Quarterly Activities Report
Released
Released
Announcement PDF
ASX ANNOUNCEM ENT
V
31 JANUARY 2025
ASX:CPO OTCQB:CPORF
QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDED 31 DECEMBER 2024
Culpeo Minerals Limited (Culpeo or the Company) (ASX:CPO, OTCQB:CPORF) is pleased to report on its
activities for the quarter ended 31 December 2024 (the Quarter).
HIGHLIGHTS
FORTUNA PROJECT
•
•
Positive results were returned from first pass trenching at El Quillay South Prospect1:
•
Results from a systematic trenching program have returned copper mineralisation with
widths of up to 46m @ 0.90% Cu;
•
Including high-grade results of up to 6m @ 3.21% Cu; and
•
The El Quillay South structure has now been mapped over a strike length of 2km2.
Trenching at El Quillay South defined new targets and extending the area of known mineralisation:
Notable results from the Phase 1 Trenching Program at El Quillay South include1:
•
•
46m at 0.90% CuEq in trench EQS002 (hangingwall);
•
6m at 3.21% CuEq in trench EQS002 (footwall);
•
20m at 0.51% CuEq in trench EQS001 (hangingwall);
•
6m at 1.43% CuEq in trench EQS003 (footwall); and
•
3m at 1.72% CuEq in trench EQS004 (footwall).
Mineralisation remains open to the south.
•
LANA CORINA AND VISTA MONTANA PROJECTS
• Further detailed mapping, sampling and trenching was undertaken at Lana Corina and Vista
Montana, identifying additional targets and refining existing targets for drilling during Q1
2025.
• Results from these field programs are expected in Q1 2025.
2025 EXPLORATION PROGRAMS
Advancement of exploration activities continue across key project areas, including:
•
Site clearance underway for drilling at the Vista Montana Prospect;
•
Ongoing trenching at El Quillay South in a Phase 2 program;
PAGE |1
CULPEOMINERALS.COM.AU
info@culpeominerals.com.au
Level 39, 152-158 St Georges Terrace, Perth WA 6000
61 (8) 6383 7894
ASX ANNOUNCEMENT 31JANUARY 2025
•
A litho-geochemistry survey at La Florida Prospect; and
•
Reconnaissance exploration of high-priority areas within the Fortuna Project.
CORPORATE
•
Proceeds totaling A$620k received following completion of Tranche 2 Equity Placement.
•
Appointment of Mr Geoff McNamara as Interim Executive Chairman3.
•
The Company’s financial reporting year end changed from 30 June to 31 December to align with
its Chilean exploration activities and financial budgeting4.
Operating Activities
Figure 1: Plan view of the Fortuna and Lana Corina Project areas.
FORTUNA PROJECT
El Quillay South Prospect
Recent mapping at El Quillay South has extended the known mineralisation by a further 1km expanding
the total strike length to over 2km (refer to Figure 2)2. A systematic trenching program began in August
2024, with a 1,500m trenching program to follow up historic sampling results (refer to Figure 3).
PAGE |2
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31JANUARY 2025
Trenching is currently in progress to identify drill targets and extend the known mineralisation which
remains open to the south. Four trenches have been completed at El Quillay South with results for
166 samples already received.
Mineralisation at El Quillay South is focused on both the footwall and hangingwall of the structure. Results
indicate that wider zones of copper mineralisation is hosted near the hangingwall contact and a highergrade gold zone within the footwall2.
Figure 2: Plan view of the southern Fortuna Project, showing trenches at El Quillay South2,5,6,7,8,9.
PAGE |3
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31JANUARY 2025
Figure 3: Trenching at an andesite outcrop, mineralisation consists of quartz, iron oxides, and copper oxides.
Samples CPO0009117-CPO0009118-CPO0009119 Trench 1 (5.5m at 0.88% CuEq)2.
LANA CORINA AND VISTA MONTANA PROJECTS
Further detailed mapping, sampling and trenching was undertaken at Lana Corina and Vista
Montana, identifying additional targets and refining existing targets for drilling during Q1 2025.
Results from these field programs are expected early in Q1 2025.
SAN SEBASTIAN AND LAS PETACAS PROJECTS
No exploration activities were completed during the Quarter.
2025 EXPLORATION PROGRAMS
Culpeo continues to advance its exploration activities across its key projects, with the following activities
underway:
•
Site clearance underway for drilling at the Vista Montana Prospect;
•
Ongoing trenching at El Quillay South in a Phase 2 program;
•
A litho-geochemistry survey at La Florida; and
•
Reconnaissance exploration of high-priority areas within the Fortuna Project.
PAGE |4
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31JANUARY 2025
Corporate Activities
Appointment of Interim Executive Chairman
On 14 October 2024, Culpeo advised of the appointment of Mr Geoff McNamara as Interim Executive
Chairman of the Company, effective 1 November 2024. Mr McNamara’s appointment followed the
decision of Mr Max Tuesley to step down as Managing Director due to family reasons. Mr McNamara
continues to serve as Interim Executive Chairman until a new Managing Director is appointed.
Mr McNamara, a Co-founder and major Shareholder of Culpeo, has served as Non-Executive Chairman
since the Company’s incorporation and has played a pivotal role in establishing and developing the
business since its ASX listing. With 30 years of international resource sector experience, his career spans
roles as a Geologist, Project Manager and Fund Manager.
Annual General Meeting
The Company held its Annual General Meeting of Shareholders on 16 October 2024, where all resolutions
put to Shareholders were approved10.
Successful Completion of Equity Raise11
The Company completed its equity placement comprising the issue of 53.75 million new fully paid
Ordinary Shares to sophisticated and professional investors at an issue price of $0.04 per share. The
Placement raised approximately $2.15 million (before costs). The Placement consisted of two tranches
comprising:
•
Tranche 1: 38,250,000 Placement Shares which raised approximately $1.53 million and was
completed during the September Quarter; and
•
Tranche 2: 15,500,000 Placement Shares which raised approximately $0.62 million. Tranche 2
included Director participation, was approved by Shareholders at the Annual General Meeting
and completed during the Quarter.
Issue and Expiry of Securities
During the Quarter:
•
a total of 840,000 new fully paid Ordinary Shares were issued for Introduction services provided
during the Placement12;
•
a total of 13,934,102 quoted Options expired13;
•
a total of 2,150,000 Performance Rights lapsed following non-achievement of performance-based
vesting14
•
a total of 1,250,000 Unvested Performance Rights expired upon the resignation of a Director15;
and
•
a total of 285,770 Share Rights were issued16.
PAGE |5
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31JANUARY 2025
Change of Financial Year End
On 29 November 2024, Culpeo announced that its Board of Directors had resolved to change the
Company’s financial year end from 30 June to 31 December. The change was to align the Company’s
financial year with its Chilean exploration activities, financial budgeting, and reporting, including the
timing of year-end financial audit.
The Company implemented this change in accordance with section 323D(2A) of the Corporations Act 2001
(Cth). The Board confirmed that:
•
the Company’s previous financial year ended on 30 June 2024;
•
the Company would have a six-month transitional financial year beginning on 1 July 2024 and
ending on 31 December 2024; and
from 1 January 2025 onwards, the Company would adopt a twelve-month financial year,
•
commencing on 1 January and ending on 31 December.
As a result of this change, the Company is required to, in respect of the six-month transitional financial
year:
•
lodge an annual financial report by 31 March 2025; and
•
hold an Annual General Meeting by 31 May 2025.
The Company will announce the actual date of the Annual General Meeting in due course.
Cash Position at Quarter End
During the Quarter, the Company spent $0.290 million on exploration activities, primarily focused on
assays and sampling programs. At Quarter end, the Company had A$0.996 million in cash and cash
equivalents and zero debt.
The Company received proceeds of A$620k from Tranche 2 of the equity placement completed in the
December Quarter.
Payments to Related Parties
As outlined in the Appendix 5B for the Quarter ending 31 December 2024 (Sections 6.1 and 6.2),
approximately $44k in payments were made to related parties and/or their associates, which comprised
remuneration for the Managing Director, Non-Executive Director fees and Consulting fees.
This announcement has been authorised by the Board of Directors of Culpeo Minerals Limited.
CONTACT
Geoff McNamara
Interim Executive Chairman
E: geoff.mcnamara@culpeominerals.com.au
P: +61 (08) 6383 7894
PAGE |6
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31JANUARY 2025
ABOUT CULPEO MINERALS LIMITED
Culpeo Minerals Limited is committed to copper exploration and development, with strategic investments in
Chile, a leading global copper producer. Focusing on high-grade copper systems in Chile's infrastructure laden
Coastal Cordillera. The Company has recently announced a significant copper and molybdenum discovery at
Lana Corina and acquired the promising Fortuna Project.
Both projects are located in Chile's Coquimbo region, renowned for its numerous world-class copper and gold
mines. These project areas feature significant outcropping high-grade copper deposits, and the region's
infrastructure includes access roads, power lines, water sources, and local settlements, all of which are essential
for, and help facilitate economic mining activities.
The Company is led by a skilled board and management team with extensive Chilean knowledge and a strong
local network. Drawing on over two decades of experience and established relationships within Chile, the
Company actively seeks cost-efficient discoveries and acquisitions. Culpeo’s main objective is to increase
shareholder value through the exploration, acquisition, and development high-grade, near surface copper
systems.
PAGE |7
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31JANUARY 2025
COMPETENT PERSONS’ STATEMENTS
The information in this announcement that relates to Exploration Results is based on information compiled by
former Managing Director Mr Maxwell Donald Tuesley, BSc (Hons) Economic Geology, MAusIMM (No 111470).
Mr Tuesley is a member of the Australian Institute of Mining and Metallurgy and was a shareholder and Director
of the Company. Mr Tuesley has sufficient experience that is relevant to the style of mineralisation and type of
deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. The Company confirms that it is not aware of any new information or data that materially
affects the exploration results included in the relevant market announcements.
FORWARD -LOOKING STATEMENTS
The information contained in this release is not investment or financial product advice and is not intended to
be used as the basis for making an investment decision. Please note that, in providing this release, the Company
has not considered the objectives, financial position or needs of any particular recipient. The information
contained in this release is not a substitute for detailed investigation or analysis of any particular issue and
does not purport to be all of the information that a person would need to make an assessment of the Company
or its assets. Current and potential investors should seek independent advice before making any investment
decisions in regard to the Company or its activities.
This announcement includes “forward-looking statements” within the meaning of securities laws of applicable
jurisdictions. Forward-looking statements can generally be identified by the use of the words “anticipate”,
“believe”, “expect”, “project”, “forecast”, “estimate”, “likely”, “intend”, “should”, “could”, “may”, “target”, “plan”,
“guidance” and other similar expressions. Indications of, and guidance on, future earning or dividends and
financial position and performance are also forward-looking statements. Such forward-looking statements
involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are
beyond the control of the Company, and which may cause actual results, performance or achievements to
differ materially from those expressed or implied by such statements.
Forward-looking statements are provided as a general guide only, and should not be relied on as an indication
or guarantee of future performance. Given these uncertainties, recipients are cautioned to not place undue
reliance on any forward-looking statement. Subject to any continuing obligations under applicable law the
Company disclaims any obligation or undertaking to disseminate any updates or revisions to any forwardlooking statements in this document to reflect any change in expectations in relation to any forward-looking
statements or any change in events, conditions or circumstances on which any such statement is based.
This announcement is not, and does not constitute, an offer to sell or the solicitation, invitation or
recommendation to purchase any securities and neither this announcement nor anything contained in it forms
the basis of any contract or commitment.
PAGE |8
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31JANUARY 2025
Appendix A: Culpeo Minerals Exploration Concessions at 31 December 2024
Project
Licence
Company
Area (Ha)
Grant
Expiry
Ownership
Lana - Corina
San Agustin
Socavon
Lana Segunda
Corina
Laco 1 al 10
Sara 1 – 20
Patty 2 1 – 75
Patty 3 1 – 260
Patty 4 1 - 111
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
Antofagasta Minerals
SCM Antares
SCM Antares
SCM Antares
1
1
1
1
10
90
75
260
111
1951
1951
1951
1951
2015
2006
2019
2019
2019
None
None
None
None
None
None
None
None
None
50%
50%
50%
50%
50%
50%
50%
50%
50%
Peta 31/55
Peta 91/92
Peta 15/28
La Rosa 27/28
La Rosa 31/46
La Rosa 1/30
Corredor 2, 1/12
Corredor 3, 1/6
Cachorro 1/20
Cachorro 1,1/160
Cachorro 2, 1/95
Cachorro 3, 1/24
Cachorro 4, 1/173
Cachorro 5, 1/87
Almudena 1,1
Amudena 2, 1/3
Almudena 3, 1/2
Almudena 4, 1/7
Almudena 5, 1/6
Almudena 6,1
Almudena 7,1
Almudena 8,1/4
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
11-Nov-89
11-Nov-89
06-Nov-89
26-Dec-89
28-Jun-11
25-Nov-91
18-Feb-15
18-Feb-15
11-Nov-14
28-Jul-15
18-Feb-15
18-Feb-15
18-Feb-15
18-Feb-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
San Sebastian 1/16 (2/16)
San Sebastian 1/16 (1)
Minera Panga SpA
Minera Panga SpA
1998
1998
None
None
100%
100%
LA FLORIDA 1 a 20
LA FLORIDA II 1 al 20
PIEDRA DURA 1 a 20
EL QUILLAY 5A 1 al 17
EL QUILLAY 4A 1 al 25
Bastis 29CB 1 al 16
Bastis 29CB 17 al 20
LOS QUILLAYES 1/4 (3/4)
LA ESPERANZA 1/10
PRETECATEMO 1/20
Antares 1 al 165
MATILDE 2 1 al 50
El Quillay 2 1 al 224
El Quillay 3 1 al 236
El Quillay 4A 1 al 89
El Quillay 4B 1 al 40
El Quillay 5A 1
El Quillay 5C 1 al 98
El Quillay 6 1 al 13
El Quillay 6A 1 al 7
La Escondida 1-14
FLORIDA 1
FLORIDA 10
FLORIDA 11
FLORIDA 12
FLORIDA 2
FLORIDA 3
FLORIDA 4
FLORIDA 5
FLORIDA 6
FLORIDA 7
FLORIDA 8
FLORIDA 9
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SLM La Escondida
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
2007
2010
2006
2011
2011
2011
2011
1984
1960
1953
2011
2011
2011
2011
2011
2011
2011
2011
2011
2011
2005
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
15/03/2026
15/03/2026
15/03/2026
15/03/2026
15/03/2026
21/02/2026
21/02/2026
13/02/2026
13/02/2026
14/02/2026
14/02/2026
20/02/2026
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Total – Lana Corina
Petacas
550 Ha
Total – Las Petacas
San Sebastian
1,406 Ha
Total – San Sebastian
Fortuna
Total – Fortuna
120
10
70
6
80
300
12
6
20
160
95
242
173
87
1
3
2
7
6
1
1
4
45
5
50 Ha
100
100
96
17
25
127
35
10
50
100
165
200
224
236
89
40
1
98
13
7
42
300
300
300
300
300
300
300
300
300
300
300
300
5,375 Ha
PAGE |9
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31JANUARY 2025
Appendix B: Technical Details
Copper Equivalent (CuEq) values: Assumed commodity prices for the calculation of CuEq is Cu
US$3.00/lb, Au US$1,700/oz, Mo US$14/lb and Ag US$20/oz. Recoveries are assumed from similar
deposits: Cu = 85%, Au = 65%, Ag = 65%, Mo = 80%, CuEq (%) was calculated using the following
formula: ((Cu% x Cu price 1% per tonne x Cu recovery) + (Au(g/t) x Au price per g/t x Au recovery) +
(Mo ppm x Mo price per g/t x Mo recovery) + Ag ppm x Ag price per g/t x Ag recovery)) / (Cu price
1% per tonne x Cu recovery). CuEq (%) = Cu (%) + (0.54 x Au (g/t)) + (0.00037 x Mo (ppm)) + (0.0063
x Ag (ppm)). It is the Company’s opinion that all elements included in the metal equivalents have a
reasonable potential to be recovered and sold.
References
1
Refer to ASX announcement dated 2 October 2024 “Thick Surface Mineralisation Returned from Outcropping Copper-Gold System at Fortuna Project, Chile.”.
2
Refer to ASX announcement dated 18 September 2024 “Surface Results up to 1.83% Copper Confirm High-Priority Targets at Fortuna”.
3
Refer to ASX announcement dated 14 October 2024 “Appointment of Interim Executive Chairman”.
4
Refer to ASX announcement dated 29 November 2024 “Change of Financial Year End”.
5
Refer to ASX announcement dated 14 May 2024 “Reconnaissance Drilling Delivers Grades of up to 2.19% CuEq at Fortuna Project”.
6
Refer to ASX announcement dated 17 January 2024 “Drilling Returns Wide Copper Intersections (Replacement)”.
7
Refer to ASX announcement dated 11 September 2023 “High Priority El Quillay North Target Defined”.
8
Refer to ASX announcement dated 1 November 2023 “New High-Grade Cu and Au Trend at Fortuna”.
9
Refer to ASX announcement dated 12 December 2023 “Culpeo extends Piedra Dura Mineralisation”
10
Refer to ASX announcement dated 16 October 2024 “Results of Annual General Meeting”.
11
Refer to ASX announcement dated 2 August 2024 “Culpeo Secures Funding to Advance Copper Exploration at Vista Montana, Lana Corina and Fortuna”.
12
Refer to ASX announcements dated 31 October 2024 and 28 November 2024
13
Refer to ASX announcement dated 31 October 2024 “Expiry of Listed Options”.
14
Refer to ASX announcement dated 18 October 2024
15
Refer to ASX announcement dated 31 October 2024
16
Refer to ASX announcement dated 1 November 2024
PAGE |10
CULPEOMINERALS.COM.AU
Share your feedback
Discover