Quarterly Activities Report
Released
Released
Announcement PDF
ASX ANNO UNCEMENT
30 JULY 2025
ASX:CPO OTCQB:CPORF
QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDED 30 JUNE 2025
Culpeo Minerals Limited (Culpeo or the Company) (ASX:CPO, OTCQB:CPORF) is pleased to report
on its activities for the quarter ended 30 June 2025 (the Quarter).
ACTIVITY HIGHLIGHTS
LANA CORINA PROJECT
•
A well-defined 250m by 250m copper porphyry target was confirmed at the Vista Montana
Prospect, where surface sampling results returned up to 2.62% copper, 2.07g/t gold, 11.2g/t
silver, 749ppm antimony and 117.5ppm bismuth1.
•
•
A drilling program is scheduled to commence on completion of drilling at the Fortuna Project.
The program has been designed to test the potential to link the Lana Corina and Vista
Montana Prospect areas and confirm a 3km continuous, copper trend15.
FORTUNA PROJECT
•
Multiple new Iron Ore Copper Gold (IOCG) and porphyry-style copper-gold targets have been
identified at the La Florida Prospect, exhibiting well-defined alteration and geochemical
zonation associated with copper mineralisation2.
•
The most recent round of surface sampling has revealed multiple zones of high-grade copper
mineralisation, defining a highly prospective corridor over 1.7km in length and 500m in
width, with assays returning up to 2.70% copper4.
•
Trenching and surface sampling at La Florida to date includes:
• 21.00m @ 1.10% Cu (FLO1);
• 6.00m @ 2.31% Cu (FLO26);
• 10.00m @ 2.70% Cu (FLO67); and
• 30.00m @ 1.00% Cu (FLO70).
•
Diamond drilling at La Florida is underway, with a four-hole (1,400m) program targeting
porphyry-style mineralisation across multiple target zones.
•
Assay results are expected in Q3 20254.
CULPEOMINERALS.COM.AU
info@culpeominerals.com.au
Level 39, 152-158 St Georges Terrace, Perth WA 6000
61 (8) 6383 7894
ASX ANNOUNCEMENT 30 JULY 2025
JUPITER PROJECT
•
An agreement was entered into for the acquisition of up to 100% of the highly prospective
Jupiter Copper Project, covering approximately 4,000ha in the Antofagasta region of Chile
(refer Figure 5).
•
Due diligence surface exploration (Culpeo 2024) identified two large zones of anomalous
copper mineralisation with grab samples returning grades of up to 4.33% copper and
3.24g/t gold.
•
This acquisition represents a strategic addition to Culpeo’s portfolio, further solidifying
its position as a leading copper explorer in Chile’s low-altitude, prolific Coastal Cordillera.
CORPORATE
•
A favourable amendment to the earn-in schedule was secured for the acquisition of the
Lana Corina Project, with Culpeo retaining the option to increase its ownership in Lana
Corina up to 80%.
•
Negotiation for a new long-term access agreement with the local Soruco community to
support drilling activities at Lana Corina commenced.
•
A strongly supported equity placement raised A$3.02 million (before costs) was
completed, with proceeds to be directed towards:
•
Lana Corina Project - up to 4,000m of maiden drilling at Vista Montana prospect and
follow up drilling at the Lana Corina Prospect;
•
Fortuna Project - exploration drilling targeting a porphyry copper-gold system at the
La Florida Prospect; and
•
Jupiter Project - initial exploration activities across priority areas including two
copper geochemical anomalies measuring up to 5km by 3km (footprint).
•
Ms Michaela Stanton-Cook was appointed Joint Company Secretary of the Company on
3 July 2025, with Ms Sue Wong to continue in her role as Joint Company Secretary.
•
Culpeo held its Annual General Meeting during the Quarter, on 1 May 2025 at which all
resolutions put forward were passed.
At Quarter end, the Company had A$0.159 million in cash and cash equivalents and zero debt.
Post quarter end the Company receipted approximately A$2.49 million before costs being Tranche 2
of a A$3.02 million raise.
PAGE |2
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JULY 2025
Figure 1: Culpeo Minerals Limited Project area locations in Chile, the premier copper producing country.
PAGE |3
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JULY 2025
ACTIVITY DETAIL
LANA CORINA PROJECT
The Lana Corina Project is located in the coastal belt of Chile, approximately 350km north of
Santiago. Lana Corina is situated within a northeast-southwest structural corridor extending
over more than 3km of strike15. High-grade copper mineralisation is associated with
outcropping breccia pipes, which occur in the upper levels of a large copper-bearing
porphyry-hosted mineralised system.
3km north of Lana Corina, Culpeo has delineated the high priority Vista Montana target
which is believed to be part of the same mineralised system as Lana Corina.
Lana Corina Prospect
In 2024, Culpeo announced a significant, near-surface, high-grade copper discovery at the
Lana Corina Prospect, with a standout intercept of 454m @ 0.93% CuEq (refer Figure 1).
This intersection included three zones of notable copper and molybdenum mineralisation:5,6
•
78m @ 1.24% CuEq from 200m;
•
68m @ 1.14% CuEq from 320m; and
•
40m @ 1.20% CuEq from 394m.
PAGE |4
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JULY 2025
Figure 2: Plan view of the Lana Corina Prospect area, highlighting the outcropping copper discovery 5, 7, 8, 9, 10, 11, 16.
Vista Montana
Vista Montana is located approximately 3km along strike from the Lana Corina discovery,
forming part of a potentially large, potentially linked mineralised system15. Results from the
latest round of surface sampling confirm a well-defined copper porphyry target, exhibiting
typical zoned alteration and associated geochemical zonation commonly associated with
copper-bearing porphyry intrusions. The core of the porphyry target at surface, measures
approximately 250m by 250m and is interpreted to represent a “finger” of a larger, buried
intrusive identified through geophysical surveying (refer to Figure 3 and 4).
PAGE |5
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JULY 2025
Figure 3: Schematic Diagram showing the pathfinder geochemical and alteration patterns of a typical porphyry
copper mineral system and the relative location of Lana Corina and the NE-Sector – Vista Montana (modified
from Halley et. Al. 201517).
PAGE |6
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JULY 2025
Figure 4: Lana Corina and Vista Montana mineralised trend and location of the Vista Montana zoned porphyry
target above a larger interpreted porphyry target. Image of inverted magnetics 6, 12, 13, 14.
A diamond drilling program has been planned to commence following the completion of drilling at
the Fortuna Project.
Due to the proximity of the small settlement of Soruco, located approximately 750m northwest of
the Vista Montana target area, the Company is in the process of negotiating a long-term access
agreement with the Soruco community to facilitate both the initial drilling and future exploration
programs at Vista Montana. It is expected that an access agreement will be finalised during Q3 2025.
FORTUNA PROJECT
The Fortuna Project is located approximately 25km north of the Company’s Lana Corina Project,
hosting numerous historical small-scale workings that targeted near-surface, high-grade
mineralisation.
La Florida Prospect
The La Florida Prospect has been identified as a high-priority drill target and exhibits strong
similarities to the lithologies and alteration styles observed at the Company’s Lana Corina discovery,
indicating significant potential to host similar, porphyry related high-grade copper mineralisation14,
15, 16.
Subsequent to the end of the Quarter, on 7 July 2025, Culpeo announced a maiden diamond drilling
program has commenced at La Florida Prospect (Figure 5). The program is initially scheduled for four
diamond holes for approximately 1,400m to test the newly defined high priority copper targets.
PAGE |7
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JULY 2025
On 21 July 2025, the Company announced results from a trenching and surface sampling program
at La Florida, which revealed multiple new zones of wide, high-grade copper mineralisation, defining
a highly prospective corridor over 1.7km in length and 500m in width.
Notable zones of surface copper mineralisation, included:
•
21.00m @ 1.10% Cu (FLO1);
•
6.00m @ 2.31% Cu (FLO26);
•
3.00m @ 2.25% Cu (FLO49);
•
10.00m @ 2.70% Cu (FLO67);
•
30.00m @ 1.00% Cu (FLO70);
•
6.00m @ 1.12% Cu (FLO71); and
•
6.00m @ 1.29% Cu (FLO77).
JUPITER PROJECT
Culpeo announced on 14 April 2025 it had entered into a binding, staged option agreement with
Excava Holdings SpA (Excava) to acquire up to 100% of the highly prospective Jupiter Project - a
strategic acquisition offering large-scale, high-grade copper exposure in the Antofagasta region of
Chile. The concession package includes multiple small-scale mines (refer Figure 6) and two distinct
zones of identified copper mineralisation, with surface samples returning grades up to
4.33% Cu and 3.24g/t Au.
The acquisition is structured as a farm-in style arrangement, whereby Excava has transferred the
concessions into a Special Purpose Vehicle (SPV). Culpeo will acquire staged interests in the SPV
subject to meeting exploration and payment milestones, enabling accelerated ownership, and to
ensure operational efficiency and clear delineation of ownership rights.
Financial terms of the acquisition include:
•
Initial Payment: US$40,000 within five business days of executing the binding agreement.
•
Year 1: US$80,000 on the first anniversary of the execution date.
•
Year 2: US$200,000 on the second anniversary.
•
Year 3: US$300,000 on the third anniversary, with Culpeo earning a 51% interest in the Project
upon completion of 2,000m of drilling.
•
Year 4: US$380,000 on the fourth anniversary.
•
Year 5: US$1,000,000 on the fifth anniversary, with Culpeo acquiring an additional 29%
interest (totalling 80%) upon completing an additional 2,000m of drilling.
•
Feasibility Study: US$1,100,000 upon announcing a positive feasibility study under the JORC
Code, securing 100% ownership of the Project.
PAGE |8
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JULY 2025
Figure 5: La Florida trench locations and significant results and planned location of drillholes for the current
program. Datum PSAD56 19S18.
PAGE |9
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JULY 2025
Figure 6: Jupiter Project location map showing proximity to infrastructure, copper mines and the
Coastal Copper Belt (Jurassic Metallogenic Belt)19.
PAGE |10
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JULY 2025
Figure 7: An example of one of several mines within the Jupiter Project area 19.
CORPORATE ACTIVIT Y
Amended Lana Corina Earn-In Schedule
On 28 April 2025, the Company advised that it has agreed to an amended Earn-In Schedule for the
acquisition of the Lana Corina Project, Chile (Lana Corina) (the Earn-In Schedule). This amendment
allows Culpeo to retain the option to increase its ownership In Lana Corina to an 80% aggregate
interest through a further four staged payments at six-monthly intervals (refer to Table 1), and a right
of first refusal to acquire the final 20%, for 100% ownership. Culpeo has sole discretion as to whether
the consideration at each remaining stage is settled in shares or cash.
PAGE |11
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JULY 2025
Table 1: Amended Lana Corina Project Earn-In Schedule
Stage
Period from original
signing
Consideration*
Work
Commitment
Stage
Interest
Aggregate
Interest
(Months)
(US$)
Description
(%)
(%)
1
Signing
100,000
N/A
0
0
2
12
150,000
US$1M expenditure
20
20
3
24
250,000
US$1M expenditure
30
50
4
36
100,000
N/A
0
50
5
48
750,000
N/A
5
55
6
54
750,000
N/A
10
65
7
60
1,650,000
N/A
5
70
8
66
1,650,000
N/A
10
80
Equity Placement
On 9 May 2025, Culpeo announced a placement comprised of a two-tranche issuance of
approximately 303 million new fully paid Ordinary Shares to professional and sophisticated investors,
existing Shareholders, and the Culpeo Board at an issue price of $0.01 per share (Placement Shares),
raising approximately $3.02 million (before costs):
•
Tranche 1: Comprised approximately 32.6 million Placement Shares under ASX Listing Rule
7.1 and approximately 21.7 million Placement Shares under ASX Listing Rule 7.1A; and
•
Tranche 2: Comprised approximately 248.0 million Placement Shares, including Director
participation, approved at a General Meeting of the Company’s Shareholders on 3 July 2025.
Participating investors received one (1) free attaching Unlisted Option for every two (2) Placement
Shares subscribed for, subject to Shareholder approval at the General Meeting (Attaching Options).
The Attaching Options are Unlisted Options and have an exercise price of $0.0175 and 11 July 2028
expiry. The placement was completed subsequent to the end of the Quarter (refer ASX
announcement dated 11 July 2025).
Joint Company Secretary Appointment
Ms Michaela Stanton-Cook was appointed Joint Company Secretary of the Company on 3 July 2025,
with Ms Sue Wong to continue in her role as Joint Company Secretary.
Ms Stanton-Cook is a Chartered Secretary with national governance service provider, Source
Governance and is experienced in providing company secretarial and corporate advisory services to
ASX listed and private companies across various industries. Michaela is a qualified lawyer and
member of the Governance Institute of Australia.
PAGE |12
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JULY 2025
Cash Position at Quarter End
During the Quarter, the Company spent A$0.203 million on exploration activities, primarily focused
on sampling programs and assays. At Quarter end, the Company had A$0.159 million in cash and
cash equivalents and zero debt.
Post quarter end, a General Meeting was held on the 3 July 2025 with all resolutions duly passed.
The Company receipted approximately $2,492,094 before costs, being Tranche 2 of a A$3.02 million
raise with proceeds to be directed towards:
•
Lana Corina Project - up to 4,000m of maiden drilling at Vista Montana prospect and follow
up drilling at the Lana Corina Prospect;
•
Fortuna Project - exploration drilling targeting a porphyry copper-gold system at the La
Florida Prospect; and
•
Jupiter Project - initial exploration activities across priority areas including two copper
geochemical anomalies measuring up to 5km by 3km (footprint).
Payments to Related Parties
As outlined in the Appendix 5B for the Quarter ending 30 June 2025 (Sections 6.1 and 6.2),
approximately A$0.158 million in payments were made to related parties and/or their associates,
which comprised remuneration for Non-Executive Director fees and Consulting fees.
This announcement has been authorised by the Board of Directors of Culpeo Minerals Limited.
CONTACT
Geoff McNamara
Interim Executive Chairman
E: geoff.mcnamara@culpeominerals.com.au
P: +61 (08) 6383 7894
PAGE |13
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JULY 2025
ABOUT CULPEO MINERALS LIMITED
Culpeo Minerals Limited is committed to copper exploration, discovery and development, with strategic assets in
Chile, the world’s leading copper-producing nation. The Company is focused on high-grade copper systems within
Chile’s infrastructure-rich Coastal Cordillera.
Culpeo has recently announced a significant copper and molybdenum discovery at the Lana Corina Project and
acquired the highly prospective Fortuna and Jupiter copper-gold projects.
The Lana Corina and Fortuna Projects are located in Chile’s Coquimbo Region, approximately 350 kilometres north
of Santiago, in proximity to the world-class Los Pelambres mine. The Jupiter Project is situated in the Antofagasta
Region, renowned for hosting multiple tier-one copper and gold operations, including Escondida, Collahuasi and El
Teniente.
These project areas feature substantial outcropping high-grade copper systems, and importantly, they are supported
by well-established regional infrastructure, including roads, power transmission lines, water sources and a strong
local mining industry- factors critical in enabling cost-effective and efficient development.
The Company is led by a highly experienced board and management team with more than two decades of
operational and exploration experience in Chile. Culpeo’s objective is to deliver shareholder value through the
exploration, acquisition and development of high-grade, near-surface copper systems.
COMPETENT PERSONS’ STATEMENTS
The information in this announcement that relates to the Exploration Results and Geophysical Results as listed in the
table below is based on, and fairly represents, information and supporting documentation prepared by the
Competent Person whose name appears in the same row, who is a Director or shareholder of or independent
consultant to the Company and is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM),
Australian Institute of Geoscientists (AIG), Australian Society of Exploration Geophysics (ASEG), or a Recognised
Professional Organisation (RPO). Each person named in the table below has sufficient experience which is relevant
to the style of mineralisation and types of deposits under consideration and to the activity which he has undertaken
to quality as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves.
Activity
Competent Person
Membership
Status
Exploration Results (until 31 Oct 2024)
Mr Maxwell Tuesley (Shareholder and former Director)
AusIMM
Member
Exploration Results (after 31 Oct 2024)
Mr Zeffron Reeves (Director and Shareholder)
AIG
Member
Geophysical Results
Mr Nigel Cantwell (Consultant)
AIG and ASEG
Member
The information relating to Exploration Results and Geophysical Results in this announcement or as otherwise noted
in this announcement, is available from the Company’s website at www. culpeominerals.com.au or on the ASX website
www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects
the Exploration Results and Geophysical Results information included in previous announcements. The Company
confirms that the form and context in which the applicable Competent Persons’ findings are presented have not
been materially modified from the previous announcements.
FORWARD -LOOKING STATEMENTS
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Culpeo Minerals Limited’s planned exploration program and other statements that are not
historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”,
"potential," "should," and similar expressions are forward-looking statements. Although Culpeo Minerals Limited
believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve
risks and uncertainties, and no assurance can be given that actual results will be consistent with these forwardlooking statements.
PAGE |14
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JULY 2025
Appendix A: Culpeo Minerals Exploration Concessions at 30 June 2025
Project
Licence
Company
Area (Ha)
Grant
Expiry
Ownership
Lana - Corina
San Agustin
Socavon
Lana Segunda
Corina
Laco 1 al 10
Sara 1 – 20
Patty 2 1 – 75
Patty 3 1 – 260
Patty 4 1 - 111
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
Antofagasta Minerals
SCM Antares
SCM Antares
SCM Antares
1
1
1
1
10
90
75
260
111
1951
1951
1951
1951
2015
2006
2019
2019
2019
None
None
None
None
None
None
None
None
None
50%
50%
50%
50%
50%
50%
50%
50%
50%
Peta 31/55
Peta 91/92
Peta 15/28
La Rosa 27/28
La Rosa 31/46
La Rosa 1/30
Corredor 2, 1/12
Corredor 3, 1/6
Cachorro 1/20
Cachorro 1,1/160
Cachorro 2, 1/95
Cachorro 3, 1/24
Cachorro 4, 1/173
Cachorro 5, 1/87
Almudena 1,1
Amudena 2, 1/3
Almudena 3, 1/2
Almudena 4, 1/7
Almudena 5, 1/6
Almudena 6,1
Almudena 7,1
Almudena 8,1/4
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
11-Nov-89
11-Nov-89
06-Nov-89
26-Dec-89
28-Jun-11
25-Nov-91
18-Feb-15
18-Feb-15
11-Nov-14
28-Jul-15
18-Feb-15
18-Feb-15
18-Feb-15
18-Feb-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
San Sebastian 1/16 (2/16)
San Sebastian 1/16 (1)
Minera Panga SpA
Minera Panga SpA
1998
1998
None
None
100%
100%
LA FLORIDA 1 a 20
LA FLORIDA II 1 al 20
PIEDRA DURA 1 a 20
EL QUILLAY 5A 1 al 17
EL QUILLAY 4A 1 al 25
Bastis 29CB 1 al 16
Bastis 29CB 17 al 20
LOS QUILLAYES 1/4 (3/4)
LA ESPERANZA 1/10
PRETECATEMO 1/20
Antares 1 al 165
MATILDE 2 1 al 50
El Quillay 2 1 al 224
El Quillay 3 1 al 236
El Quillay 4A 1 al 89
El Quillay 4B 1 al 40
El Quillay 5A 1
El Quillay 5C 1 al 98
El Quillay 6 1 al 13
El Quillay 6A 1 al 7
La Escondida 1-14
FLORIDA 1
FLORIDA 10
FLORIDA 11
FLORIDA 12
FLORIDA 2
FLORIDA 3
FLORIDA 4
FLORIDA 5
FLORIDA 6
FLORIDA 7
FLORIDA 8
FLORIDA 9
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SLM La Escondida
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
2007
2010
2006
2011
2011
2011
2011
1984
1960
1953
2011
2011
2011
2011
2011
2011
2011
2011
2011
2011
2005
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
15/03/2026
15/03/2026
15/03/2026
15/03/2026
15/03/2026
21/02/2026
21/02/2026
13/02/2026
13/02/2026
14/02/2026
14/02/2026
20/02/2026
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Total – Lana Corina
Petacas
550 Ha
Total – Las Petacas
San Sebastian
1,406 Ha
Total – San Sebastian
Fortuna
45
5
50 Ha
Total – Fortuna
Jupiter
120
10
70
6
80
300
12
6
20
160
95
242
173
87
1
3
2
7
6
1
1
4
100
100
96
17
25
127
35
10
50
100
165
200
224
236
89
40
1
98
13
7
42
300
300
300
300
300
300
300
300
300
300
300
300
5,375 Ha
Jupiter 1
200
30/09/2022
18/07/2026
0%
Jupiter 2
200
10/07/2022
25/04/2027
0%
Jupiter 3
200
30/09/2022
22/06/2026
0%
Jupiter 4
200
30/09/2023
28/06/2027
0%
PAGE |15
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JULY 2025
Project
Licence
Company
Area (Ha)
Grant
Expiry
Ownership
Jupiter 5
100
9/12/2022
1/09/2026
0%
Jupiter 6
200
10/07/2023
30/03/2026
0%
Jupiter 7
200
30/09/2022
29/06/2026
0%
Jupiter 8
300
12/07/2023
4/05/2027
0%
Jupiter 9
200
30/09/2022
22/06/2026
0%
Jupiter 10
200
10/07/2023
25/04/2027
0%
Jupiter 11
200
9/12/2022
1/09/2026
0%
Jupiter 12
300
9/09/2022
29/06/2026
0%
Jupiter 13
300
9/09/2022
29/06/2026
0%
Jupiter 14
200
20/09/2023
27/06/2027
0%
Jupiter 15
200
30/09/2022
22/06/2026
0%
Jupiter 16
300
9/12/2022
1/09/2026
0%
Jupiter 17
300
30/12/2022
29/06/2026
0%
Jupiter 118
200
10/07/2023
30/03/2026
0%
Total Jupiter
4,000 Ha
Appendix B: Technical Details
Copper Equivalent (CuEq) values: Assumed commodity prices for the calculation of CuEq is Cu US$3.00/lb, Au
US$1,700/oz, Mo US$14/lb and Ag US$20/oz. Recoveries are assumed from similar deposits: Cu = 85%, Au =
65%, Ag = 65%, Mo = 80%, Cu Eq (%) was calculated using the following formula: ((Cu% x Cu price 1% per
tonne x Cu recovery) + (Au(g/t) x Au price per g/t x Au recovery) + (Mo ppm x Mo price per g/t x Mo recovery)
+ Ag ppm x Ag price per g/t x Ag recovery)) / (Cu price 1% per tonne x Cu recovery). Cu Eq (%) = Cu (%) +
(0.54 x Au (g/t)) + (0.00037 x Mo (ppm)) + (0.0063 x Ag (ppm)). It is the Company’s opinion that all elements
included in the metal equivalents have a reasonable potential to be recovered and sold.
Appendix C: References
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Refer to ASX announcement dated 28 April 2025, “New Priority Targets Identified at Lana Corina and
Fortuna”.
Refer to ASX announcement dated 24 June 2025, “Multiple New High-Priority Targets Identified at La Florida
Copper Prospect.
Refer to ASX announcement dated 4 January 2024, “Copper-Gold Porphyry System Identified at La Florida”.
Refer to ASX announcement dated 21 July 2025, “High-Grade Surface Results at La Florida”.
Refer to ASX announcement dated 19 June 2024, “Exceptional, High-Grade Copper Intersected at Lana
Corina – 298m @ 0.98% CuEq”.
Refer to ASX announcement dated 10 July 2024, “Drill Results Extend Mineralisation at Lana Corina to 454m
@ 0.93% CuEq”.
Refer to ASX announcement dated 11 May 2022, “Culpeo intersects 257m @ 0.95% copper at Lana Corina”.
Refer to ASX announcement dated 6 June 2022, “Culpeo Minerals intersects 173m @ 1.05% copper”
Refer to ASX announcement dated 23 November 2022, “Drilling intersects 169m @ 1.08% Cu grades up to
3.56% Cu”.
Refer to ASX announcement dated 2 May 2022, “Culpeo intersects 104m @ 0.74% copper at Lana Corina”.
Refer to ASX announcement dated 20 June 2022, “Multiple high-grade Cu intersections at Lana Corina
Project”.
Refer to ASX announcement dated 31 August 2022, ”Culpeo Minerals Strikes Critical Metals at Lana Corina”.
Refer to ASX announcement dated 8 March 2023, ”Geochemical Survey Completed at Lana Corina”
Refer to ASX announcement dated 27 May 2024, ”High-Grade Copper Assay Results from Vista Montana”.
Refer to ASX announcement dated 16 January 2023, ”Culpeo Minerals Drills 72m @ 0.91% CuEq and 35m
@ 1,704ppm Mo (0.84% CuEq)”.
Refer to ASX announcement dated 20 March 2023, ”Culpeo Minerals Earns 20% of the Newly Discovered
High-Grade Lana Corina Copper and Molybdenum Project”.
Refer to ASX announcement dated 3 April 2023, ”Geochemical Survey Identifies Multiple Significant
Surface Copper and Molybdenum Targets at Lana Corina”.
Refer to ASX announcement dated 21 July 2025, ”High-Grade Surface Copper Mineralisation Identified at
the La Florida Prospect”.
PAGE |16
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JULY 2025
19.
Refer to ASX announcement dated 14 April 2025, ”Culpeo Minerals Enters into Staged Option Agreement
to Acquire Jupiter Project, Chile”.
PAGE |17