Maiden Drilling Commences at La Florida Prospect (Updated)
Released
Released
Announcement PDF
A SX A NNOUNCEMENT
7 JULY 2025
ASX:CPO OTCQB:CPORF
UPDATED ANNOUNCEMENT
“MAIDEN DRILLING COMMENCES AT LA FLORIDA COPPER
PROSPECT”
Culpeo Minerals Limited (Culpeo or the Company) (ASX:CPO, OTCQB:CPORF) notes the
announcement released on 7 July 2025 titled ‘Maiden Drilling Commences At La Florida Copper
Prospect’ and provides the following replacement announcement which includes additional
information relating to the technical details in Appendix B and the amendment of the Competent
Persons Statement.
This announcement has been authorised by the Interim Executive Chairman of Culpeo Minerals
Limited.
COMPANY
Geoff McNamara
Interim Executive Chairman
E: geoff.mcnamara@culpeominerals.com.au
P: +61 (08) 6383 7894
CULPEOMINERALS.COM.AU
info@culpeominerals.com.au
Level 39, 152-158 St Georges Terrace, Perth WA 6000
61 (8) 6383 7894
A SX A NNOUNCEMENT
7 JULY 2025
ASX:CPO OTCQB:CPORF
MAIDEN DRILLING COMMENCES AT LA FLORIDA
COPPER PROSPECT
Culpeo Minerals Limited (Culpeo or the Company) (ASX:CPO, OTCQB:CPORF) is pleased to
announce the commencement of drilling at the La Florida copper prospect within its Fortuna Project
in Chile. The 1,400m program is the first drilling to be undertaken on two new copper targets with
large footprints of up to 1,700m x 500m delineated by recent geochemical and trenching activities.
ACTIVITY HIGHLIGHTS
FORTUNA PROJECT
•
Maiden diamond drilling program has commenced at La Florida Prospect (Figure 1, 2 and 3).
•
An initial four-hole program is planned of approximately 1,400 metres testing high priority,
newly defined Copper targets (Figures 2 and 3).
•
Targets exhibit well-defined alteration and geochemical zonation commonly associated with
copper mineralisation (Figures 2 and 3).
•
Previous surface sampling returned results of up to 3.96% copper and 2.61g/t gold.12
•
Assays remain outstanding from trenching program over high priority areas.
•
Drilling program fully funded upon receipt of final committed funds from A$3M equity raise
in May 2025.13
•
The General Meeting held on 3 July 2025 was successfully conducted, with all resolutions duly
passed.14
Culpeo Minerals’ Interim Executive Chairman, Geoff McNamara, commented:
“We are pleased to commence a maiden diamond drilling program at the exciting La Florida Copper
Prospect.
“Our team has identified multiple promising new targets that align with our strategy of discovering
near-surface deposits situated at low altitude and proximity to infrastructure.
“This is an exciting period for the Company as we anticipate assay results from our extensive trenching
program, to be followed by results from this drilling campaign, and then shifting our drilling to the
Vista Montana area, and then finally follow-up drilling at the Lana Corina prospect, where the previous
significant intercepts included 454m at 0.93% CuEq from 90m”.1
CULPEOMINERALS.COM.AU
PAGE |1
CULPEOMINERALS.COM.AU
info@culpeominerals.com.au
Level 39, 152-158 St Georges Terrace, Perth WA 6000
+61 (8) 6383 7894
ASX ANNOUNCEMENT 7 JULY 2025
Figure 1: Location of the La Florida Prospect 1,2,3,4,5,6,7,8,9,10.
FORTUNA PROJECT (80% CULPEO) 1 1
The Fortuna Project, located approximately 10km north of the Company’s Lana Corina Project, hosts
numerous historical small-scale workings that exploited near-surface mineralisation.
The La Florida Prospect has been identified as a high priority drill target and exhibits strong
similarities to the lithologies and alteration styles observed at our Lana Corina discovery, indicating
strong potential to host similar high-grade copper mineralisation.
PAGE | 2
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 7 JULY 2025
Figure 2: Plan illustrating the collar locations of the initial four diamond drill holes at the La Florida Prospect 12.
PAGE | 3
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 7 JULY 2025
Figure 3: Interpreted Geology: Cross-section for drill hole 2025FL02 depicting wide intrusive target zone.
PAGE | 4
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 7 JULY 2025
Figure 4: Drill rig on platform 2025FL02 drilling maiden diamond hole CMLFD001.
Inspection of historical artisanal mining activities in and around the La Florida Prospect has revealed
significant copper mineralisation, notably chrysocolla. Geological interpretations indicate that these
mineralised occurrences are associated with northeast and southwest trending structural features.
PAGE | 5
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 7 JULY 2025
The locations of the proposed diamond drill holes were prioritised based on the presence of quartzclay-sericite alteration, fine-grained sulphide dissemination, and surface expressions of copper
oxides.
This announcement has been authorised by the Board of Directors of Culpeo Minerals Limited.
COMPANY CONTACT
Geoff McNamara
Interim Executive Chairman
E: geoff.mcnamara@culpeominerals.com.au
P: +61 (08) 6368 7894
PAGE | 6
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 7 JULY 2025
ABOUT CULPEO MINERALS LIMITED
Culpeo Minerals Limited is committed to copper exploration, discovery and development, with strategic assets
in Chile, the world’s leading copper-producing nation. The Company is focused on high-grade copper systems
within Chile’s infrastructure-rich Coastal Cordillera.
Culpeo has recently announced a significant copper and molybdenum discovery at the Lana Corina Project and
acquired the highly prospective Fortuna and Jupiter copper-gold projects.
The Lana Corina and Fortuna Projects are located in Chile’s Coquimbo Region, approximately 350km north of
Santiago, in proximity to the world-class Los Pelambres mine. The Jupiter Project is situated in the Antofagasta
Region, renowned for hosting multiple tier-one copper and gold operations, including Escondida, Collahuasi
and El Teniente.
These project areas feature substantial outcropping high-grade copper systems, and importantly, they are
supported by well-established regional infrastructure, including roads, power transmission lines, water sources
and a strong local mining industry - factors critical in enabling cost-effective and efficient development.
The Company is led by a highly experienced board and management team with more than two decades of
operational and exploration experience in Chile. Culpeo’s objective is to deliver Shareholder value through the
exploration, acquisition and development of high-grade, near-surface copper systems.
PAGE | 7
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 7 JULY 2025
COMPETENT PERSONS STATEMENTS
The information in this announcement that relates to the historic Exploration Results as listed in the table below
is based on, and fairly represents, information and supporting documentation prepared by the Competent
Person whose name appears in the same row, who is a Director or shareholder of the Company and is a Member
of the Australasian Institute of Mining and Metallurgy (AusIMM) or Australian Institute of Geoscientists (AIG).
Each person named in the table below has sufficient experience which is relevant to the style of mineralisation
and types of deposits under consideration and to the activity which he has undertaken to quality as a
Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves.
Activity
Competent Person
Membership
Status
Exploration Results (until 31 Oct 2024)
Mr Maxwell Tuesley (Shareholder and former Director)
AusIMM
Member
Exploration Results (after 31 Oct 2024)
Mr Zeffron Reeves (Director and Shareholder)
AIG
Member
The information relating to historic Exploration Results in this announcement or as otherwise noted in this
announcement, is available from the Company’s website at www. culpeominerals.com.au or on the ASX website
www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially
affects the Exploration Results information included in previous announcements. The Company confirms that
the form and context in which the applicable Competent Persons’ findings are presented have not been
materially modified from the previous announcements.
FORWARD-LOOKING STATEMENTS
The information contained in this release is not investment or financial product advice and is not intended to
be used as the basis for making an investment decision. Please note that, in providing this release, the Company
has not considered the objectives, financial position or needs of any particular recipient. The information
contained in this release is not a substitute for detailed investigation or analysis of any particular issue and
does not purport to be all of the information that a person would need to make an assessment of the Company
or its assets. Current and potential investors should seek independent advice before making any investment
decisions in regard to the Company or its activities.
This announcement includes “forward-looking statements” within the meaning of securities laws of applicable
jurisdictions. Forward-looking statements can generally be identified by the use of the words “anticipate”,
“believe”, “expect”, “project”, “forecast”, “estimate”, “likely”, “intend”, “should”, “could”, “may”, “target”, “plan”,
“guidance” and other similar expressions. Indications of, and guidance on, future earning or dividends and
financial position and performance are also forward-looking statements. Such forward-looking statements
involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are
beyond the control of the Company, and which may cause actual results, performance or achievements to
differ materially from those expressed or implied by such statements.
Forward-looking statements are provided as a general guide only, and should not be relied on as an indication
or guarantee of future performance. Given these uncertainties, recipients are cautioned to not place undue
reliance on any forward-looking statement. Subject to any continuing obligations under applicable law the
Company disclaims any obligation or undertaking to disseminate any updates or revisions to any forwardlooking statements in this document to reflect any change in expectations in relation to any forward-looking
statements or any change in events, conditions or circumstances on which any such statement is based.
This announcement is not, and does not constitute, an offer to sell or the solicitation, invitation or
recommendation to purchase any securities and neither this announcement nor anything contained in it forms
the basis of any contract or commitment.
PAGE | 8
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 7 JULY 2025
Appendix A: References
1
Refer to ASX announcement dated 10 July 2024 “Lana Corina Drill Results Extended – 454m @ 0.93% CuEq”.
2
Refer to ASX announcement dated 11 September 2023 “High Priority El Quillay North target defined”.
3
Refer to ASX announcement dated 1 November 2023” High grade Copper and gold trend at Fortuna”.
4
Refer to ASX announcement dated 12 December 2023” Culpeo extends Piedra Dura Mineralisation”.
5
Refer to ASX announcement dated 29 February 2024 “High-Grade Surface Copper and Gold Confirmed at El Quillay South”.
6
Refer to ASX announcement dated 18 March 2024 “Culpeo Minerals Identifies new target at Fortuna”.
7
Refer to ASX announcement dated 14 May 2024 “Reconnaissance Drilling Deliveries Grades up to 2.19% CuEq”.
8
Refer to ASX announcement dated 29 February 2024 “High Grade Surface Copper and Gold Mineralisation Confirmed at El Quillay South”.
9
Refer to ASX announcement dated 11 September 2023 “High Priority El Quillay North Target Defined at Fortuna with Historical Grades up to 6.92% Cu”.
10
Refer to ASX announcement dated 1 November 2023 “New High-Grade Copper and Gold Trend at Fortuna with up to 4.16% Cu and 48.3g/t Au”.
11
Refer to ASX announcement dated 4 October 2023 “Fortuna Copper Project Tenure Expanded by over 125%”.
12
Refer to ASX announcement dated 28 April 2025 “New Priority Porphyry Targets Identified at the Lana Corina and Fortuna Copper Projects”.
13
Refer to ASX announcement dated 9 May 2025 “Culpeo Secures $3M for Drilling High-Grade Copper Zones”.
14
Refer to ASX announcement dated 3 July 2025 “Results of General Meeting”
Appendix B: Technical Details
Copper Equivalent (Cu Eq) values: Assumed commodity prices for the calculation of Copper Equivalent (Cu Eq)
is Cu US$3.00/lb, Au US$1,700/oz, Mo US$14/lb and Ag US$20/oz. Recoveries are assumed from similar
deposits: Cu = 85%, Au = 65%, Ag = 65%, Mo = 80%, Cu Eq (%) was calculated using the following formula:
((Cu% x Cu price 1% per tonne x Cu recovery) + (Au(g/t) x Au price per g/t x Au recovery) + (Mo ppm x Mo
price per g/t x Mo recovery) + Ag ppm x Ag price per g/t x Ag recovery)) / (Cu price 1% per tonne x Cu
recovery). Cu Eq (%) = Cu (%) + (0.54 x Au (g/t)) + (0.00037 x Mo (ppm)) + (0.0063 x Ag (ppm)). It is the
Company’s opinion that all elements included in the metal equivalents have a reasonable potential to be
recovered and sold.
PAGE | 9
CULPEOMINERALS.COM.AU
Share your feedback