CPO Enters into Option Agreement to Acquire Jupiter Project
Released
Released
Announcement PDF
ASX ANNO UNCEMENT
14 APRIL 2025
ASX:CPO OTCQB:CPORF
CULPEO MINERALS ENTERS INTO STAGED OPTION
AGREEMENT TO ACQUIRE JUPITER PROJECT, CHILE
Culpeo Minerals Limited (Culpeo or the Company) (ASX:CPO, OTCQB:CPORF) is pleased to
announce it has entered into a binding staged option agreement with Excava Holdings SpA (Excava)
to acquire up to 100% of the highly prospective Jupiter Copper Project (Jupiter or the Project),
covering approximately 4,000ha in the low-altitude Coastal Cordillera region of Chile (refer Figure 1).
Previous surface exploration by Culpeo in 2024 identified two large zones of anomalous
mineralisation with grab samples returning grades of up to 4.33% copper and 3.24g/t gold.
This acquisition represents a strategic addition to Culpeo’s portfolio, further solidifying its position
as a leading copper explorer in Chile’s prolific coastal belt.
PROJECT HIGHLIGHTS
•
Large, greenfield, exploration tenement package of approximately 4,000ha.
•
Two large alteration zones prospective for copper and gold mineralisation identified, measuring
up to 5km long and 3km wide.
•
Culpeo’s due diligence surface sampling returned strong grades of up to 4.33% Cu and
3.24g/t Au with 13 samples returning >0.5% Cu.
•
Jupiter has potential to host stratabound (Manto) and Iron Oxide Copper Gold (IOCG) copper.
•
Region hosts numerous significant copper deposits including, Marimarca (Marimarca Copper
Corp), Mantos Blancos (Capstone Mining Corp), Michilla (Minera HMC S.A.) and Mantos de Luna
(Compañia Minera Mantos de la Luna S.A.).
•
Opportunistic acquisition with staged entry and low upfront capital requirements, strongly
aligned with strategy and complementary to the Company’s Lana Corina and Fortuna assets.
Commenting on the acquisition, Culpeo’s Executive Chairman, Geoff McNamara, said:
“Culpeo is delighted to have secured access to this under-explored Project within this highly prospective
mineralised belt. Early exploration undertaken as part of our due diligence has already identified two
large zones of high-grade copper and gold mineralisation, presenting an immediate focus for us to
pursue. The low-cost entry and staged ownership structure of the transaction allows for considered,
systematic exploration, while we continue exploration across our Lana Corina and Fortuna Projects.”
CULPEOMINERALS.COM.AU
info@culpeominerals.com.au
Level 39, 152-158 St Georges Terrace, Perth WA 6000
61 (8) 6383 7894
ASX ANNOUNCEMENT 14 APRIL 2025
Figure 1: Jupiter Project location map showing proximity to infrastructure, copper mines and the Coastal Copper
Belt (Jurassic Metallogenic Belt).
PAGE | 2
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 14 APRIL 2025
AN OPPORTUNISTIC ACQUISITION IN A PROLIFIC COPPER BELT
Jupiter represents a strategic acquisition that offers large-scale, high-grade copper exposure
potential in the Antofagasta Region of Chile. The concession package includes multiple small scale
mines (refer Figure 2). Two distinct zones of copper mineralisation have been identified with surface
samples returning grades up to 4.33% Cu and 3.24g/t Au. The acquisition structure has a minimal
upfront capital requirement and provides Culpeo with the option of increasing to 100% ownership
of the Project.
Figure 2: An example of one of several mines within the Jupiter Project area.
STRATEGIC IMPORTANCE AND GEOLOGICAL CONTEX T
Jupiter is located in the Coastal Cordillera Region of Antofagasta, Chile and is accessible by paved
roads 70km south of Antofagasta city (refer Figure 1 and 3).
The Project is complementary to Culpeo’s existing project interests and aligns with its strategy of
focussing on high-grade copper discoveries proximal to infrastructure within the Coastal Cordillera
of Chile. Jupiter offers near-term opportunity to define high-grade copper resources in a world-class
region, well supported by existing infrastructure.
PAGE | 3
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 14 APRIL 2025
Figure 3: Simplified regional geology showing main Jurassic La Negra formation and Jurassic to Cretaceous
intrusive units.
PAGE | 4
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 14 APRIL 2025
Jupiter spans 3,798 hectares across 18 concessions (Appendix B) within a region which hosts the
Marimaca, Mantos Blancos, Mantos de Luna, Michilla and Ivan copper deposits, all situated on the
same geological belt as the Jupiter tenement package.
CULPEO DUE DILIGENCE SAMPLING
Culpeo geologists conducted a 5-day field visit to validate and verify historic work during November
2024. A total of 37 surface rock chip and channel samples were collected and submitted to ALS
Laboratories for analysis of Cu, Au, Ag and Mo to validate historical sampling results.
First pass mapping confirmed the previously identified large, continuous zones of alteration
consisting of epidote, silica and calcite, with alteration being strongly coincident with copper
mineralisation (refer Figure 4). These alteration zones are up to 5km long and 3km wide.
Alteration and associated copper mineralisation appear to be strongly controlled by several
northwest trending fault systems which may act as possible controls on alteration and copper
mineralisation.
Strong copper results included 13 samples reporting over 0.50% copper, with a highest result
of 4.33% Cu with the same sample also returning 3.24g/t Au.
Full results are presented in Appendix A.
KEY TRANSACTION TERMS
The acquisition has been structured as a farm-in option arrangement, wherein Excava Holdings SpA
(Excava), a private capital mining exploration vehicle located in Chile, will transfer the Jupiter Project
concessions into a special purpose vehicle (SPV). Culpeo has the option to acquire staged interests
in the SPV, subject to meeting exploration and payment milestones. This structure enables
accelerated ownership, ensures operational efficiency, and provides clear delineation of ownership
rights.
Financial terms include:
•
Initial Payment: US$40,000 within five business days of executing the binding agreement.
•
Year 1: US$80,000 on the first anniversary of the execution date.
•
Year 2: US$200,000 on the second anniversary, subject to completion of 2,000m of drilling.
•
Year 3: US$300,000 on the third anniversary, with Culpeo earning a 51% interest in the
Project, subject to completion of 2,000m of drilling.
•
Year 4: US$380,000 on the fourth anniversary.
•
Year 5: US$1,000,000 on the fifth anniversary, with Culpeo acquiring an additional 29%
interest (totalling 80%) subject to completing an additional 2,000m of drilling.
PAGE | 5
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 14 APRIL 2025
Figure 4: Jupiter Project location map showing Culpeo sample locations. Pink denotes samples >1.50% Cu,
mapped alteration zones in orange and mineralised faults in black. Jupiter Project concessions shown by red
outline.
•
Feasibility Study: US$1,100,000 upon announcing a positive feasibility study at the Project
under the JORC Code concluding that extraction is reasonably justified (economically
mineable), securing 100% ownership of the Project.
PAGE | 6
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 14 APRIL 2025
Upon achieving 100% ownership of Jupiter, Culpeo will pay Excava a 2% net smelter return royalty,
on revenue generated from production at the Project, capped at US$2,500,000. Culpeo retains the
right to withdraw from the agreement at no cost and can extend payment deadlines by up to 12
months at any stage following the execution date up until the Company’s acquisition of an 80%
interest.
The option arrangement is otherwise on terms considered standard for a transaction of this nature.
The Company has received confirmation from ASX that Listing Rules 11.1.2 and 11.1.3 do not apply
to the proposed acquisition of the Project.
COMPANY OUTLOOK
Culpeo remains committed to delivering value through active drill testing at its Lana Corina and
Fortuna Projects, where the potential to delineate a linked, 3km mineralised system remains the
primary focus of exploration activities.
Following completion of the Jupiter transaction, the Company will commence exploration at Jupiter
during Q2 2025 which will include:
•
District scale geological mapping;
•
Regional litho-geochemical surveys; and
•
Ground-based geophysical surveys.
This announcement has been authorised by the Board of Directors of Culpeo Minerals Limited.
COMPANY CONTACT
Geoff McNamara
Interim Executive Chairman
E: geoff.mcnamara@culpeominerals.com.au
P: +61 (08) 6383 7894
PAGE | 7
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 14 APRIL 2025
ABOUT CULPEO MINERALS LIMITED
Culpeo Minerals Limited is committed to copper exploration and development, with strategic
investments in Chile, a leading global copper producer. Focusing on high-grade copper systems in
Chile's infrastructure laden Coastal Cordillera. The Company has recently announced a significant
copper and molybdenum discovery at Lana Corina and acquired the promising Fortuna Project.
Both projects are located in Chile's Coquimbo region, renowned for its numerous world-class copper
and gold mines. These project areas feature significant outcropping high-grade copper deposits, and
the region's infrastructure includes access roads, power lines, water sources, and local settlements,
all of which are essential for, and help facilitate economic mining activities.
PAGE | 8
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 14 APRIL 2025
COMPETENT PERSONS STATEMENTS
The information in this report that relates to Exploration Results is based on information compiled
by Mr Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of
the Australian Institute of Geoscientists and a Director and shareholder of the Company. Mr Reeves
has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined
in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Mr Reeves consents to the inclusion in this report of the matters based on this
information in the form and context in which it appears.
FORWARD-LOOKING STATEMENTS
The information contained in this release is not investment or financial product advice and is not
intended to be used as the basis for making an investment decision. Please note that, in providing
this release, the Company has not considered the objectives, financial position or needs of any
particular recipient. The information contained in this release is not a substitute for detailed
investigation or analysis of any particular issue and does not purport to be all of the information that
a person would need to make an assessment of the Company or its assets. Current and potential
investors should seek independent advice before making any investment decisions in regard to the
Company or its activities.
This announcement includes “forward-looking statements” within the meaning of securities laws of
applicable jurisdictions. Forward-looking statements can generally be identified by the use of the
words “anticipate”, “believe”, “expect”, “project”, “forecast”, “estimate”, “likely”, “intend”, “should”,
“could”, “may”, “target”, “plan”, “guidance” and other similar expressions. Indications of, and
guidance on, future earning or dividends and financial position and performance are also forwardlooking statements. Such forward-looking statements involve known and unknown risks,
uncertainties, assumptions and other important factors, many of which are beyond the control of the
Company, and which may cause actual results, performance or achievements to differ materially from
those expressed or implied by such statements.
Forward-looking statements are provided as a general guide only, and should not be relied on as an
indication or guarantee of future performance. Given these uncertainties, recipients are cautioned to
not place undue reliance on any forward-looking statement. Subject to any continuing obligations
under applicable law the Company disclaims any obligation or undertaking to disseminate any
updates or revisions to any forward-looking statements in this document to reflect any change in
expectations in relation to any forward-looking statements or any change in events, conditions or
circumstances on which any such statement is based.
This announcement is not, and does not constitute, an offer to sell or the solicitation, invitation or
recommendation to purchase any securities and neither this announcement nor anything contained
in it forms the basis of any contract or commitment.
PAGE | 9
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 14 APRIL 2025
APPENDIX A: CULPEO DUE DILIGENCE SAMPLE RESULTS AND LOCATIONS.
Sample ID Sector UTM_E UTM_N Projection width (m) Au ppm Cu_% Mo_% Ag_ppm
TRC190611 North 348932 7322791 PSAD56
3.00
0.02 0.04 0.00 <1
TRC190612 North 348928 7322788 PSAD56
3.00
0.05 0.05 0.00 <1
TRC190613 North 348923 7322784 PSAD56
3.00
0.03 0.03 0.00 <1
TRC190614 North 348918 7322769 PSAD56
3.00
0.04 0.09 0.00 <1
TRC190615 North 348138 7322718 PSAD56
3.00
0.03 0.22 0.00 <1
TRC190616 North 348152 7322717 PSAD56
2.00
0.03 0.17 0.00 <1
TRC190617 North 348161 7322721 PSAD56
3.00
0.01 0.08 0.00 <1
TRC190618 North 348023 7322781 PSAD56
3.00
0.01 0.21 0.00 <1
TRC190619 North 348020 7322776 PSAD56
3.00
0.01 0.15 0.00 <1
TRC190620 North 348019 7322769 PSAD56
3.00
0.13 1.70 0.00 1
TRC190624 South 350447 7314379 PSAD56
3.00
0.00 0.01 0.00 <1
TRC190625 South 350310 7314495 PSAD56
1.00
0.00 0.05 0.00 <1
TRC190626 South 349580 7314474 PSAD56
3.00
0.02 0.39 0.00 1
TRC190627 South 349407 7314426 PSAD56
1.00
0.08 1.70 0.00 3
TRC190628 North 348100 7322239 PSAD56
1.00
0.01 0.01 0.00 1
TRC190629 North 348335 7321791 PSAD56
1.00
3.24 4.33 0.01 1
TRC190630 North 348389 7321732 PSAD56
1.00
0.06 1.71 0.00 <1
TRC190631 North 347909 7321723 PSAD56
2.00
0.60 3.91 0.01 <1
TRC190632 North 347912 7321726 PSAD56
2.00
0.13 3.60 0.01 <1
TRC190633 North 347551 7321549 PSAD56
1.00
0.01 0.03 0.00 <1
TRC190634 North 348308 7321606 PSAD56
1.00
0.70 1.61 0.00 1
TRC190635 North 348586 7321981 PSAD56
1.00
0.21 0.79 0.00 <1
TRC190636 North 351099 7319618 PSAD56
2.00
0.03 0.01 0.00 <1
TRC190637 North 351321 7319862 PSAD56
1.00
0.00 0.01 0.00 <1
TRC190638 North 351256 7320139 PSAD56
1.00
1.02 1.16 0.00 <1
TRC190641 North 349652 7320712 PSAD56
1.00
0.03 1.42 0.00 2
TRC190642 North 349698 7320741 PSAD56
1.00
0.01 2.43 0.00 1
TRC190643 North 349403 7320299 PSAD56
1.00
0.00 0.04 0.00 <1
TRC190644 North 349402 7320099 PSAD56
1.00
0.00 0.06 0.00 <1
TRC190645 North 349407 7319902 PSAD56
1.00
0.01 0.22 0.00 <1
TRC190646 North 349602 7320099 PSAD56
1.00
0.01 0.02 0.00 <1
TRC190648 South 349399 7314471 PSAD56
1.00
0.08 4.14 0.00 19
TRC190649 South 349144 7314765 PSAD56
1.00
0.00 0.01 0.00 <1
TRC190650 South 348982 7314643 PSAD56
1.00
0.00 0.01 0.00 <1
TRC190651 South 348689 7314571 PSAD56
2.00
0.01 0.01 0.00 <1
TRC190652 South 348320 7314453 PSAD56
2.00
0.00 0.00 0.00 <1
TRC190653 South 346886 7314583 PSAD56
1.00
0.12 3.33 0.00 <1
PAGE | 10
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 14 APRIL 2025
APPENDIX B: JUPITER PROJECT CONCESSIONS COMPRISING 1 9 CONTIGUOUS
EXPLORATION CL AIMS COVERING A TOTAL AREA OF 4, 000 HECTARES, WITH
PREFERENTIAL EXPLOITATION CL AIMS OVER AN AREA OF 3,798 HECTARES
Licence
Area (Ha)
Grant
Expiry
Ownership
Jupiter 1
200
30/09/2022
18/07/2026
0%
Jupiter 2
200
10/07/2022
25/04/2027
0%
Jupiter 3
200
30/09/2022
22/06/2026
0%
Jupiter 4
200
30/09/2023
28/06/2027
0%
Jupiter 5
100
9/12/2022
1/09/2026
0%
Jupiter 6
200
10/07/2023
30/03/2026
0%
Jupiter 7
200
30/09/2022
29/06/2026
0%
Jupiter 8
300
12/07/2023
4/05/2027
0%
Jupiter 9
200
30/09/2022
22/06/2026
0%
Jupiter 10
200
10/07/2023
25/04/2027
0%
Jupiter 11
200
9/12/2022
1/09/2026
0%
Jupiter 12
300
9/09/2022
29/06/2026
0%
Jupiter 13
300
9/09/2022
29/06/2026
0%
Jupiter 14
200
20/09/2023
27/06/2027
0%
Jupiter 15
200
30/09/2022
22/06/2026
0%
Jupiter 16
300
9/12/2022
1/09/2026
0%
Jupiter 17
300
30/12/2022
29/06/2026
0%
Jupiter 18
200
10/07/2023
30/03/2026
0%
PAGE | 11
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 14 APRIL 2025
APPENDIX C: JORC CODE TABLE 1 – JUPITER PROJECT
SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under investigation,
such as down-hole gamma sondes, or handheld
XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of
sampling.
• In 2024, 37 random rock chip
samples were taken at Jupiter, and
these samples were delivered to
ALS laboratories in Chile for
analysis of Cu, Au, Ag and Mo. Au
was analysed using a 50g fire assay,
CU, Ag and Mo were analysed
using a 4 acid digest and AA finish.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
• In 2021, 11 samples were collected
and analysed using Atomic
Absorption Spectroscopy with
standard 4-acid digestion.
Aspects of the determination of mineralisation
that are material to the Public Report. In cases
where ‘industry standard’ work has been done,
this would be relatively simple (e.g. ‘reverse
circulation’ drilling was used to obtain 1m
samples from which 3kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
• In 2014, 117 soil samples were
collected and analysed by 36element Inductively-CoupledPlasma Mass Spectrometry analysis.
Drilling
techniques
Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter, triple
or standard tube, depth of diamond tails, facesampling bit, or other type, whether core is
oriented and if so, by what method, etc.).
• Not applicable as rock chip sample
program only.
Drill sample
recovery
Method of recording and assessing core and
chip sample recoveries and results assessed.
• Not applicable as rock chip sample
program only.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Samples were logged for lithology,
alteration and mineralisation style.
PAGE | 12
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 14 APRIL 2025
Criteria
JORC Code explanation
Commentary
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc.)
photography.
The total length and percentage of the relevant
intersections logged.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
• Culpeo’s sampling is subject to the
company’s QAQC procedures.
If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet or
dry.
• The sample preparation of crushing
half and pulverisation is considered
to provide an appropriate and
representative sample for analysis.
For all sample types, the nature, quality, and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Samples were logged by a qualified
geoscientist. Each subsample is
considered to be representative of
the in-situ material
• Sample sizes collected were
considered appropriate to
reasonably represent the material
being tested.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
Quality of
assay data and
laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• Assays reported in this report were
undertaken at the accredited
laboratory of ALS Santiago, which
is fully certified.
For geophysical tools, spectrometers, handheld
XRF instruments, etc., the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
• The assay techniques used are
considered appropriate for the
elements analysed for.
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
• For the current program standards,
blanks were regularly inserted in
sample batches and monitored as
part of the Company’s QAQC
procedure.
• There is no QAQC information
available for historic samples.
• Company geologists have verified
the visible copper mineralisation
present in outcrop and in
stockpiles at the project site.
• All logging and sampling are
undertaken using the company’s
procedure manual and chain of
custody protocols.
• Data is digitally entered and stored
following documented core
handling protocols. The protocols
PAGE | 13
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 14 APRIL 2025
Criteria
JORC Code explanation
Commentary
are considered adequate.
Location of
data points
Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• For the current program sample
locations were located using a
hand-held GPS unit.
Specification of the grid system used.
Data spacing
and
distribution
Quality and adequacy of topographic control.
Data spacing for reporting of exploration
results.
• Not applicable as rock chip sample
program only.
Whether the data spacing, and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been applied.
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
• Samples collected were selective in
nature and maybe biased.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Sample
security
The measures taken to ensure sample security.
Audits or
reviews
The results of any audits or reviews of sampling
techniques and data.
• No records available for the historic
samples.
• For the current program, samples
are delivered to the laboratory
using the Company’s chain of
custody procedure.
• No records are available for the
historic sampling, but it is assumed
no audits have been completed.
PAGE | 14
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 14 APRIL 2025
SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The Jupiter Project area
comprises eighteen
concessions covering a total
area of approximately 4,00
hectares. Culpeo Minerals has
agreements in place to earn up
to 100%.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Exploration done
by other parties
Acknowledgment and appraisal of exploration
by other parties.
• The concessions have been
granted and there are no
known impediments to
obtaining a licence to operate
in the area.
• In 2023, a field reconnaissance
and sampling program was
completed by Excava Holdings
SpA.
• In 2021, a reconnaissance
campaign collected 11
samples, was completed by
Excava Holdings SpA.
• In 2014, 117 soil samples were
collected across a north-south
and east-west oriented grid by
Excava Holdings SpA.
Geology
Deposit type, geological setting, and style of
mineralisation.
• Jupiter has potential to host
stratabound (manto) and Iron
Oxide Copper Gold (IOCG)
copper and gold mineralisation
and occurs within the La Negra
Formation (LNF).
Drill hole
information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
• Not applicable as rock chip
sample program only.
• easting and northing of the drill hole collar
• elevation or RL (elevation above sea level in
metres) of the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
hole length
Data aggregation
methods
In reporting exploration results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually material
and should be stated.
• Only raw assay results have
been reported.
PAGE | 15
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 14 APRIL 2025
Criteria
JORC Code explanation
Commentary
Relationship
between
mineralisation
widths and
intercept lengths
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• Not applicable as rock chip
sample program only.
Diagrams
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported. These
should include, but not be limited to, a plan
view of drill hole collar locations and
appropriate sectional views.
• Diagrams are included in the
main body of the report.
Balanced
reporting
Where comprehensive reporting of all
exploration results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of exploration
results.
• Results have been reported for
the main elements targeted
(Cu, Ag, Au, and Mo) as set out
in Appendix A. All sample
locations are reported for
context.
Other substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
•
Further work
The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
• District scale geological
mapping.
If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length,
true width not known’).
Not applicable as rock chip
sample program only.
• Systematic rock-chip sampling.
• Geophysics.
• Diamond drilling.
PAGE | 16
CULPEOMINERALS.COM.AU
Share your feedback
Discover