge at the
Fortuna Prospect. The Company continues to advance its exploration models, further
enhancing its targeting for the next phase of work.
EXPLORATION PROGRAM FOR 2024 CONTINUES
Exploration programs continue with the following key activities planned:
•
Ground based site reconnaissance of priority areas based on interpreted geophysical
datasets (PDIP, ground magnetics and remote sensing anomalies).
•
Results from laboratory analysis of samples from the litho-geochemical survey
undertaken at the La Florida target expected to be returned within the coming weeks.
•
Drilling of new breccia targets at Lana Corina and Vista Montana expected to
commence shortly.
• Additional rock chip samples from Vista Montana are currently being analysed at the
laboratory.
This announcement has been authorised by the Board of Directors of Culpeo Minerals
Limited.
COMPANY
Max Tuesley
Managing Director
E:max.tuesley@culpeominerals.com.au
P: +61 (08) 6311 9160
PAGE | 4
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 APRIL 2024
ABOUT CULPEO MINERALS LIMITED
Culpeo Minerals is a copper exploration and development company with assets in Chile, the world’s
number one copper producer. The Company is exploring and developing high-grade copper systems
in the coastal Cordillera region of Chile.
The Company has made a new discovery at Lana Corina and has recently acquired the Fortuna
Project, which hosts a suite of promising exploration targets. Both projects are situated in the
Coquimbo region of Chile and contain significant outcropping high-grade copper mineralisation
which offers multiple walk-up drill targets.
Culpeo Minerals has a strong board and management team with significant Chilean country expertise
and has an excellent in-country network. All of these elements enable the Company to gain access
to quality assets in a non-competitive environment. We leverage the experience and relationships
developed over 10 years in-country to deliver low cost and effective discovery and resource growth.
We aim to create value for our shareholders through exposure to the acquisition, discovery and
development of mineral properties which feature high-grade, near surface copper mineralisation.
PAGE | 5
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 APRIL 2024
COMPETENT PERSONS’ STATEMENTS
The information in this announcement that relates to Exploration Results is based on information
compiled by Mr Maxwell Donald Tuesley, BSc (Hons) Economic Geology, MAusIMM (No 111470). Mr
Tuesley is a member of the Australian Institute of Mining and Metallurgy and is a shareholder and
Director of the Company. Mr Tuesley has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Tuesley consents to the
inclusion in this report of the matters based on this information in the form and context in which it
appears.
The information in this announcement that relates to Geophysical Results is based on information
compiled by Nigel Cantwell. Mr Cantwell is a Member of the Australian Institute of Geoscientists
(AIG). Mr Cantwell is a consultant to Culpeo Minerals Limited and he has sufficient experience which
is relevant to the style of mineralisation and type of deposit under consideration and to the activity
which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources & Ore Reserves. Mr
Cantwell consents to the inclusion in this report of the matters based on this information in the form
and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the
historical geophysical results included in the original report.
PAGE | 6
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 APRIL 2024
APPENDIX A: JORC CODE TABLE 1 – FORTUNA PROJECT
SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under
investigation, such as down-hole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
El Quillay
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (e.g. ‘reverse
circulation’ drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases, more explanation may be required,
such as where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.
• 17 holes for a total of 4,683.33
meters, were completed historically.
• Sampling and analysis were
undertaken for 570 samples, 570
analyses for copper; 480 analyses
for gold and 26 analyses for silver.
• In November 2023, 5 stockpile
samples were taken. The samples
were delivered to ALS laboratories
in Chile where the following
analytical techniques were
undertaken Au-AA24, Au-GRA22,
Cu-AA62, Mo-AA62 and Ag-AA62.
• Two diamond drill holes were
completed in December 2023, the
core was cut and sent to ALS
laboratories in Chile where the
following analytical techniques were
undertaken: Au-AA24, Au-GRA22,
Cu-AA62, Mo-AA62 and Ag-AA62.
• 18 surface rock chip samples were
taken at El Quillay South in February
2024. The samples were delivered
to ALS laboratories in Chile where
the following analytical techniques
were undertaken Au-AA24, AuGRA22, Cu-AA62, Mo-AA62 and
Ag-AA62.
• 4 surface rock chip samples were
taken at El Quillay Central in
February 2024. The samples were
delivered to ALS laboratories in
Chile where the following analytical
techniques were undertaken AuAA24, Au-GRA22, Cu-AA62, MoAA62 and Ag-AA62.
• 8 surface rock chip samples were
taken at El Quillay East in February
2024. The samples were delivered
to ALS laboratories in Chile where
the following analytical techniques
were undertaken Au-AA24, AuGRA22, Cu-AA62, Mo-AA62 and
Ag-AA62.
PAGE | 7
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 APRIL 2024
Criteria
JORC Code explanation
Commentary
Vaca Muerta
Sampling and Chemical Analysis
was undertaken for 260 samples,
260 analyses for copper and 105
analyses for silver.
• No known historic drilling was
undertaken.
• A two-hole drilling program was
initiated in December 2023 and was
completed during January 2024.
• Core samples were cut and sent to
ALS laboratories in Chile where the
following analytical techniques were
undertaken: Au-AA24, Au-GRA22,
Cu-AA62, Mo-AA62 and Ag-AA62.
La Florida
• Sampling and Chemical Analysis
was undertaken for 110 samples,
110 analyses for copper, 10
analyses for gold and 10 analyses
for silver.
• No known drilling undertaken.
• During November 2023, 14 samples
were taken from old workings,
outcrop and subcrop locations
where bedrock/fresh rock was
visible.
• The samples were delivered to ALS
laboratories in Chile where the
following analytical techniques were
undertaken: Au-AA24, Au-GRA22,
Cu-AA62, Mo-AA62 and Ag-AA62.
• An extensive lith-geochemical
survey is currently underway at La
Florida.
Piedra Dura
• During October 2023, 47 samples
were taken from old workings,
outcrop and subcrop locations
where bedrock/fresh rock was
visible.
• In November 2023, an additional 27
samples were taken from within the
main Piedra Dura structure and also
a parallel structure to the northeast.
• The samples were delivered to ALS
laboratories in Chile where the
following analytical techniques were
•
PAGE | 8
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 APRIL 2024
Criteria
Drilling
techniques
Drill sample
recovery
JORC Code explanation
Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond
tails, face-sampling bit, or other type, whether
core is oriented and if so, by what method,
etc.).
Method of recording and assessing core and
chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc.)
photography.
Commentary
undertaken: Au-AA24, Au-GRA22,
Cu-AA62, Mo-AA62 and Ag-AA62.
Lucero
• During November 2023, 36 samples
were taken from outcrop and
subcrop locations where
bedrock/fresh rock was visible.
• The samples were delivered to ALS
laboratories in Chile where the
following analytical techniques were
undertaken: Au-AA24, Au-GRA22,
Cu-AA62, Mo-AA62 and Ag-AA62.
• Historic Drilling has only been
undertaken at El Quillay (North,
Central and South) and this was prior
to Culpeo’s involvement.
• 17 holes for a total of 4,683.33
meters, were completed 10 were of
the DD type, with 2,699.33 meters,
and 7 corresponded to RC, with
1,984 meters. 14 holes were drilled at
El Quillay North, 2 at El Quillay
Central and 1 at El Quillay South.
• A 4-hole diamond drilling program
has recently been completed at El
Quillay and Vaca Muerta, with
drilling undertaken using HQ3 and
NQ3 techniques.
• The historic drill samples were taken
before Culpeo’s involvement, and no
records are available detailing drill
core recovery.
• For the 2023/2024 drilling program,
core recoveries have been >95%.
• Partial records exist for the historic
drill core logs.
• For the 2023/2024 drilling program,
all core is logged for lithology,
mineralisation style, structure, and
alteration.
The total length and percentage of the
relevant intersections logged.
PAGE | 9
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 APRIL 2024
Criteria
JORC Code explanation
Commentary
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
• No records available for the historic
drilling.
If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet or
dry.
For all sample types, the nature, quality, and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling is
representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
Quality of
assay data and
laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied and
their derivation, etc.
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Location of
data points
Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
• The sample preparation techniques
for historical drilling are unknown.
• Historical analysis has focussed on
Cu, but some of the samples were
also analysed for Mo, Ag and Au.
• For the 2023/2024 program
standards and blanks were regularly
inserted in sample batches and
monitored as part of the company’s
QAQC procedure.
• No twin holes have been completed
due to the early stage of the project.
• Company geologists have verified
the visible copper mineralisation
present in outcrop and in stockpiles
at the project site.
• All logging and sampling are
undertaken using the company’s
procedure manual and chain of
custody protocols.
• Historic Location of drillhole collars
and surface samples were recorded
by handheld GPS. Accuracy is not
known but is considered reasonable
for early-stage exploration.
PAGE | 10
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 APRIL 2024
Criteria
Data spacing
and
distribution
JORC Code explanation
Commentary
Quality and adequacy of topographic control.
• The 2023/2024 sample locations
were picked up using a hand-held
GPS unit.
Data spacing for reporting of Exploration
Results.
Whether the data spacing, and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied
Whether sample compositing has been
applied.
Orientation of
data in
relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
Sample
security
The measures taken to ensure sample
security.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• The historical drilling and surface
sampling are widely spaced, and no
systematic sampling/drilling grid has
been implemented. In general, the
mineralisation strikes in a northsouth / north-west direction and
historic drilling has been undertaken
perpendicular to that.
• Time-domain resistivity and
chargeability data were acquired
using PDIP survey configuration with
Cu-CuSO4 porous pot electrodes
connected to a Zonge GDP-32
receiver and an Iris Instruments VIP5000 5kW transmitter.
• Survey data were acquired along
PDIP receiver lines using 200 meter
receiver dipole lengths and 200
meter station moves, to a maximum
pseudo-depth of N=6.
• Historic drilling and channel
sampling orientations are not
considered to be biased with several
drilling orientations used.
• For the 2023/2024 drilling program,
holes have been aligned
perpendicular to the strike of the
mapped surface mineralisation.
• No records available for the historic
samples.
• For the 2023 program, samples are
delivered to the laboratory using the
company’s chain of custody
procedure.
• No records are available for the
historic sampling, but it is assumed
no audits have been completed.
SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
• The Fortuna project area
comprises twenty-one
exploitation concessions, which
cover a total area of
PAGE | 11
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 APRIL 2024
Criteria
JORC Code explanation
interests, historical sites, wilderness or national
park and environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Exploration done
by other parties
Acknowledgment and appraisal of exploration
by other parties.
Geology
Deposit type, geological setting, and style of
mineralisation.
Drillhole
Information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drillholes:
• easting and northing of the drillhole collar
• elevation or RL (elevation above sea level in
metres) of the drillhole collar
Commentary
approximately 1,775 Hectares.
Culpeo Minerals has
agreements in place to earn up
to 80%.
• Historic exploration was
undertaken by Inversiones Em
Dos Limitada from 2007 to the
present.
• Alara Resources undertook a
17-hole drilling program at El
Quillay from 2011 to 2012 and
also undertook an IP
geophysical survey.
• The Fortuna project is
associated with a structural belt
orientated in a NS / NW
direction, about 6km long and
500m wide. Mineralisation is
predominantly copper with
accessory gold, silver, and
molybdenum. Mineralisation is
structurally controlled and
associated with breccias and
intrusive units
• A summary of the historic
drillholes is provided in
Appendix B.
• For the 2023 program the
drillhole locations are provided
in Appendix C.
• dip and azimuth of the hole
• down hole length and interception depth
hole length
Data aggregation
methods
Relationship
between
mineralisation
widths and
intercept lengths
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
If the geometry of the mineralisation with
respect to the drillhole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length,
true width not known’).
• Only raw assay results have
been reported.
• Only down hole lengths have
been reported with respect to
drilling intercepts, true width of
mineralisation is unknown.
PAGE | 12
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 APRIL 2024
Criteria
JORC Code explanation
Commentary
Diagrams
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported These
should include, but not be limited to a plan view
of drill hole collar locations and appropriate
sectional views.
• Diagrams are included in the
main body of the report.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Results have been reported for
the main elements targeted
(Cu, Ag, Au, and Mo). All
historic drillhole locations are
reported for context.
Other substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
•
Further work
The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
An IP Geophysical Survey: IP
was completed at El Quillay
over an area of 3,500 x 2,100
m, which included the sectors
of El Quillay North, Quillay
Central and Quillay South.
• Resource Potentials Pty Ltd
have completed a review of
the historic geophysical data
and results from this study are
reported in this release.
• Surface mapping and sampling
programs are ongoing over the
advanced targets identified.
• Two diamond drill holes have
recently been completed at the
El Quillay North Prospect and
Two diamond drillholes
completed at the Vaca Muerta
prospect.
PAGE | 13
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 APRIL 2024
Appendix B
Details of Historic Drilling – Fortuna Project
Hole ID
Easting
Northing
RL
Dip
Azimuth
Depth
Q D D- 01
Q D D- 02
Q D D- 03
Q D D- 04
Q R C -5A
29 72 5 0.5
29 71 7 2.9
29 70 5 9.9
29 71 2 3.0
29 70 9 4.8
65 71 2 01.4
65 71 2 54.4
65 71 1 70.3
65 71 1 15.0
65 71 2 42.9
766.9
769.2
757.9
768.0
757.5
-55
-55
-50
-55
-55
56
52
52
56
56
190
344
311
391
391
Q D D- 12
Q R C -13
Q R C -14
Q R C -15
Q D D- 16
Q D D- 17
29 70 3 6.6
29 68 0 1.4
29 67 5 7.0
29 76 5 5.0
29 77 1 0.0
29 82 8 4.0
65 71 0 01.5
65 71 3 04.3
65 70 8 64.0
65 70 5 93.0
65 70 4 56.0
65 69 5 50.0
779.0
768.7
783.0
766.0
779.0
831.0
-50
-58
-90
-60
-55
-5
56
55
0
70
70
90
371
300
172
170
200
161
Q D D- 06
Q D D- 07
Q D D- 08
Q R C -09
Q R C -10
Q D D- 11
Appendix C
29 70 7 2.0
29 69 7 3.0
29 69 1 9.2
29 72 3 5.0
29 70 5 0.0
29 69 0 0.0
65 71 2 85.0
65 71 1 98.0
65 72 2 84.5
65 72 0 14.0
65 71 0 61.0
65 71 1 34.0
753.0
753.0
761.0
770.0
760.0
753.0
-50
-50
-58
-58
-58
-90
50
50
50
50
56
0
240
319
272
331
296
251
2023/24 Drilling Program – Fortuna Project
Hole ID
Easting
Northing
RL
Dip
Azimuth
Depth
CM EQ D001
CM EQ D002
CM V M D0 01
29 73 3 8
29 73 0 0
29 95 4 3
65712 80
65712 89
65687 01
774
784
767
-60
-60
-60
45
30
40
52.3
86.3
149.2
CM V M D0 02
Appendix D
29 99 4 1
65686 77
677
-50
170
185.9
Technical Details
Copper Equivalent (Cu Eq) values: Assumed commodity prices for the calculation of Copper
Equivalent (Cu Eq) is Cu US$3.00/lb, Au US$1,700/oz, Mo US$14/lb and Ag US$20/oz. Recoveries are
assumed from similar deposits: Cu = 85%, Au = 65%, Ag = 65%, Mo = 80%, Cu Eq (%) was calculated
using the following formula: ((Cu% x Cu price 1% per tonne x Cu recovery) + (Au(g/t) x Au price per
g/t x Au recovery) + (Mo ppm x Mo price per g/t x Mo recovery) + Ag ppm x Ag price per g/t x Ag
recovery)) / (Cu price 1% per tonne x Cu recovery). Cu Eq (%) = Cu (%) + (0.54 x Au (g/t)) + (0.00037
x Mo (ppm)) + (0.0063 x Ag (ppm)). It is the Company’s opinion that all elements included in the
metal equivalents have a reasonable potential to be recovered and sold.
Appendix E
References
El Quillay South, Central and North Results refer - Culpeo Minerals ASX Announcement 17 January 2024: “Drilling Returns
Wide Copper Intersections (Replacement)”
2
El Quillay East results refer - Culpeo Minerals ASX Announcement 18 March 2024: “Culpeo Minerals Identifies New Target
at Fortuna Project”
3
El Quillay North Historical Channel Sampling Highlights refer - Culpeo Minerals ASX Announcement 11 September 2023:
“High Priority El Quillay North Target Defined at Fortuna with Historical Grades of up to 6.92% Cu”
1
PAGE | 14
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 9 APRIL 2024
Piedra Dura Recent Surface Sampling Highlights refer - Culpeo Minerals ASX Announcement 1 November 2023: “New HighGrade Copper and Gold Trend at Fortuna Project with up to 4.16% Cu and 48.3g/T Au”; Culpeo Minerals ASX Announcement
12 December 2023: “Culpeo Extends Piedra Dura Mineralisation 400m North with Grades up to 9.78% Cu and 13.4g/T Au
Returned”
5
El Quillay South Recent Surface Sampling Highlights refer - Culpeo Minerals ASX Announcement 29 February 2024: “HighGrade Surface Copper and Gold Mineralisation Confirmed at El Quillay South Prospect”
4
PAGE | 15
CULPEOMINERALS.COM.AU
Share your feedback
Discover