ASX ANNOUNCEMENT 31 JULY 2024
QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDED 30 JUNE 2024
Culpeo Minerals Limited (Culpeo or the Company) (ASX:CPO, OTCQB:CPORF) is pleased to report on its
activities for the quarter ended 30 June 2024 (the Quarter).
HIGHLIGHTS
LANA CORINA PROJECT (50% CULPEO, EARNING 80%15)
•
Diamond drilling at Lana Corina returned a long, high-grade intersection from near-surface of
298m of 0.98% CuEq in CMLCD0141, with drilling continuing to test the full extent of mineralisation
at depth.
•
Subsequent assays, returned post quarter end from diamond hole CMLCD014 further increased the
mineralised interval to 454m @ 0.93% CuEq from 90m, with the following notable copper
equivalent results2:
•
78m @ 1.24% CuEq from 200m1
•
68m @ 1.14% CuEq from 320m1
•
40m @ 1.20% CuEq from 394m2
•
Drilling is ongoing in CMLCD014, reaching a current depth of (870m), with assays outstanding for a
further 96m and results expected in the coming weeks.
•
The mineralised zone encountered in CMLCD014 has expanded to a projected surface footprint of
600m x 400m and to a depth of 800m and remains open in all directions2.
•
Results from reconnaissance rock-chip sampling at Vista Montana returned high-grade
mineralisation of up to 2.62% Cu, defining an area of anomalous copper 1km-long by 400m wide.3
FORTUNA PROJECT (80% CULPEO7)
• Remodeling of geophysical data identified additional targets at El Quillay West, further
enhancing the significant exploration opportunity within the 4,025-hectare Fortuna Project
area.4,5
•
The El Quillay West target demonstrates potential to host additional zones of mineralisation
500m to the southwest of the main El Quillay Fault Zone.
•
Reconnaissance drilling at the Vaca Muerta and El Quillay North targets intersected multiple zones
of shallow, high-grade copper mineralisation, with notable intersections that included6:
•
13.3m @ 0.59% CuEq from 20m (El Quillay North)
•
4m @ 0.65% CuEq from 45m (Vaca Muerta)
•
7m @ 0.67% CuEq from 55m, including, 1m @ 2.19% CuEq (Vaca Muerta)
•
2m @ 1.33% CuEq from 95m (Vaca Muerta)
PAGE | 1
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 JULY 2024
Operating Activities
Drilling activity during the June quarter focused on exploration at the Lana Corina Project. The program
was designed to target extensions of broad zones of high-grade copper, gold, silver and molybdenum
mineralisation within a >3km prospective mineralised corridor that links Lana Corina to Vista Montana.
During the quarter, the remaining results were returned from reconnaissance drilling at the Fortuna
Project, where high-grade mineralisation was encountered at Vaca Muerta and El Quillay North.
Figure 1: Plan view of the Fortuna and Lana Corina Project areas4,7,8,9,10,11,12,13,14.
PAGE | 2
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 JULY 2024
LANA CORINA PROJECT (50% CULPEO EARNING 80%15)
The Lana Corina Project is located in the coastal belt of Chile, approximately 350km north of Santiago.
The project benefits from substantial existing local infrastructure including sealed road access and a
75MW power station approximately 3km to the east.
The Project is situated within a structural trend orientated in a northeast-southwest direction with >3km
of strike and up to 400m wide. High-grade copper mineralisation is associated with four breccia pipes
occurring in the upper levels of a large copper bearing porphyry hosted mineralised system.
The top of the Lana Corina and Vista Montana mineralised system (Figure 2) presents a series of
outcropping copper bearing magmatic / hydrothermal breccias. At depth, the system transitions into a
mineralised micro-tonalite which hosts consistent copper mineralisation, present mainly as chalcopyrite2.
A significant zone of molybdenite mineralisation is located below the Lana Corina intrusive/breccia
complex representing a magmatic cupola zone. The deeper molybdenum mineralisation is interpreted as
a vertically continuous mineralised system varying in style as a result of temperature and pressure
gradients. The footprint of the Lana Corina system is 600m by 400m, with drilling extending mineralisation
to a current depth of 870m2.
Figure 2: Lana Corina/Vista Montana long section: Defined targets over >3km of strike (background image is
the VOXI 3D magnetic inversion model)3,2,16,17.
PAGE | 3
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 JULY 2024
Figure 3: Plan view of drilling results at Lana Corina2,18,19,20,21,22.
Lana Corina
During the quarter, Culpeo received results from the first 388m of hole CMLCD014, which produced a
significant downhole intersection containing copper-molybdenum mineralisation of 298m @
0.98% CuEq1.
The objective of this drillhole was to test for a deeper, mineralised porphyry system is beneath the
previously drilled high grade , copper bearing breccia pipes, as well as extend the known high-grade
breccia hosted mineralisation to the west and closer to the surface.
Figure 4: Example of high-grade copper mineralisation in hole CMLCD014 – 2.71% CuEq (256-258m)1.
PAGE | 4
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 JULY 2024
Figure 5: Cross-section through the Lana Corina Project showing position of Hole CMLCD014 (Looking southwest with a 40m wide clipping plan)2.
PAGE | 5
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 JULY 2024
This intersection represents the widest ever continuously mineralised intersection in the project’s history.
The consistency of the 298m wide intersection has exceeded Culpeo’s expectations and supports the
Company’s current understanding of the geological model.
Subsequent to end of quarter, additional results returned from CMLCD014 (Figure 5) further increased
the intersection to 454m @ 0.93% CuEq from 90m2. This significant intersection includes several wide
zones of high-grade molybdenum mineralisation.
To date, this intersection includes the following notable high-grade zones1,2:
•
78m @ 1.24% CuEq from 200m; and
•
68m @ 1.14% CuEq from 320m; and
•
40m @ 1.20% CuEq from 394m
Figure 6: Example of high-grade copper mineralisation in hole CMLCD014, 1.74% CuEq (414m to 416m) 2.
Figure 7: Example of high-grade molybdenum mineralisation in hole CMLCD014, 4,350ppm Mo (1.70% CuEq)
(498m to 500m)2.
PAGE | 6
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 JULY 2024
Vista Montana
The Vista Montana Prospect is located 1km north-east of Lana Corina and is hosted within the same
regional structural corridor. The recent discovery of a copper-bearing sheeted vein system and associated
stock-work breccia zone at Vista Montana demonstrates the potential for Lana Corina-style mineralisation
to be present at shallow levels below outcropping mineralisation in the area.
Following the generation of multiple exploration targets at Vista Montana from a recently completed
geochemical survey, the company initiated a detailed mapping programme over the area17.
This mapping delineated an extensive zone of copper-bearing sheeted veins covering an area of 400m x
300m, which appears to be related to possible porphyry intrusive centres identified from geophysics and
previous sampling23.
Figure 8: Plan view of Vista Montana highlighting grades up to 2.62% Cu from surface sampling results3.
A surface sampling programme conducted at Vista Montana of 54 samples, identified outcropping
copper-mineralisation coinciding with interpreted porphyry intrusive centres (Figure 8). Results confirm
a 1km-long by 400m-wide, copper bearing sheeted vein swarm, with grades of up to 2.62% Cu returned
from multiple copper-quartz veins3.
PAGE | 7
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 JULY 2024
FORTUNA PROJECT (80% CPO7)
El Quillay West
Geophysical data remodelling conducted at El Quillay has identified a large Induced Polarisation (IP)
chargeability anomaly, indicative of possible copper sulphide mineralisation4. This anomaly has a footprint
of 500m x 300m, representing a possible third zone of copper sulphide mineralisation at El Quillay.
Figure 9: Plan view of El Quillay copper trend, showing multiple zones of potential parallel mineralisation. The
plan view also includes results of CMEQD001 and CMEQD0024,6,8,9,10,10,14,14,24.
Modelling of Pole-Dipole Induced Polarisiation (PDIP) survey data has identified four PDIP chargeability
anomaly targets from the raw PDIP data, which have potential for copper sulphide mineralisation4.
The four anomalies are located within the north-western part of the PDIP survey area, including one
chargeability anomaly high coincident with known copper sulphide within the El Quillay North Prospect
area (refer to Figure 10 below). Three of the PDIP target areas are untested by existing drilling, including
a high-priority target with follow-up ground-based exploration planned.
PAGE | 8
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 JULY 2024
Figure 10: El Quillay PDIP chargeability anomaly areas (green polygons) with priority ranking shown over a
depth slice image from 100m below ground level. Pink = higher chargeability and blue = lower chargeability 4.
El Quillay North
The El Quillay North Prosect is hosted within a >3km long regional fault zone in an area previously
exploited by both open cut and underground mining. Multiple mineralised zones have been identified
by Culpeo, measuring up to 1km long, 50m wide and 200m deep (Figure 9).
Culpeo has completed 2 holes for 138.6m’s at El Quillay North and assays were received during the
quarter.
Assay results from the second hole drilled at El Quillay North returned 13.3m @ 0.59% CuEq from 20m
downhole (Figure 9 and 11), confirming further shallow copper mineralisation within the target6. The
previous drillhole CMEQD002 returned 26m @ 0.81% CuEq from 29m including a high-grade zone of 4m
of 1.87% CuEq from 51 to 55m13.
PAGE | 9
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 JULY 2024
Figure 11: Cross sections through the El Quillay North Prospect, with results of CMEQD0016.
Vaca Muerta
Positive assay results were received from early-stage reconnaissance drilling at the Vaca Muerta Prospect.
A total of 335.1m’s of diamond drilling was completed in two holes.
Drillhole CMVMD002 was designed to test the known surface copper mineralisation and intersected
multiple zones of copper mineralisation from shallow depths. (Figure 12)6. A high-grade intercept of 1m
@ 2.19% CuEq was returned from a zone of brecciated volcanics from 55m6.
Further work is planned in the form of detailed surface mapping with a focus on understanding the
structural controls on mineralisation which will assist in the planning of the next phase of drilling at the
prospect.
PAGE | 10
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 JULY 2024
Figure 12: Cross sections through the Vaca Muerta Prospect, with results of CMVMD002 6.
Corporate Activities
Cash position at Quarter End
During the quarter, the Company spent A$0.543 million on exploration activities which mainly comprised
exploration drilling and assays. At quarter end, the Company had A$0.403 million in cash and cash
equivalents and zero debt.
Payments to Related Parties
As outlined in the Appendix 5B for the quarter ending 30 June 2024 (Sections 6.1 and 6.2), approximately
A$220k in payments were made to related parties and/or their associates, which comprised remuneration
for the Managing Director, Non-Executive Director fees and Consulting fees.
Change of Address and Contact Details
The Company advises that effective 3 September 2024, the Company’s Registered Address and Principal
Place of Business will be changed to c/- Source Services, Level 39, 152 – 158 St Georges Terrace, Perth
WA 6000. The Company’s phone number will be changed to (08) 6383 7894. The Company’s website and
email addresses remain unchanged.
PAGE | 11
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 JULY 2024
This announcement has been authorised by the Board of Directors of Culpeo Minerals Limited
CONTACT
Max Tuesley
Managing Director
E: max.tuesley@culpeominerals.com.au
P: +61 (08) 6311 9160
PAGE | 12
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 JULY 2024
ABOUT CULPEO MINERALS LIMITED
Culpeo Minerals Limited is committed to copper exploration and development, with strategic
investments in Chile, a leading global copper producer. Focusing on high-grade copper systems in
Chile's, the Company has recently announced a significant copper discovery at Lana Corina and
acquired the promising Fortuna Project.
Both projects are located in Chile's Coquimbo region, renowned for its numerous world-class copper
and gold mines. These project areas feature significant outcropping high-grade copper deposits, and
the region's infrastructure includes access roads, power lines, water sources, and local settlements,
all of which are essential for, and help facilitate economic mining activities.
The Company is led by a skilled board and management team with extensive Chilean knowledge and
a strong local network. Drawing on over two decades of experience and established relationships
within Chile, the Company actively seeks cost-efficient discoveries and acquisitions. Culpeo’s main
objective is to increase shareholder value through the exploration, acquisition, and development
high-grade, near surface mineralised systems.
PAGE |8
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 JULY 2024
COMPETENT PERSONS’ STATEMENTS
The information in this announcement that relates to Exploration Results is based on information
compiled by Mr Maxwell Donald Tuesley, BSc (Hons) Economic Geology, MAusIMM (No 111470). Mr
Tuesley is a member of the Australian Institute of Mining and Metallurgy and is a shareholder and
Director of the Company. Mr Tuesley has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Tuesley consents to the
inclusion in this report of the matters based on this information in the form and context in which it
appears.
The information in this announcement that relates to Geophysical Results is based on information
compiled by Nigel Cantwell. Mr Cantwell is a Member of the Australian Institute of Geoscientists
(AIG). Mr Cantwell is a consultant to Culpeo Minerals Limited and he has sufficient experience which
is relevant to the style of mineralisation and type of deposit under consideration and to the activity
which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources & Ore Reserves.
The Company confirms that it is not aware of any new information or data that materially affects the
historical geophysical results included in the original report.
PAGE |8
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 JULY 2024
Appendix A: Culpeo Minerals Exploration Concessions as a t 30 June 2024
Project
Lana - Corina
Licence
San Agustin
Socavon
Lana Segunda
Corina
Laco 1 al 10
Sara 1 – 20
Patty 2 1 – 75
Patty 3 1 – 260
Patty 4 1 - 111
Petacas
Peta 31/55
Peta 91/92
Peta 15/28
La Rosa 27/28
La Rosa 31/46
La Rosa 1/30
Corredor 2, 1/12
Corredor 3, 1/6
Cachorro 1/20
Cachorro 1,1/160
Cachorro 2, 1/95
Cachorro 3, 1/24
Cachorro 4, 1/173
Cachorro 5, 1/87
Almudena 1,1
Amudena 2, 1/3
Almudena 3, 1/2
Almudena 4, 1/7
Almudena 5, 1/6
Almudena 6,1
Almudena 7,1
Almudena 8,1/4
San Sebastian
San Sebastian 1/16 (2/16)
San Sebastian 1/16 (1)
Fortuna
LA FLORIDA 1 a 20
LA FLORIDA II 1 al 20
PIEDRA DURA 1 a 20
EL QUILLAY 5A 1 al 17
EL QUILLAY 4A 1 al 25
Bastis 29CB 1 al 16
Bastis 29CB 17 al 20
LOS QUILLAYES 1/4 (3/4)
LA ESPERANZA 1/10
PRETECATEMO 1/20
Antares 1 al 165
MATILDE 2 1 al 50
El Quillay 2 1 al 224
El Quillay 3 1 al 236
El Quillay 4A 1 al 89
El Quillay 4B 1 al 40
El Quillay 5A 1
El Quillay 5C 1 al 98
El Quillay 6 1 al 13
El Quillay 6A 1 al 7
La Escondida 1-14
Company
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
Antofagasta Minerals
SCM Antares
SCM Antares
SCM Antares
Total – Lana Corina
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
Total – Las Petacas
Minera Panga SpA
Minera Panga SpA
Total – San Sebastian
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SLM La Escondida
Total – Fortuna
Area
(Ha)
1
1
1
1
10
90
75
260
111
550 Ha
120
10
70
6
80
300
12
6
20
160
95
242
173
87
1
3
2
7
6
1
1
4
1,406 Ha
45
5
50 Ha
100
100
96
17
25
127
35
10
50
100
165
200
224
236
89
40
1
98
13
7
42
1775 Ha
Grant
Expiry
Ownership
1951
None
50%
1951
None
50%
1951
None
50%
1951
None
50%
2015
None
50%
2006
None
50%
2019
None
50%
2019
None
50%
2019
None
50%
Note: Ownership Increased from 20% to 50%
During Reporting Period
11-Nov-89
None
66%
11-Nov-89
None
66%
06-Nov-89
None
66%
26-Dec-89
None
66%
28-Jun-11
None
66%
25-Nov-91
None
66%
18-Feb-15
None
66%
18-Feb-15
None
66%
11-Nov-14
None
66%
28-Jul-15
None
66%
18-Feb-15
None
66%
18-Feb-15
None
66%
18-Feb-15
None
66%
18-Feb-15
None
66%
22-May-15
None
66%
22-May-15
None
66%
22-May-15
None
66%
22-May-15
None
66%
22-May-15
None
66%
22-May-15
None
66%
22-May-15
None
66%
22-May-15
None
66%
1998
1998
None
None
100%
100%
2007
2010
2006
2011
2011
2011
2011
1984
1960
1953
2011
2011
2011
2011
2011
2011
2011
2011
2011
2011
2005
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
PAGE |8
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 31 JULY 2024
Appendix B
Technical Details
Copper Equivalent (Cu Eq) values: Assumed commodity prices for the calculation of Copper
Equivalent (Cu Eq) is Cu US$3.00/lb, Au US$1,700/oz, Mo US$14/lb and Ag US$20/oz. Recoveries are
assumed from similar deposits: Cu = 85%, Au = 65%, Ag = 65%, Mo = 80%, Cu Eq (%) was calculated
using the following formula: ((Cu% x Cu price 1% per tonne x Cu recovery) + (Au(g/t) x Au price per
g/t x Au recovery) + (Mo ppm x Mo price per g/t x Mo recovery) + Ag ppm x Ag price per g/t x Ag
recovery)) / (Cu price 1% per tonne x Cu recovery). Cu Eq (%) = Cu (%) + (0.54 x Au (g/t)) + (0.00037
x Mo (ppm)) + (0.0063 x Ag (ppm)). It is the Company’s opinion that all elements included in the
metal equivalents have a reasonable potential to be recovered and sold.
References
1
Refer to ASX announcement dated 19 June 2024 “Exceptional, High-Grade Copper Intersected at Lana Corina – 298m @ 0.98% CuEq”.
2
Refer to ASX announcement dated 10 July 2024 “Drill Results Extend Mineralisation at Lana Corina to 454m @ 0.93% CuEq”.
3
Refer to ASX announcement dated 27 May 2024 “High-Grade Copper Assay Results in Rock Chip Samples from Vista Montana”.
4
Refer to ASX announcement dated 9 April 2024 “Compelling IP Chargeability Target Defined at Fortuna”.
5
Refer to ASX announcement dated 4 October 2023 “Fortuna Copper Project tenure expanded by over 125%”.
6
Refer to ASX announcement dated 14 May 2024 “Reconnaissance Drilling Delivers Grades of up to 2.19% CuEq at Fortuna Project”.
7
Refer to ASX announcement dated 7 August 2023 “CPO Acquires Significant New Tenement Package”.
8
Refer to ASX announcement dated 11 September 2023 “High Priority El Quillay North Target Defined”.
9
Refer to ASX announcement dated 1 November 2023 “New High-Grade Cu and Au Trend at Fortuna”.
10
Refer to ASX announcement dated 12 December 2023 “Culpeo extends Piedra Dura Mineralisation”
11
Refer to ASX announcement dated 21 November 2023 “High-Grade Copper Trend Discovered”.
12
Refer to ASX announcement dated 4 January 2024 “Copper-Gold Porphyry System Identified at La Florida”.
13
Refer to ASX announcement dated 17 January 2024 “Drilling Returns Wide Copper Intersections (Replacement)”.
14
Refer to ASX announcement dated 29 February 2024 “High-Grade Surface Cu and Au Confirmed at El Quillay South”.
15
Refer to ASX announcement dated 21 March 2024 “Ownership Interest in Lana Corina Project Increased to 50%”.
16
Refer to ASX announcement dated 31 August 2022 “ Culpeo Minerals Strikes Critical Metals at Lana Corina”.
17
Refer to ASX announcement dated 8 March 2023 ” Geochemical Survey Completed at Lana Corina”.
18
Refer to ASX announcement dated 11 May 2022 “Culpeo intersects 257m @ 0.95% copper at Lana Corina”.
19
Refer to ASX announcement dated 6 June 2022 “Culpeo Minerals intersects 173m @ 1.05% copper”.
20
Refer to ASX announcement dated 23 November 2022 “Drilling intersects 169m @ 1.08% Cu grades up to 3.56% Cu”.
21
Refer to ASX announcement dated 2 May 2022 “Culpeo intersects 104m @ 0.74% copper at Lana Corina”.
22
Refer to ASX announcement dated 20 June 2022 “Multiple high-grade Cu intersections at Lana Corina Project”.
23
Refer to ASX announcement dated 3 April 2023 “Geochemical Survey Identifies Multiple Lana Corina Targets”.
24
Refer to ASX announcement dated 18 March 2024 “Culpeo Minerals Identifies New Target at Fortuna Project”.
PAGE |8
CULPEOMINERALS.COM.AU
Share your feedback
Discover