Investor Presentation
Released
Released
Announcement PDF
ASX: CPO | OTCID: CPORF
TARGETING LARGE-SCALE, HIGH-
GRADE NEW DISCOVERIES IN THE
LAND OF THE COPPER GIANTS
Investor Presentation 2
DISCLAIMER AND IMPORTANT INFORMATION
This Presentation and any accompanying verbal Presentation (together the Presentation) has been prepared by Culpeo Minerals Limited (Culpeo or the Company) and approved by the
Executive Chairman of the Company. The information contained in the Presentation (Information) is a summary only and should be read in conjunction with any oral briefing and all other
documents provided to you by the Company. The Information is current as of the date of this release and the Company does not undertake to provide any additional or updated
information, whether as a result of new information, future events or results or otherwise. By receiving the Presentation, you acknowledge and represent to the Company that you have
read, understood and accepted the terms of this disclaimer.
The Company has prepared the Presentation based on information available as of this release. No representation or warranty, express or implied, is made as to the currency, accuracy,
reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Neither Culpeo, its related bodies corporate, shareholders or affiliates, nor
any of their respective officers, directors, employees, affiliates, agents or advisers (Agents) guarantee or make any representations or warranties, express or implied, as to or take
responsibility for, the currency, accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Culpeo does not represent or
warrant that this Presentation is complete or that it contains all material information about Culpeo or which a prospective investor or purchaser may require in evaluating a possible
investment in Culpeo or acquisition of shares. To the maximum extent permitted by law, Culpeo and its Agents expressly disclaim any and all liability, including, without limitation, any
liability arising out of fault or negligence, for any loss arising from the use of information contained in this Presentation, or otherwise arising in connection with it.
Any forward-looking statements in this Presentation, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication or
guarantee of future performance and involve known and unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which are outside the control of
Culpeo and which are subject to change without notice and could cause the actual results, performance or achievements of Culpeo to be materially different from the future results,
performance or achievements expressed or implied by such statements. Past performance is not necessarily a guide to future performance and recipients of this Presentation are cautioned
not to place undue reliance on such forward-looking statements.
The information contained in this Presentation is for information purposes only, does not constitute investment or financial product advice (nor taxation, accounting or legal advice) and is
not intended to be used as the basis for making an investment decision. In providing this Presentation, Culpeo has not considered the objectives, financial position or needs of any
particular recipients. Before making an investment decision prospective investors should consider the appropriateness of the information in this Presentation having regard to their own
objectives, financial situation and needs, and seek legal, taxation and financial advice appropriate to their jurisdiction and circumstances.
This Presentation is not a prospectus, product disclosure statement or other offering document under Australian law or any other law (and will not be lodged with the Australian Securities
and Investments Commission, or any other foreign regulator) and is not, and does not constitute, an invitation or offer of securities for subscription, purchase or sale in any jurisdiction. In
particular, this Presentation does not constitute an invitation or offer of securities for subscription, purchase or sale in the United States or any other jurisdiction in which such an offer
would be illegal. The securities referred to in this Presentation have not been, and will not be, registered under the U.S. Securities Act of 1933 as amended or the securities laws of any state
or other jurisdiction of the United States and may not be offered or sold, directly or indirectly in the United States.
The information in this Presentation is strictly confidential. It may not be disclosed, reproduced, disseminated, quoted or referred to in whole or in part, without the express consent of
Culpeo.
ABOUT CULPEO MINERALS
Culpeo confirms that it is not aware of any new information or data that materially affects the information included in
those releases. All material assumptions and technical parameters underpinning those releases continues to apply and
has not materially changed.
TWO PRIMARY PROJECT AREAS IN
THE LAND OF THE COPPER GIANTS
LANA CORINA PROJECT
A high-grade outcropping new discovery,
454m at 0.96% CuEq returned from 90m
Mo
Cu
FORTUNA PROJECT
Potential new discovery at La Florida, where maiden
drilling returned 6.10m at 1.35% Cu from 10m
Au
Cu
1. Refer Appendix 1 for additional details including CuEq calculation methodology.
2. Refer to ASX announcement dated 7 October 2025.
DRILLING UNDERWAY AT EL QUILLAY SOUTH
DRILLING SET TO COMMENCE AT VISTA MONTANA
10kms
LA FLORIDA
Porphyry Cu/Au System 1,700m x 500m
MULTIPLE PROSPECTS
Channel and Surface Sampling Results Support
High-Impact Target Generation
LANA CORINA
New Discovery: 454m at 0.96% CuEq from 90m
(CMLCD014)
VISTA MONTANA
Just 1km along-strike from the
Lana Corina Discovery
LANA CORINA PROJECT
FORTUNA PROJECT
Au
Cu
LEGEND
Culpeo tenements
CPO prospect
Road network
Punitaqui copper-gold mine
Power
0 5km
N
Investor Presentation 3
ABOUT CULPEO MINERALS
A DEFINING COMMODITY OF THE
ENERGY TRANSITION
• Global electrification, digitalisation and
rising power intensity are driving structural
demand growth
• Copper demand increasing across electricity
grids, renewable energy, electric vehicles,
data centres and industrial infrastructure
CHILE IS SYNONYMOUS WITH
COPPER MINING AND PRODUCTION
• World’s leading copper-producer,
established mining supply chain, extensive
infrastructure and a highly skilled
workforce
• Tier 1 geological endowment that has
delivered some of the largest and most
significant copper deposits globally
TARGETING LARGE-SCALE PORPHYRY
AND RELATED COPPER SYSTEMS
• Focused, high-impact portfolio anchored
by the Lana Corina copper-molybdenum
discovery
• Supported by access to roads, power, water
and established local mining capability
Investor Presentation 4
3.
1. 2.
GENERATION TRANSMISSION ELECTRIC VEHICLES DATA CENTRES INDUSTRIAL GROWTH
Investor Presentation 5
THE CONDUCTIVE BACKBONE OF THE MODERN ECONOMY
ONE OF THE MOST CREDIBLE LONG-TERM COMMODITY THEMATICS IN THE RESOURCES SECTOR
DEMAND IS BROAD-BASED AND DIVERSIFIED
NOT DEPENDENT ON ONE TECHNOLOGY PATHWAY OR SINGLE OVERACHING THESIS
130
325
228
263
309
774
2025 2026 2027 2028 2029 2030
COPPER IS IN STRUCTURAL DEFICIT
DATA CENTRE-LED CAPEX SUPERCYCLE IS
DRIVING SIGNIFICANT POWER INVESTMENT
UNDERINVESTMENT IN EXPLORATION HAS
CONSTRAINED THE SUPPLY PIPELINE
SUSTAINED SUPPLY DEFICIT IS FORECAST AS
DEMAND OUTPACES NEW PRODUCTION
LME PRICES ARE FORECAST TO INCREASE
FROM US$6.14/LB TO US$6.50/LB BY 2027
Source: Jefferies, ‘Base Metals Price Forecasts’, June 2026; Investing.com summary (7 June 2026); LME copper spot via Trading Economics, July 2026.
COPPER SUPPLY GAP
(kt, notional)
SHARE OF WORLD MINE
PRODUCTION IN 2025
VERY WELL-ESTABLISHED
INFRASTRUCTURE
SKILLED INDUSTRY AND
WORKFORCE
DEEP MINING SUPPLY
CHAIN
AIRPORT
160km
PORT
160km
PORT
100km
DESAL PLANT
160km
LA SERENA
Pop 200,000
WORKFORCE
160km
Cu Au
SMELTER
130km
COMBARBALA
Pop 13,600
POWER
90km
POWER
3km
POWER
90km
ILLAPEL
Pop 32,000
SALAMANCA
Pop 26,000
SALAMANCA
Pop 26,000
WORKFORCE
120km
Au
Cu
WORKFORCE
70km
WORKFORCE
50km
Cu
Au
Au
Cu Mo
Source: USGS Mineral Commodity Summaries 2026 (data for 2025 production).
CHILE IS SYNONYMOUS WITH COPPER
FORTUNA
LANA CORINA
50km
0
N
23%
CHILE
Investor Presentation 7
LANA CORINA PROJECT
Refer to ASX announcements dated 10 July 2024 and 6 July 2026 and refer to Appendix 1 for additional details including CuEq calculation methodology.
Culpeo confirms that it is not aware of any new information or data that materially affects the information included in those releases. All material
assumptions and technical parameters underpinning those releases continues to apply and has not materially changed.
• New copper-molybdenum discovery made in 2024
• Drill hole CMLCD014 returned a spectacular
intersection of 454m at 0.96% CuEq from 90m
• Consistency of mineralisation strongly supports the
interpretation of a near-surface, high-grade
breccia zone and associated porphyry
mineralisation at depth
• Below the porphyry hosted copper mineralisation,
CMLCD014 intersected several wide zones of
molybdenum mineralisation, results included
1,638ppm Mo (0.68% CuEq) over 46m.
• Negotiations for a long-term agreement to advance
this discovery are nearing conclusion
• Programme of follow-up drilling is planned and is
expected to commence in August 2026
LANA CORINA
454m at 0.96% CuEq from 90m (CMLCD014); incl
78m at 1.24% CuEq from 200m
257m at 1.10% CuEq from 170m (CMLCD002)
173m at 1.09% CuEq from 313m (CMLCD003)
169m at 1.21% CuEq from 239m (CMLCD010)
VISTA MONTANA
Just 1km Along Strike From the
Lana Corina Discovery
LANA CORINA PROJECT
LEGEND
Culpeo tenements
CPO prospect
Road network
Punitaqui copper-gold mine
Power
0 5km
N
Investor Presentation 8
10kms
PORPHYRY TARGET
PORPHYRY TARGET
VOX 3D MAGNETIC INVERSION MODEL IMAGE
Magnetic low
Near surface breccia drill targets
Zoned porphyry target
SUCCESSFUL LINKAGE WOULD ESTABLISH A 3KM MINERALISED SYSTEM
OPEN IN ALL
DIRECTIONS
LANA CORINA PROJECT
NE
SW
9
Investor Presentation
LANA CORINA DISCOVERY VISTA MONTANA PROSPECT
LEGEND
Culpeo tenements
CPO prospect
Road network
0 5km
N
FORTUNA PROJECT
LA FLORIDA
Porphyry Cu/Au System 1,700m x 500m
6.65m at 1.03% Cu from 14.00m (CMLFD002)
6.10m at 1.35% Cu from 10.00m (CMLFD005)
7.47m at 1.36% Cu from 115.00m; (CMLFD005),
incl 0.49m at 4.19% Cu from 121.50m
MULTIPLE HIGH-
POTENTIAL PROSPECTS
Channel and Surface Sampling Results Support
High-Impact Target Generation
FORTUNA PROJECT
Investor Presentation 10
• Large concession area covering over 7,000 hectares
• Historic artisanal mines span over 6km of strike
• Multiple high-potential targets identified from channel
and surface sampling
• Records show historical shallow mining of
approximately 200,000 tonnes at 2% copper
• Successful maiden drill programme at the La
Florida Prospect delivered multiple, high-grade
results from surface
Refer to ASX announcement dated 4 January 2024, Culpeo confirms that it is not aware of any new information or data that materially affects the
information included in those releases. All material assumptions and technical parameters underpinning those releases continues to apply and has
not materially changed. Note the historic mine production records are based on previous explorer’s reports and has not been verified by the Company
and are not JORC compliant (ASX announcement 11 September 2023)
Investor Presentation 11
FORTUNA PROJECT
Refer to ASX announcement dated 4 January 2024, Culpeo confirms that it is not aware of any new information or data that materially affects the information included in those
releases. All material assumptions and technical parameters underpinning those releases continues to apply and has not materially changed.
Porphyry schematic, see https://earthsci.org/mineral/mindep/phor_dep/por_dep.html
• Large 1.7km x 0.5km footprint interpreted copper-gold
porphyry system delineated at the La Florida Prospect
• Results from surface sampling returned grades up to 3.96% Cu
and 2.61g/t Au
• Mineralisation styles are analogous to Lana Corina
• Maiden drill programme intersected:
• 6.7m at 1.03% Cu from 14.00m (CMLFD002); including:
-4.4m at 1.44% Cu from 15.00m
• 6.1m at 1.35% Cu from 10.00m (CMLFD005)
• 16.0m at 0.7% Cu from 107.00m (CMLFD005); including
-7.5m at 1.36% Cu from 115.00m; including
-0.5m at 4.19% Cu from 121.50m
SCHEMATIC REPRESENTATION OF INTERPRETED PORPHYRY TARGET
Investor Presentation 12
Refer to ASX announcements dated 15 June 2026, 6 July 2026. and 13 July 2026.
FORTUNA PROJECT
• Rock chip sampling programme completed
in June 2026 as part of a broader
geological mapping programme
• At La Florida, four of the 15 samples
returned copper values greater than 1.0%
Cu, with the strongest result of 3.0% Cu
• At El Quillay, two samples returned assays
>1.0% Cu, with a peak result of 2.2% Cu
• Results informed planning for a four-hole,
1,000m diamond drilling programme that
commenced in early July 2026
• Programme designed to test the strike and
depth potential of the El Quillay Fault Zone
• Induced Polarisation (IP) survey underway
comprising10 lines for a total of 24km
covering La Florida and El Quillay North,
El Quillay South and Peidra Dura
Interpreted position of the EQFZ and its association with significant
copper mineralisation on a satellite background
Interpreted position of the EQFZ and its association with significant
gold mineralisation on a satellite background
Investor Presentation 13
CORPORATE SNAPSHOT
CAPITAL STRUCTURE REGISTER COMPOSITION
Share price (at 20 July 2026) A$0.012
Shares on issue (at 10 July 2026) 795.1M
Unlisted options and rights (post new option issue) 257.6M
Market capitalisation (at 20 July 2026) A$9.54M
Cash (at 30 June) A$2.1M
Debt (at 30 June) Nil
Enterprise value (undiluted) A$7.8M
2%
40%
58%
Board and management
Top 20
Other
Investor Presentation 14
BOARD AND MANAGEMENT
• Over 30 years’ of international resource
sector experience.
• Founder of Tesoro Gold Ltd which
discovered the El Zorro Gold Project, 1st
IRGS discovered and defined n Chile.
• Previously Director of Mining Finance at
Societe General, New York.
• Private Equity Manager for PRCM (FUM
US$800M).
• Previous operational roles include
Project Manager, Senior Mine Geologist
and Mine Geologist for Ivanhoe Mines,
Lion Ore International and WMC.
• Geologist with more than 25 years’ of
resource experience, spanning
greenfield exploration, mineral
discovery, definition and feasibility,
construction, production and closure.
• Managing Director of ASX listed Tesoro
Gold Ltd, a company that has defined
the El Zorro Gold Project in Chile.
• Track record of exploration success
identifying and delineating new gold
districts in Brazil and Chile.
• Mining engineer with over 30 years’
experience in mining, exploration and
corporate development across gold and
base metal commodities within
Australia, Burkina Faso and DRC.
• Currently CEO Reidel Resources and
Consultant to Sarama Resources Ltd.
• Previously held senior roles with Moto
Goldmines, Gold Fields and WMC
Resources.
• Fellow of the Australasian Institute of
Mining and Metallurgy.
• Corporate administrator, manager and
development professional with deep
Chilean experience.
• More than 10 years’ resource sector
experience spanning greenfields
exploration, discovery production,
closure, retreatment and tailings
reclamation.
• Country Manager for ASX listed Tesoro
Gold Ltd Chile, and previously General
Manager of Acorn Mining Chile and
Country Manager for Cleveland Mining
Chile.
• Geologist and mining executive with
more than 35 years’ resource sector
experience, including leading
exploration teams in Australia, Eastern
Europe, Africa and South America.
• Former Managing Director of Lodestar
Minerals and Chief Executive Officer of
Kingwest Resources, where he
increased the Menzies Gold Project
Mineral Resource from 170,000 ounces
to 505,000 ounces.
• Inaugural Chief Executive Officer of
Galena Mining, leading the Company
through its ASX listing and the
definition of the high-grade Abra lead-
silver Mineral Resource.
INTERIM EXECUTIVE
CHAIR
NON-EXECUTIVE
DIRECTOR
NON-EXECUTIVE
DIRECTOR
TECHNICAL
MANAGER
CHILEAN COUNTRY
MANAGER
ONGOING EXPLORATION
Investor Presentation 15
CULPEO MINERALS LIMITED
Investor Presentation 16
TARGETING LARGE-SCALE, HIGH-
GRADE COPPER SYSTEMS
THE DEFINING COMMODITY
OF THE ENERGY TRANSITION
WORLD’S PREMIER COPPER
JURISDICTION
Cu
COPPER
29
CULPEO MINERALS LIMITED
31 CLIFF STREET
FREMANTLE WA 6160
+61 (8) 6383 7894
info@culpeominerals.com.au
geoff.mcnamara@culpeominerals.com.au
Investor Presentation 18
CORPORATE EVENT
RIGHTS OFFER DETAILS IMPORTANT DATES
Price per new option A$0.003
Option entitlement ratio (options: shares held) 1:4
Shares currently on issue 795.1M
Options currently on issue 257.6M
New options to be issued under the offer 198.3M
Gross proceeds of the issue of new options A$595k
Options on issue post-offer completion 456.0M
• Contact: Automic Registry Services Telephone: 1300 288 664
(within Australia) +61 2 9698 5414 (International)
• Refer to: The Replacement Entitlement Issue Prospectus, released
to the ASX on 8 July 2026
• Visit our website: https://culpeominerals.com.au/prospectus
Ex-date Friday, 17 July 2026
Record date Monday, 20 July 2026
Prospectus dispatched Thursday, 23 July 2026
Opening data Thursday, 23 July 2026
Last day to extend closing date Thursday, 30 July 2026
Closing date Tuesday, 4 August 2026
Announcement of results of offer Thursday, 6 August 2026
Issue of new options Friday, 17 July 2026
FOR FURTHER DETAILS
Investor Presentation 19
APPENDIX A
• 454m at 0.96% CuEq from 90m in CMLCD014¹
• 257m at 1.10% CuEq from 170m in CMLCD002²
• 173m at 1.09% CuEq from 313m in CMLCD003³
• 169m at 1.21% CuEq from 239m in CMLCD010⁴
• 104m at 0.83% CuEq from 155m in CMLCD001A⁵
• 81m at 1.14% CuEq from 302m in CMLCD005A⁶
LANA CORINA DISCOVERY – DIAMOND DRILLING
1. ASX Announcement dated 10 July 2024 “Lana Corina Drill Results Extended – 454m @ 0.93% CuEq”.
2. ASX Announcement dated 11 May 2022 “Culpeo Intersects 257m @ 0.95% copper at Lana Corina”.
3. ASX Announcement dated 6 June 2022 “Culpeo Minerals Intersects 173m @ 1.05% copper”.
4. ASX Announcement dated 23 November 2022 “Drilling Intersects 169m @ 1.08% Cu Grades up to 3.56% Cu”.
5. ASX Announcement dated 2 May 2022 “Culpeo Intersects 104m @ 0.74% copper at Lana Corina”.
6. ASX Announcement dated 20 June 2022 “Multiple High-Grade Cu Intersections at Lana Corina”.
Activity Competent Person Membership Status
Exploration Results
(after 1 May 2026)
Mr Ed Turner AusIMM
Member
Exploration Results
(until 31 Oct 2024)
Mr Maxwell Donald Tuesley
(Shareholder and former Director)
AusIMM Member
Exploration Results
(until 1 May 2026)
Mr Zeffron Reeves
(Director and Shareholder)
AIG Member
Geophysical Results
Mr Nigel Cantwell
(Consultant)
AIG and ASEG Member
Investor Presentation 20
APPENDIX B
COPPER EQUIVALENT (CuEq) CALCULATIONS COMPETENT PERSONS’ STATEMENTS
COURSE CHALCOPYRITE VEINS 2.40% CU (341.5 - 342.5M) IN CMLCD005
The information in this announcement that relates to the historic Exploration Results and Geophysical
Results as listed in the table below is based on, and fairly represents, information and supporting
documentation prepared by the Competent Person whose name appears in the same row, who is a
Director or shareholder of or independent consultant to the Company and is a Member of the Australasian
Institute of Mining and Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG), Australian Society
of Exploration Geophysics (ASEG), or a Recognised Professional Organisation (RPO). Each person named in
the table below has sufficient experience which is relevant to the style of mineralisation and types of
deposits under consideration and to the activity which he has undertaken to quality as a Competent Person
as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves.
• Assumed commodity prices: Cu US$4.75/lb, Au US$3,200/oz, Mo
US$20/lb and Ag US$35/oz.
• Recoveries are assumed from similar deposits: Cu 85%, Au 65%,
Ag 65% and Mo 80%.
• CuEq (%) is calculated using the following formula: ((Cu% x Cu
price 1% per tonne x Cu recovery) + (Au(g/t) x Au price per g/t x
Au recovery) + (Mo g/t x Mo price per g/t x Mo recovery) + (Ag
g/t x Ag price per g/t x Ag recovery)) / (Cu price 1% per tonne x
Cu recovery)
• CuEq (%) = Cu (%) + (0.83 x Au (g/t)) + (0.00040 x Mo (g/t)) +
(0.009 x Ag (g/t)).
• It is the Company’s opinion that all elements included in the metal
equivalent calculation have a reasonable potential to be recovered
and sold.
Investor Presentation 21
APPENDIX C
LANA
CORINA
PERIOD FROM
ORIGINAL SIGNING
CONSIDERATION
WORK
COMMITMENT
STAGE
INTEREST
AGGREGATE
INTEREST
(Months) (US$) Description (%) (%)
1 Signing 100,000 N/A 0 0
2 12 150,000 US$1M expenditure 20 20
3 24 250,000 US$1M expenditure 30 50
4 May 2025 150,000 N/A 0 50
5 Sept 2026 600,000 N/A 5 55
6 Mar 2027 700,000 N/A 10 65
7* Mar 2028 1,000,000 N/A 5 70
8 Mar 2028 1,650,000 N/A 10 80
FORTUNA
PERIOD FROM
ORIGINAL SIGNING
CONSIDERATION
WORK
COMMITMENT
STAGE
INTEREST
AGGREGATE
INTEREST
(Months) (US$) Description (%) (%)
1 12 120,000 N/A 80 80
2 24 120,000 N/A 0 80
3 36 120,000 N/A 0 80
4 48 120,000 N/A 0 80
5 60 120,000 US$1M expenditure4 0 80
ASX Announcement dated 16 March 2026 “Culpeo Improves Terms of Lana Corina Earn-In”
*Stage 7 USD 1,000,000 payable in cash or shares at Culpeo’s election