IMARC Conference Presentation
Released
Released
Announcement PDF
ASX: CPO | OTCID: CPORF
FOCUSED CHILEAN
COPPER EXPLORATION
TARGETING LARGE-SCALE, HIGH-
GRADE NEW DISCOVERIES IN THE
LAND OF THE COPPER GIANTS
OCTOBER 2026
Investor Presentation 2
DISCLAIMER AND IMPORTANT INFORMATION
This Presentation and any accompanying verbal Presentation (together the Presentation) has been prepared by Culpeo Minerals Limited (Culpeo or the Company) and approved by the
Non-Executive Chairman of the Company. The information contained in the Presentation (Information) is a summary only and should be read in conjunction with any oral briefing and all
other documents provided to you by the Company. The Information is current as of the date of this release and the Company does not undertake to provide any additional or updated
information, whether as a result of new information, future events or results or otherwise. By receiving the Presentation, you acknowledge and represent to the Company that you have
read, understood and accepted the terms of this disclaimer.
The Company has prepared the Presentation based on information available as of this release. No representation or warranty, express or implied, is made as to the currency, accuracy,
reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Neither Culpeo, its related bodies corporate, shareholders or affiliates, nor
any of their respective officers, directors, employees, affiliates, agents or advisers (Agents) guarantee or make any representations or warranties, express or implied, as to or take
responsibility for, the currency, accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Culpeo does not represent or
warrant that this Presentation is complete or that it contains all material information about Culpeo or which a prospective investor or purchaser may require in evaluating a possible
investment in Culpeo or acquisition of shares. To the maximum extent permitted by law, Culpeo and its Agents expressly disclaim any and all liability, including, without limitation, any
liability arising out of fault or negligence, for any loss arising from the use of information contained in this Presentation, or otherwise arising in connection with it.
Any forward-looking statements in this Presentation, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication or
guarantee of future performance and involve known and unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which are outside the control of
Culpeo and which are subject to change without notice and could cause the actual results, performance or achievements of Culpeo to be materially different from the future results,
performance or achievements expressed or implied by such statements. Past performance is not necessarily a guide to future performance and recipients of this Presentation are cautioned
not to place undue reliance on such forward-looking statements.
The information contained in this Presentation is for information purposes only, does not constitute investment or financial product advice (nor taxation, accounting or legal advice) and is
not intended to be used as the basis for making an investment decision. In providing this Presentation, Culpeo has not considered the objectives, financial position or needs of any
particular recipients. Before making an investment decision prospective investors should consider the appropriateness of the information in this Presentation having regard to their own
objectives, financial situation and needs, and seek legal, taxation and financial advice appropriate to their jurisdiction and circumstances.
This Presentation is not a prospectus, product disclosure statement or other offering document under Australian law or any other law (and will not be lodged with the Australian Securities
and Investments Commission, or any other foreign regulator) and is not, and does not constitute, an invitation or offer of securities for subscription, purchase or sale in any jurisdiction. In
particular, this Presentation does not constitute an invitation or offer of securities for subscription, purchase or sale in the United States or any other jurisdiction in which such an offer
would be illegal. The securities referred to in this Presentation have not been, and will not be, registered under the U.S. Securities Act of 1933 as amended or the securities laws of any state
or other jurisdiction of the United States and may not be offered or sold, directly or indirectly in the United States.
The information in this Presentation is strictly confidential. It may not be disclosed, reproduced, disseminated, quoted or referred to in whole or in part, without the express consent of
Culpeo.
SHARE OF WORLD MINE
PRODUCTION IN 2025
VERY WELL-ESTABLISHED
INFRASTRUCTURE
A SKILLED INDUSTRY
AND WORKFORCE
DEEP MINING SUPPLY
CHAIN
AIRPORT
160km
PORT
160km
PORT
100km
DESAL PLANT
160km
LA SERENA
Pop 200,000
WORKFORCE
160km
Au
SMELTER
130km
COMBARBALA
Pop 13,600
POWER
90km
POWER
3km
POWER
90km
ILLAPEL
Pop 32,000
SALAMANCA
Pop 26,000
SALAMANCA
Pop 26,000
WORKFORCE
120km
WORKFORCE
70km
WORKFORCE
50km
Au Mo
Source: USGS Mineral Commodity Summaries 2026 (data for 2025 production).
See Appendix for further detail on Carmen de Andacollo, Punitaqui, El Espino, and Los Pelambres
NB: Culpeo’s Projects are exploration-stage assets without a declared MRE or Ore Reserves. The inclusion of third-party information
is for regional context only and does not imply that similar mineralisation, grades, tonnages or economic outcomes will be
established at Culpeo’s Projects.
CHILE IS SYNONYMOUS WITH COPPER
UNDISPUTED WORLD
LEADER IN COPPER
PRODUCTION
FORTUNA
LANA CORINA
50km
0
N
23%
CHILE
Investor Presentation 3
Carmen de Andacollo Mine
Cu
Au
Cu
6,047Mt @ 0.47% Cu 28.4Mt 0f Cu (Resources)
715Mtt @ 0.58% Cu 3.36Mt of Cu (Reserves)
Los Pelambres Mine
Punitaqui Mine
Approx. 9Mt @ 1.11% Cu (Resources)
145Mt @ 0.55% Cu, 0.22g/t Au (Resources)
El Espino Project
Au
Cu
369Mt @ 0.32% Cu, 0.09g/t Au (Reserves)
ABOUT CULPEO MINERALS
FOCUSED CHILEAN
COPPER EXPLORATION
Culpeo confirms that it is not aware of any new information or data that materially affects the information included in
those releases. All material assumptions and technical parameters underpinning those releases continues to apply and
has not materially changed.
TWO PRIMARY PROJECT AREAS IN
THE LAND OF THE COPPER GIANTS
LANA CORINA PROJECT
High-grade outcropping new discovery,
454m at 0.96% CuEq from 90m
Mo
Cu
FORTUNA PROJECT
IP has identified two high priority targets at El Quillay
both close to surface >200m by 200m in scale
Au
Cu
1. Refer Appendix 1 for additional details including CuEq calculation methodology
2. Refer to ASX announcement dated 7 October 2025.
DRILL HIGH PRIORITY IP TARGETS DURING 2026
DRILLING UNDERWAY AT VISTA MONTANA
10kms
LA FLORIDA
Porphyry Cu/Au System 1,700m x 500m
MULTIPLE PROSPECTS
Channel and Surface Sampling Results Support
High-Impact Target Generation
LANA CORINA
New Discovery: 454m at 0.96% CuEq from 90m
(CMLCD014)
VISTA MONTANA
Just 1km Along Strike From the
Lana Corina Discovery
LANA CORINA PROJECT
FORTUNA PROJECT
Au
Cu
LEGEND
Culpeo tenements
CPO prospect
Road network
Punitaqui copper-gold mine
Power
0 5km
N
Investor Presentation 4
LANA CORINA PROJECT
Refer to ASX announcements dated 9 September 2026, 10 July 2024 and 6 July 2026 and refer to Appendix 1 for additional details including CuEq
calculation methodology. Culpeo confirms that it is not aware of any new information or data that materially affects the information included in those
releases. All material assumptions and technical parameters underpinning those releases continues to apply and has not materially changed.
• New copper-molybdenum discovery made in 2024
• Drill hole CMLCD014 returned a spectacular intersection
of 454m at 0.96% CuEq from 90m
• Consistency of mineralisation strongly supports the
interpretation of high-grade surface breccia zone and
associated porphyry mineralisation below
• Below the porphyry mineralisation, CMLCD014
intersected several wide zones of molybdenum
including 1,638ppm Mo (0.68% CuEq) over 46m
• IP programme completed at Lana Corina and Vista
Montana, assist targeting of 3km-long mineralised
corridor.
• Four-hole, 2,000m diamond drilling programme has
commenced at Vista Montana
LANA CORINA
454m at 0.96% CuEq from 90m (CMLCD014); incl
78m at 1.24% CuEq from 200m
257m at 1.10% CuEq from 170m (CMLCD002)
173m at 1.09% CuEq from 313m (CMLCD003)
169m at 1.21% CuEq from 239m (CMLCD010)
LANA CORINA PROJECT
LEGEND
Culpeo tenements
CPO prospect
Road network
Structural corridor
Punitaqui copper-gold mine
Power
0 5km
N
Investor Presentation 5
10kms
LANA CORINA DISCOVERY
VISTA MONTANA
Just 1km Along Strike From the
Lana Corina Discovery
PORPHYRY TARGET
PORPHYRY TARGET
LANA CORINA PROJECT
6
Investor Presentation
LANA CORINA DISCOVERY
North-easterly mineralised trend with outcropping copper targets over 3km1,2,3
454m at 0.96% CuEq
from 90 – 544m (CMLCD014)
500m
Drill hole CMVMD001
Targeting 600m Depth
PORPHYRY TARGET
PORPHYRY TARGET
VOX 3D MAGNETIC
INVERSION MODEL IMAGE
Magnetic low
Near surface breccia drill targets
Current Vista Montana Target Area
LANA CORINA AND VISTA MONTANA LONG SECTION
LANA CORINA PROJECT
7
Investor Presentation
SUCCESSFUL LINKAGE WOULD ESTABLISH A 3 KM MINERALISED SYSTEM
NE
SW
LANA CORINA DISCOVERY VISTA MONTANA PROSPECT
PORPHYRY TARGET
PORPHYRY TARGET
PORPHYRY TARGET
PORPHYRY TARGET
AREA CURRENTLY
TARGETED
LEGEND
Culpeo tenements
CPO prospect
Road network
0 5km
N
FORTUNA PROJECT
LA FLORIDA
Porphyry Cu/Au System 1,700m x 500m
6.65m at 1.03% Cu from 14.00m (CMLFD002)
6.10m at 1.35% Cu from 10.00m (CMLFD005)
7.47m at 1.36% Cu from 115.00m; (CMLFD005),
incl 0.49m at 4.19% Cu from 121.50m
MULTIPLE HIGH-
POTENTIAL PROSPECTS
Channel and Surface Sampling Results Support
High-Impact Target Generation
FORTUNA PROJECT
FORTUNA IS HOST TO
NUMEROUS OUTCROPPING
TARGETS
Investor Presentation 8
• Large concession area covering over 7,000 hectares
• Historic artisanal mines span over 6km of strike
• Multiple high-priority targets identified from channel
sampling, IP and diamond drilling
• Records show historical shallow mining of
approximately 200,000 tonnes at 2.00% copper
• Successful maiden drill programme at the La Florida
Prospect delivered multiple, high-grade results
from surface
• IP has identified two high-priority targets at El
Quillay both close to surface >200m by 200m
Refer to ASX announcements dated 4 January 2024 18 August 2026, Culpeo confirms that it is not aware of any new information or data that
materially affects the information included in those releases. All material assumptions and technical parameters underpinning those releases
continues to apply and has not materially changed. Note the historic mine production records are based on previous explorer’s reports and has not
been verified by the Company and are not JORC compliant (ASX announcement 11 September 2023)
EL QUILLAY
SOUTH PROSPECT
Investor Presentation 9
Refer to ASX announcements dated 9 September 2026, 15 June 2026, 6 July 2026. and 13 July 2026. Culpeo
confirms that it is not aware of any new information or data that materially affects the information included
in those releases. All material assumptions and technical parameters underpinning those releases continues
to apply and has not materially changed.
SIGNIFICANT COPPER AND GOLD RETURNED IN SAMPLING
FORTUNA PROJECT
• Rock chip sampling programme
completed as part of broader
geological mapping programme
• La Florida, four of the 15 samples
returned copper values >1.0% Cu,
high of 3.0% Cu
• El Quillay, two samples returned
assays >1.0% Cu, high of 2.2% Cu
• IP has identified two high-priority
targets close to surface >200m by
200m
• Initial assay results from 1,000m
diamond drilling programme
returned up to 2.11 CuEq (1.28g/t Au
and 0.51% Cu).
Interpreted position of the EQFZ and its association with significant
copper mineralisation at various Lana Corina prospects on a
satellite background
Interpreted position of the EQFZ and its association with significant
gold mineralisation at various Lana Corina prospects on a satellite
background
FORTUNA PROJECT
FORTUNA IP ANOMALIES ARE PRIORITY DRILL TARGETS
BOTH ANOMALIES COINCIDE WITH SURFACE COPPER MINERALISATION, ROCK-CHIP SAMPLING
RETURNED >1% CU IN AREAS OVERLYING THE GEOPHYSICAL RESPONSES
Investor Presentation 10
PROVEN TRACK RECORD OF DELIVERING NEW DISCOVERIES
Investor Presentation 11
BOARD AND MANAGEMENT
• Over 30 years’ of international resource
sector experience.
• Co-founder of Tesoro Gold which
discovered the El Zorro Gold Project.
• Previously Director of Mining Finance at
Societe General, New York.
• Private Equity Manager for PRCM (FUM
US$800M).
• Previous operational roles include
Project Manager, Senior Mine Geologist
and Mine Geologist for Ivanhoe Mines,
Lion Ore International and WMC.
• Geologist with more than 25 years’ of
resource experience, spanning
greenfield exploration, mineral
discovery, definition and feasibility,
construction, production and closure.
• Managing Director of ASX listed Tesoro
Gold Ltd, a company that has defined
the El Zorro Gold Project in Chile.
• Track record of exploration success
identifying and delineating new gold
districts in Brazil and Chile.
• Mining engineer with over 30 years’
experience in mining, exploration and
corporate development across gold and
base metal commodities within
Australia, Burkina Faso and DRC.
• Currently Vice President Corporate
Development TSS-V listed Sarama
Resources Ltd.
• Previously held senior roles with Moto
Goldmines, Gold Fields and WMC
Resources.
• Member of the Australasian Institute of
Mining and Metallurgy.
• Corporate administrator, manager and
development professional with deep
Chilean experience.
• More than 10 years’ resource sector
experience spanning greenfields
exploration, discovery production,
closure, retreatment and tailings
reclamation.
• Country Manager for ASX listed Tesoro
Gold Ltd Chile, and previously General
Manager of Acorn Mining Chile and
Country Manager for Cleveland Mining
Chile.
• Geologist and mining executive with
more than 35 years’ resource sector
experience, including leading
exploration teams in Australia, Eastern
Europe, Africa and South America.
• Former Managing Director of Lodestar
Minerals and Chief Executive Officer of
Kingwest Resources, where he
increased the Menzies Gold Project
Mineral Resource from 170,000 ounces
to 505,000 ounces.
• Inaugural Chief Executive Officer of
Galena Mining, leading the Company
through its ASX listing and the
definition of the high-grade Abra lead-
silver Mineral Resource.
NON-EXECUTIVE
CHAIR
GEOFF MCNAMARA
NON-EXECUTIVE
DIRECTOR
ZEFFRON REEVES PAUL SCHMIEDE ED TURNER SERGIO URIBE
NON-EXECUTIVE
DIRECTOR
TECHNICAL
DIRECTOR
CHILEAN COUNTRY
MANAGER
TREMENDOUS LEVERAGE TO NEW COPPER DISCOVERIES
Investor Presentation 12
CORPORATE SNAPSHOT
CAPITAL STRUCTURE REGISTER COMPOSITION
Share price (at 22 October 2026) A$0.013
Shares on issue (at 31 August 2026) 798M
Unlisted rights and options 533M
Market capitalisation A$10.3M
Cash (at 30 June 2026) A$2.1M
Debt (at 30 June 2026) Nil
Enterprise value (undiluted) A$8.1M
2%
40%
58%
Board and management
Top 20
Other
CULPEO MINERALS LIMITED
Investor Presentation 13
TARGETING LARGE-SCALE, HIGH-
GRADE COPPER SYSTEMS
THE DEFINING COMMODITY
OF THE ENERGY TRANSITION
WORLD’S PREMIER COPPER
JURISDICTION
COPPER CHILE
INVESTMENT HIGHLIGHTS
Cu
COPPER
29
NEW DISCOVERIES
CULPEO MINERALS LIMITED
CONTACT US
31-33 Cliff Street,
Fremantle WA 6160
+61 (8) 6311 9160
info@culpeominerals.com.au
geoff.mcnamara@culpeominerals.com.au
Investor Presentation 14
NOTABLE EXPLORATION RESULTS
Investor Presentation 15
APPENDIX A
• 454m at 0.96% CuEq from 90m in CMLCD014¹
• 257m at 1.10% CuEq from 170m in CMLCD002²
• 173m at 1.09% CuEq from 313m in CMLCD003³
• 169m at 1.21% CuEq from 239m in CMLCD010⁴
• 104m at 0.83% CuEq from 155m in CMLCD001A⁵
• 81m at 1.14% CuEq from 302m in CMLCD005A⁶
LANA CORINA DISCOVERY: DIAMOND DRILLING RESULTS
1. ASX Announcement dated 10 July 2024 “Lana Corina Drill Results Extended – 454m @ 0.93% CuEq”.
2. ASX Announcement dated 11 May 2022 “Culpeo Intersects 257m @ 0.95% copper at Lana Corina”.
3. ASX Announcement dated 6 June 2022 “Culpeo Minerals Intersects 173m @ 1.05% copper”.
4. ASX Announcement dated 23 November 2022 “Drilling Intersects 169m @ 1.08% Cu Grades up to 3.56% Cu”.
5. ASX Announcement dated 2 May 2022 “Culpeo Intersects 104m @ 0.74% copper at Lana Corina”.
6. ASX Announcement dated 20 June 2022 “Multiple High-Grade Cu Intersections at Lana Corina”.
Activity Competent Person Membership Status
Exploration Results
(from 1 May 2026)
Mr Ed Turner
(Technical Manager)
AIG Member
Exploration Results
(until 31 Oct 2024)
Mr Maxwell Donald Tuesley
(Shareholder and former Director)
AusIMM Member
Exploration Results
(after 31 Oct 2024)
Mr Zeffron Reeves
(Director and Shareholder)
AIG Member
Geophysical Results
Mr Nigel Cantwell
(Consultant)
AIG and ASEG Member
ADDITIONAL INFORMATION
Investor Presentation 16
APPENDIX B
COPPER EQUIVALENT (CuEq) CALCULATIONS COMPETENT PERSONS’ STATEMENTS
COURSE CHALCOPYRITE VEINS 2.40% CU (341.5 - 342.5M) IN CMLCD005
The information in this announcement that relates to the historic Exploration Results and Geophysical
Results as listed in the table below is based on, and fairly represents, information and supporting
documentation prepared by the Competent Person whose name appears in the same row, who is a
Director or shareholder of or independent consultant to the Company and is a Member of the Australasian
Institute of Mining and Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG), Australian Society
of Exploration Geophysics (ASEG), or a Recognised Professional Organisation (RPO). Each person named in
the table below has sufficient experience which is relevant to the style of mineralisation and types of
deposits under consideration and to the activity which he has undertaken to quality as a Competent Person
as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves.
• Assumed commodity prices: Cu US$4.75/lb, Au US$3,200/oz, Mo
US$20/lb and Ag US$35/oz.
• Recoveries are assumed from similar deposits: Cu 85%, Au 65%,
Ag 65% and Mo 80%.
• CuEq (%) is calculated using the following formula: ((Cu% x Cu
price 1% per tonne x Cu recovery) + (Au(g/t) x Au price per g/t x
Au recovery) + (Mo g/t x Mo price per g/t x Mo recovery) + (Ag
g/t x Ag price per g/t x Ag recovery)) / (Cu price 1% per tonne x
Cu recovery)
• CuEq (%) = Cu (%) + (0.83 x Au (g/t)) + (0.00040 x Mo (g/t)) +
(0.009 x Ag (g/t)).
• It is the Company’s opinion that all elements included in the metal
equivalent calculation have a reasonable potential to be recovered
and sold.
EARN-IN SCHEDULES
Investor Presentation 17
APPENDIX C
LANA
CORINA
PERIOD FROM
ORIGINAL SIGNING
CONSIDERATION
WORK
COMMITMENT
STAGE
INTEREST
AGGREGATE
INTEREST
(Months) (US$) Description (%) (%)
1 Signing 100,000 N/A 0 0
2 12 150,000 US$1M expenditure 20 20
3 24 250,000 US$1M expenditure 30 50
4 May 2025 100,000 N/A 0 50
5 4 September 2026 100,000 N/A 0 50
6 4 September 2027 500,000 N/A 5 55
7 4 March 2028 700,000 N/A 10 65
8 4 March 2029 1,000,000 N/A 5 70
9* 4 March 2029 1,650,000 N/A 10 80
FORTUNA
PERIOD FROM
ORIGINAL SIGNING
CONSIDERATION
WORK
COMMITMENT
STAGE
INTEREST
AGGREGATE
INTEREST
Months US$ Description % %
1 12 120,000 N/A 80 80
2 24 120,000 N/A 0 80
3 36 120,000 N/A 0 80
4 48 120,000 N/A 0 80
5 60 120,000 US$1M expenditure4 0 80
*Stage 9 USD 1,000,000 payable in cash or shares at Culpeo’s election
REFERENCES
Investor Presentation 18
APPENDIX D
PROJECT / OWNER DEVELOPMENT STAGE MARKET CAP MINERAL RESOURCE RESOURCE ORE RESERVE RESERVE HISTORICAL PRODUCTION PRODUCTION FIGURE
LAST REPORTED CONTAINED COPPER IF REPORTED
CONTAINED
COPPER
Los Pelambres
Antofagasta Minerals
Producer £30.04 Billion 6,047 Mt at 0.47% Cu 28.42 Mt Cu 715.7 Mt at 0.58%
Cu
4.15 Mt Cu More than 8.5 million tonnes of copper
produced since commencement, as
disclosed by Antofagasta in June 2025
295,300 t Cu in CY2025
213,100 t Cu in the nine months to September
2026
Carmen de Andacollo
Teck
Producer USD$29 Billion 471.7 Mt across Measured,
Indicated and Inferred categories
1.20 Mt Cu 234.8 Mt at 0.30%
Cu
704,000 t Cu Producing since 1996, but I have not
established a reliable cumulative
lifetime copper production total
50,500 t Cu in CY2025
26,700 t Cu in H1 2026
El Espino
Pucobre
Developer Private
Company
135 Mt at 0.52% Cu and 0.13 g/t Au 702,000 t Cu No separate
quantified Ore
Reserve identified
in the latest annual
report
Approximately 9 million tonnes of ore
historically processed from the Cinabrio
deposit. A reliable cumulative
contained copper production figure has
not been established
13,210 dry metric tonnes of copper
concentrate sold during CY2025
Punitaqui
Battery Mineral Resources
Producer CAD$69 Million 9.230 Mt of sulphides: 6.173 Mt at
1.14% Cu Indicated and 3.057 Mt at
0.93% Cu Inferred
98,800 t Cu No formal Ore
Reserve identified
Zero commercial production.
Development project
Not yet producing
PROJECT / OWNER SOURCES AND REPORTING
Los Pelambres
Antofagasta Minerals
Antofagasta’s 2025 Annual Report, as at 31 December 2025. The Mineral Resource is reported including the Ore Reserve. Antofagasta’s historical production statement and September 2026 production report antofagasta.co.uk
Carmen de Andacollo
Teck
Teck’s 2025 Annual Information Form, as at 31 December 2025. Its Mineral Resources exclude Ore Reserves. The Resource comprises 392.1 Mt Measured and Indicated plus 79.6 Mt Inferred. https://www.teck.com/media
El Espino
Pucobre
El Espino: Pucobre’s 2025 Annual Report. The 135 Mt comprises 59 Mt Measured and 76 Mt Indicated. This resource also contains approximately 564,000 oz of gold, calculated from the reported grade.
Punitaqui
Battery Mineral Resources
BMR’s August 2022 NI 43-101 estimate. There is also a separate Dalmacia oxide Resource of 2.973 Mt containing approximately 19,900 t Cu, which is not included in the sulphide figure in the table above. BMR’s project history and 2025 financial disclosures.
https://bmrcorp.com/news/battery-mineral-resources-corp-announces-robust-ni-43-101-resource-estimate-of-6.2-million-tonnes-indicated-and-3.1-million-tonnes-indicated-and-3.1-million-ton/
All figures are on a 100% project basis, not adjusted for the operator’s ownership interest. Contained copper is calculated from reported tonnage and grade, so figures are approximate.
The Mineral Resource and Ore Reserve estimates presented have been sourced from publicly available disclosures made by the respective project owners. The estimates have not been independently verified by Culpeo Minerals Limited.
Share your feedback
Discover