QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDED 31 DECEMBER 2025
Culpeo Minerals Limited (Culpeo or the Company) (ASX: CPO, OTCQB: CPORF) is pleased to report
on its activities for the quarter ended 31 December 2025 (the Quarter).
ACTIVITY HIGHLIGHTS
FORTUNA PROJECT
• Maiden drilling at La Florida delivered multiple zones of high-grade, near-surface copper
mineralisation¹.
• Results confirmed a porphyry-style copper system within a 1.7km by 500m corridor1
.
• Notable intercepts included¹:
• 6.65m at 1.03% Cu from 14.00m (CMLFD002); including
• 4.40m at 1.44% Cu from 15.00m
• 13.60m at 0.88% Cu from 4.00m (CMLFD005); including
• 6.10m at 1.35% Cu from 10.00m
• 16.00m at 0.70% Cu from 107.00m (CMLFD005); including
• 7.47m at 1.36% Cu from 115.00m
• 1.95m at 3.49% Cu from 121.50m
• 0.49m at 4.19% Cu from 121.50m
LANA CORINA PROJECT
• Upcoming high-impact drilling programmes fully funded following successful A$3 million
placement announced during the Quarter2
.
• Planning is now complete for the maiden programme at Vista Montana, now scheduled to
commence in Q1 CY2026, pending finalisation of land access agreements.
CORPORATE
• General Meeting of Shareholders was held on 27 January 2026, with all resolutions duly passed.
• Ms Stanton-Cook transitioned to sole Company Secretary effective 4 December 2025.4
• Cash and cash equivalents at Quarter end of A$2.0 million and zero debt.
• Settlement of the second tranche of the November 2025 equity capital raise anticipated on 3
February 2026, increasing Culpeo’s cash position by A$1.6 million (before costs).
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JANUARY 2025
PAGE |2
Figure 1: Culpeo Minerals primary project areas, located approximately 350km north of Santiago, Chile.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JANUARY 2025
PAGE |3
ACTIVITY DETAIL
FORTUNA PROJECT
The Fortuna Project is located approximately 360km north of the Chilean capital Santiago, and 10km
north of Culpeo’s complementary Lana Corina Project. Fortuna hosts numerous historical, small-scale
workings that target near-surface, high-grade mineralisation (Figure 2). The Project area lies within
the Coastal Cordillera, a prolific porphyry belt that hosts multiple major copper deposits.
Figure 2: Culpeo Minerals primary project areas, with significant drilling and trenching results1
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JANUARY 2025
PAGE |4
La Florida Prospect
During the Quarter, Culpeo reported results from its maiden eight-hole diamond drilling programme
at Fortuna’s La Florida Prospect¹. This programme represented the first drilling completed at the
target, with assay results confirming the successful intersection of multiple zones of high-grade,
near-surface copper mineralisation and validating the presence of a copper-bearing, porphyry-style
system¹.
La Florida hosts numerous historical small-scale workings that target near-surface copper
mineralisation and was identified as a high-priority drill target based on surface mapping, trenching,
and geophysical interpretation.
The maiden drilling programme was designed to test multiple zones of high-grade copper
mineralisation within an approximately 1.7km by 500m structural corridor. During the Quarter, assay
results were received for all eight diamond drillholes, with four returning significant high-grade
copper intercepts and associated silver mineralisation, with silver grades of up to 5.19g/t Ag¹.
Significant intercepts included¹:
• 6.65m at 1.03% Cu from 14.00m in hole CMLFD002; including
• 4.40m at 1.44% Cu from 15.00m; and
• 1.90m at 0.88% Cu from 65.50m;
• 13.60m at 0.88% Cu from 4.00m in hole CMLFD005; including
• 6.10m at 1.35% Cu from 10.00m; and
• 16.00m at 0.70% Cu from 107.00m in hole CMLFD005; including
• 7.47m at 1.36% Cu from 115.00m; and
• 1.95m at 3.49% Cu from 121.50m; and
• 0.49m at 4.19% Cu from 121.50m;
• 1.00m at 1.37% Cu from 76.00m in hole CMLFD006; and
• 3.00m at 0.61% Cu from 49.60m in hole CMLFD008; including
• 0.50m at 1.84% Cu from 51.00m.
Intersected mineralisation is characterised by porphyry-style veining, alteration, and elevated copper
and silver geochemistry. The mineralised system is hosted in lithologies comparable to those
observed at the Company’s nearby Lana Corina Project, supporting the interpretation of a regionally
significant porphyry system¹.
Figure 3 illustrates a schematic interpretation of a porphyry system, with the green shaded areas
representing the interpreted zones intersected during the campaign. The distribution of
mineralisation across multiple drill sections highlights the strong prospectivity of the La Florida
corridor and indicates vectors that warrant systematic follow-up drilling along strike and at depth.
The results are considered extremely encouraging and provide important data to guide the next
phase of exploration¹.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JANUARY 2025
PAGE |5
Figure 3: Schematic interpretation of a porphyry system, the green shaded areas showing the interpreted zones
intersected in the current round of drilling1
.
Lana Corina Project
Preparations are complete for a fully funded 4,000m maiden diamond drilling programme at Vista
Montana, with drilling now expected to commence Q1 CY26 pending finalisation of requisite land
access agreements.
The programme has been primarily designed to test the potential 3km mineralised trend linking Lana
Corina to Vista Montana.
The high-priority Vista Montana Copper Prospect is located approximately 1km north-east of the
Lana Corina discovery, where prior drilling intersected a wide zone of 454m @ 0.93% CuEq. The
upcoming programme is currently scheduled to commence in Q1 2026 and will follow up on the
Company’s prior successful drilling campaigns, which have defined a robust copper system across
the Lana Corina-Vista Montana corridor.
Follow-up drilling is planned at Lana Corina, with an accelerating programme of exploration across
the Company’s highly prospective concession packages in advanced stages of planning.2
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JANUARY 2025
PAGE |6
CORPORATE ACTIVITY
Exploration Funding
In November 2025, Culpeo secured binding commitments to raise approximately A$3.0 million via
a two-tranche placement of Ordinary Shares to sophisticated and professional investors2
.
Funds raised are to be applied to the Vista Montana drilling programme, follow-up work at Lana
Corina, and other copper exploration across the Company’s highly prospective concession package.
Jupiter Option Agreement
On 14 April 2025, Culpeo announced it had entered into a binding staged Option Agreement with
Excava Holdings SpA (Excava) to acquire up to 100% of the Jupiter Copper Project (Jupiter). The
acquisition was structured as a farm-in option arrangement, providing Culpeo with the option to
earn staged interests in Jupiter subject to meeting exploration and payment milestones.
Upon completion of field exploration activities, the Company elected to terminate the option
arrangement prior to the first anniversary and second potential payment milestone.
The Company incurred approximately A$107,000 in acquisition and exploration expenditure
associated with Jupiter, which will be expensed in the Company’s financial accounts. Culpeo retains
no interest in tenure associated with the Project.
Change of Share Registry
On 21 November 2025, Culpeo announced that it was changing its shareholder registry services to
Automic Pty Ltd, effective 24 November 2025.3
Company Secretary Appointment
On 4 December 2025, Ms Michaela Stanton-Cook assumed the role of sole Company Secretary, with
Ms Sue Wong stepping down from her position as Joint Company Secretary 4
.
Results of General Meeting
A General Meeting of Shareholders was held on 27 January 2026, with all resolutions, including
issuance of the second tranche of placement securities, passed by the requisite majority.
Cash Position at Quarter End
Cash and cash equivalents at Quarter end of A$2.0 million and zero debt. Settlement of the second
tranche of the November 2025 equity capital raise is anticipated on 3 February 2026, increasing
Culpeo’s cash position by A$1.6 million (before capital raising costs).
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JANUARY 2025
PAGE |7
Payment for exploration and evaluation expenditure
The Company’s exploration and evaluation expenditure for the Quarter was A$233,000 and primarily
incurred at its La Florida Prospect, and included payments for labour and consultants, vehicle hire,
and assays.
Payments to Related Parties
Payments made during the Quarter, as outlined in the Appendix 5B, included approximately
A$118,000 for director fees and consulting services provided by the Company’s key management
personnel.
This announcement has been authorised by the Board of Directors of Culpeo Minerals Limited.
CONTACT
Geoff McNamara
Interim Executive Chairman
E: geoff.mcnamara@culpeominerals.com.au
P: +61 (08) 6383 7894
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JANUARY 2025
PAGE |8
ABOUT CULPEO MINERALS LIMITED
Culpeo Minerals Limited is a copper-focused exploration and development company with a strategic portfolio
of high-quality assets located in Chile, the world’s leading copper-producing jurisdiction. The Company is
targeting high-grade copper systems within Chile’s infrastructure-rich Coastal Cordillera, a proven belt hosting
multiple major copper deposits.
Culpeo has delivered a significant copper and molybdenum discovery at the Lana Corina Project and continues
to systematically advance its highly prospective Fortuna Project. These assets form the basis of a focused
growth and discovery strategy aiming at unlocking district-scale potential through disciplined exploration and
staged project advancement.
The Lana Corina and Fortuna Projects are located in Chile’s Coquimbo Region, approximately 350 kilometres
north of Santiago, in proximity to the world-class Los Pelambres mine. Both projects host extensive
outcropping copper mineralisation and are situated in areas supported by well-developed infrastructure,
including road access, power transmission, water availability and a skilled local mining workforce - factors
critical in enabling cost-effective and efficient development
The Company is led by a highly experienced Board and management team with a strong track record of
exploration success and operational delivery in Chile. Culpeo’s strategy is centred on creating shareholder value
through the discovery and development of high-grade, near-surface copper systems in a tier one mining
jurisdiction, supported by a clear pathway to development and scalability.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JANUARY 2025
PAGE |9
COMPETENT PERSONS’ STATEMENTS
The information in this report that relates to Exploration Results is based on information compiled by Mr
Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian
Institute of Geoscientists and a Director and shareholder of the Company. Mr Reeves has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion in
this report of the matter based on this information in the form and context in which it appears.
The information in this announcement that relates to the historic Exploration Results as listed in the table below
is based on, and fairly represents, information and supporting documentation prepared by the Competent
Person whose name appears in the same row, who is a Director or shareholder of or independent consultant
to the Company and is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM), Australian
Institute of Geoscientists (AIG), Australian Society of Exploration Geophysics (ASEG), or a Recognised
Professional Organisation (RPO). Each person named in the table below has sufficient experience which is
relevant to the style of mineralisation and types of deposits under consideration and to the activity which he
has undertaken to quality as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves.
Activity Competent Person Membership Status
Exploration Results (until 31 Oct 2024) Mr Maxwell Tuesley (Shareholder and former Director) AusIMM Member
Exploration Results (after 31 Oct 2024) Mr Zeffron Reeves (Director and Shareholder) AIG Member
The information relating to historic Exploration Results in this announcement, or as otherwise noted in this
announcement, is available from the Company’s website at www.culpeominerals.com.au or on the ASX website
www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially
affects the Exploration Results and Geophysical Results information included in previous announcements. The
Company confirms that the form and context in which the applicable Competent Persons’ findings are
presented have not been materially modified from the previous announcements.
FORWARD-LOOKING STATEMENTS
This document may include forward-looking statements. Forward-looking statements include, but are not
limited to, statements concerning Culpeo Minerals Limited’s planned exploration programme and other
statements that are not historical facts. When used in this document, the words such as "could," "plan,"
"estimate," "expect," "intend," "may”, "potential," "should," and similar expressions are forward-looking
statements. Although Culpeo Minerals Limited believes that its expectations reflected in these forward-looking
statements are reasonable, such statements involve risks and uncertainties, and no assurance can be given that
actual results will be consistent with these forward-looking statements.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JANUARY 2025
PAGE |10
Appendix A: Culpeo Minerals Exploration Concessions at 31 December 2025
Project Licence Company Area (Ha) Grant Expiry Ownership
Lana – Corina San Agustin SCM Antares 1 1951 None 50%
Socavon SCM Antares 1 1951 None 50%
Lana Segunda SCM Antares 1 1951 None 50%
Corina SCM Antares 1 1951 None 50%
Laco 1 al 10 SCM Antares 10 2015 None 50%
Sara 1 – 20 Antofagasta Minerals 90 2006 None 50%
Patty 2 1 – 75 SCM Antares 75 2019 None 50%
Patty 3 1 – 260 SCM Antares 260 2019 None 50%
Patty 4 1 - 111 SCM Antares 111 2019 None 50%
Total – Lana Corina 550 Ha
Petacas Peta 31/55 EM DOS 120 11-Nov-89 None 66%
Peta 91/92 EM DOS 10 11-Nov-89 None 66%
Peta 15/28 EM DOS 70 06-Nov-89 None 66%
La Rosa 27/28 EM DOS 6 26-Dec-89 None 66%
La Rosa 31/46 EM DOS 80 28-Jun-11 None 66%
La Rosa 1/30 EM DOS 300 25-Nov-91 None 66%
Corredor 2, 1/12 EM DOS 12 18-Feb-15 None 66%
Corredor 3, 1/6 EM DOS 6 18-Feb-15 None 66%
Cachorro 1/20 EM DOS 20 11-Nov-14 None 66%
Cachorro 1,1/160 EM DOS 160 28-Jul-15 None 66%
Cachorro 2, 1/95 EM DOS 95 18-Feb-15 None 66%
Cachorro 3, 1/24 EM DOS 242 18-Feb-15 None 66%
Cachorro 4, 1/173 EM DOS 173 18-Feb-15 None 66%
Cachorro 5, 1/87 EM DOS 87 18-Feb-15 None 66%
Almudena 1,1 EM DOS 1 22-May-15 None 66%
Amudena 2, 1/3 EM DOS 3 22-May-15 None 66%
Almudena 3, 1/2 EM DOS 2 22-May-15 None 66%
Almudena 4, 1/7 EM DOS 7 22-May-15 None 66%
Almudena 5, 1/6 EM DOS 6 22-May-15 None 66%
Almudena 6,1 EM DOS 1 22-May-15 None 66%
Almudena 7,1 EM DOS 1 22-May-15 None 66%
Almudena 8,1/4 EM DOS 4 22-May-15 None 66%
Total – Las Petacas 1,406 Ha
San Sebastian San Sebastian 1/16 (2/16) Minera Panga SpA 45 1998 None 100%
San Sebastian 1/16 (1) Minera Panga SpA 5 1998 None 100%
Total – San Sebastian 50 Ha
Fortuna LA FLORIDA 1 a 20 SCM Antares 100 2007 None 80%
LA FLORIDA II 1 al 20 SCM Antares 100 2010 None 80%
PIEDRA DURA 1 a 20 SCM Antares 96 2006 None 80%
EL QUILLAY 5A 1 al 17 SCM Antares 17 2011 None 80%
EL QUILLAY 4A 1 al 25 SCM Antares 25 2011 None 80%
Bastis 29CB 1 al 16 SCM Antares 127 2011 None 80%
Bastis 29CB 17 al 20 SCM Antares 35 2011 None 80%
LOS QUILLAYES 1/4 (3/4) SCM Antares 10 1984 None 80%
LA ESPERANZA 1/10 SCM Antares 50 1960 None 80%
PRETECATEMO 1/20 SCM Antares 100 1953 None 80%
Antares 1 al 165 SCM Antares 165 2011 None 80%
MATILDE 2 1 al 50 SCM Antares 200 2011 None 80%
El Quillay 2 1 al 224 SCM Antares 224 2011 None 80%
El Quillay 3 1 al 236 SCM Antares 236 2011 None 80%
El Quillay 4A 1 al 89 SCM Antares 89 2011 None 80%
El Quillay 4B 1 al 40 SCM Antares 40 2011 None 80%
El Quillay 5A 1 SCM Antares 1 2011 None 80%
El Quillay 5C 1 al 98 SCM Antares 98 2011 None 80%
El Quillay 6 1 al 13 SCM Antares 13 2011 None 80%
El Quillay 6A 1 al 7 SCM Antares 7 2011 None 80%
La Escondida 1-14 SLM La Escondida 42 2005 None 80%
FLORIDA 1 Culpeo Mining Chile Spa 300 02/05/2024 15/03/2026 100%
FLORIDA 10 Culpeo Mining Chile Spa 300 02/05/2024 15/03/2026 100%
FLORIDA 11 Culpeo Mining Chile Spa 300 02/05/2024 15/03/2026 100%
FLORIDA 12 Culpeo Mining Chile Spa 300 02/05/2024 15/03/2026 100%
FLORIDA 2 Culpeo Mining Chile Spa 300 02/05/2024 15/03/2026 100%
FLORIDA 3 Culpeo Mining Chile Spa 300 02/05/2024 21/02/2026 100%
FLORIDA 4 Culpeo Mining Chile Spa 300 02/05/2024 21/02/2026 100%
FLORIDA 5 Culpeo Mining Chile Spa 300 02/05/2024 13/02/2026 100%
FLORIDA 6 Culpeo Mining Chile Spa 300 02/05/2024 13/02/2026 100%
FLORIDA 7 Culpeo Mining Chile Spa 300 02/05/2024 14/02/2026 100%
FLORIDA 8 Culpeo Mining Chile Spa 300 02/05/2024 14/02/2026 100%
FLORIDA 9 Culpeo Mining Chile Spa 300 02/05/2024 20/02/2026 100%
Total – Fortuna 5,375 Ha
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 JANUARY 2025
PAGE |11
Appendix B: Technical Details
Copper Equivalent (CuEq) values: Assumed commodity prices for the calculation of CuEq is Cu
US$3.00/lb, Au US$1,700/oz, Mo US$14/lb and Ag US$20/oz. Recoveries are assumed from similar
deposits: Cu = 85%, Au = 65%, Ag = 65%, Mo = 80%, Cu Eq (%) was calculated using the following
formula: ((Cu% x Cu price 1% per tonne x Cu recovery) + (Au(g/t) x Au price per g/t x Au recovery) +
(Mo ppm x Mo price per g/t x Mo recovery) + Ag ppm x Ag price per g/t x Ag recovery)) / (Cu price
1% per tonne x Cu recovery). Cu Eq (%) = Cu (%) + (0.54 x Au (g/t)) + (0.00037 x Mo (ppm)) + (0.0063
x Ag (ppm)). It is the Company’s opinion that all elements included in the metal equivalents have a
reasonable potential to be recovered and sold.
Appendix C: References
1.
Refer to ASX announcement dated 07 October 2025 “High Grade Near Surface Copper Intersected at La Florida”.
2.
Refer to ASX announcement dated 27 November 2025 “Culpeo Secures $3M to Drill High Priority Copper Targets”.
3.
Refer to ASX announcement dated 21 November 2025 “CPO Change of Share Registry”.
4.
Refer to ASX announcement dated 04 December 2025 “Resignation of Company Secretary & Change of Details”.
5.
Refer to ASX announcement dated 22 December 2025 “Notice of General Meeting/Proxy Form”.