Quarterly Activities Report
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
30 OCTOBER 2023
ASX:CPO OTCQB:CPORF
QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDED 30 SEPTEMBER 2023
Culpeo Minerals Limited (Culpeo or the Company) (ASX:CPO, OTCQB:CPORF) is pleased to report on its activities for the quarter ended
30 September 2023 (the Quarter).
HIGHLIGHTS
• Completed acquisition of 80% interest in the untested Fortuna Project, increasing copper exploration landholdings by 300% in
the highly prospective coastal metallogenic belt of Chile1.
• Fortuna Project hosts multiple broad zones of copper mineralisation that outcrop at surface, measuring >1,000m in length
and up to 500m in width. Historic surface channel sampling returned wide zones, including:
• 150m @ 1.31% CuEq;
• 102m @ 1.25% CuEq; and
• 173m @ 0.86% CuEq.
• High Priority El Quillay North target defined at Fortuna Project in the northern portion of the 3km long El Quillay mineralised
trend2.
• Mine records show approximately 200,000 tonnes @ 2% Cu extracted historically [open pit and underground] at the Fortuna
Project. Historical underground sampling2 returned high-grade zones, including:
• 3m @ 6.92% Cu;
• 15m @ 1.50% Cu;
• 5m @ 1.18% Cu; and
• 5m @ 2.70% Cu.
• Fortuna Project package extended with new tenement applications covering 2,250 hectares, filed with the Chilean Judicial Authority
(Civil Court), the authority responsible for the granting of new tenements3.
• Placement to institutional and sophisticated investors, raising approximately A$1.3 million (before costs)4.
• Post quarter end, shareholder approval was received for Tranche 2 of the raising; the Company issued approximately 18.9 million
Placement Shares and receipted approximately A$0.6 million, providing cash and equivalents of approximately A$0.9 million.
1.
2.
3.
4.
Refer to ASX announcement 7 August 2023
Refer to ASX announcement 11 September2023
Refer to ASX announcement 4 October 2023
Refer to ASX announcement 1 September2023.
PAGE |1
info@culpeominerals.com.au
Level 48, 152-158 St Georges Terrace, Perth WA 6000
61 (8) 6311 9160
ASX ANNOUNCEMENT 30 October 2023
Operating Activities
During the Quarter, the Company announced the acquisition of the Fortuna Project, located 10km north of its Lana Corina Project and
consisting of four encouraging prospects: La Florida, El Quillay North, Vaca Muerta and Piedra Dura (Figure 1). Extensive outcropping
copper mineralisation and historic small scale mining operations are present throughout the project area.
Figure 1: Regional map showing location of new Fortuna concessions adjacent to the Lana Corina Project (ASX announcement 11 September 2023).
PAGE | 2
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 October 2023
El Quillay North Prospect
The El Quillay North Prospect is hosted within a >3km long regional fault zone in an area previously exploited by both open cut and
underground mining. Mineralisation is present as a series of parallel mineralised bodies with elevated levels of copper, gold and silver.
Figure 2: Surface geology map of El Quillay North showing the position of mineralised zones and historic mine workings (ASX announcement 11 September 2023).
Mineralised zones are hosted within andesitic lithologies (Figure 2) and show hydrothermal alteration present as sericite, albite-adularia,
chlorite-epidote and hematite (specularite). Along the mineralised regional structure at El Quillay, three exploration targets have been
identified (North, Central and South), with multiple mineralised zones recognised in each area. The zones measure up to 1,000m long,
50m wide and 200m deep.
Records indicate that since the 1950’s , copper mineralisation at El Quillay North has been periodically exploited by small scale mining
activities both from the surface and underground. Several shafts were sunk to a maximum depth of 80m, extracting predominantly sulphide
mineralisation in the form of chalcopyrite and bornite.
Historic mapping and sampling programs were undertaken in the area, with 294 samples taken from both the surface and underground
(Figure 3).
PAGE | 3
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 October 2023
Figure 3: Cross Section through the El Quillay Prospect showing widths of mineralisation and historic sampling results (ASX announcement 11 September 2023).
Vaca Muerta Prospect
Vaca Muerta includes, a series of outcropping structurally controlled, breccia hosted mineralised bodies, significantly enriched in Cu and
Ag. Mineralisation is located within a corridor approximately 1,000m long and up to 500m wide (Figure 4), and hosted within porphyritic
volcanic rocks displaying strong albite alteration replacing plagioclase and also as veinlets and small clusters accompanied by quartz.
Surface copper rich zones have individual lenses between 400 and 800m strike, and widths between 25 and 150m, mapping and sampling
of historic underground workings has shown mineralisation to be present to at least 100m below the surface and open at depth. Historic
channel sampling reported significant widths and grades of copper mineralisation including:
•
150m @ 1.31% CuEq;
•
101.5m @ 1.25% CuEq; and
•
172.5m @ 0.86% CuEq.
Copper mineralisation occurs in outcrop in the form of chrysocolla and malachite transitioning into chalcopyrite and bornite in the primary
sulphide zone. The oxide zone is approximately 25m in depth, below which the primary sulphides extend to >100m.
PAGE | 4
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 October 2023
Figure 4: Vaca Muerta Prospect long section looking east, showing drill ready targets (ASX announcement 7 August 2023).
La Florida Prospect
La Florida contains a large outcropping north-south trending mineralised zone approximately 1,300m long and 400m wide. Host rocks
consist of andesitic volcanic rocks and intrusive rocks, mostly consisting of quartz-feldspar porphyry.
A large alteration / stockwork zone is present on the surface at La Florida (Figure 5) and covers a surface area of >300m of strike and
>200m in width. Historical mapping identified hydrothermal alteration hosted within the quartz-feldspathic intrusive rocks with argilisation,
silicification and sericitation recognised in the core of the system and epidote-chlorite and minor clays present in the outer halo. Limonite
is associated with these alteration minerals and is interpreted to be derived mainly from pyrite hosted as disseminations and within quartz
veins, within this zone the erratic presence of copper oxides is also noted.
PAGE | 5
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 October 2023
Figure 5: La Florida Prospect, plan view showing large copper bearing alteration zone outcropping at surface (ASX announcement 7 August 2023).
Piedra Dura Prospect
Piedra Dura is located 1.8km west of El Quillay with outcropping copper mineralisation over at least 500m of strike and up to 50m wide
observed. Copper oxide mineralisation at Piedra Dura has been historically exploited with both surface and underground mining methods.
Quelon Project
No exploration activities were completed during the Quarter.
San Sebastian Project
No exploration activities were completed during the Quarter.
Las Petacas Project
No exploration activities were completed during the Quarter.
PAGE | 6
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 October 2023
Fortuna Project Option Agreement: Key terms
Culpeo has acquired an 80% interest in the Fortuna Project via an option agreement with private Chilean company Inversiones Em Dos
Limitada (Option Agreement). The Company and Inversiones Em Dos Limitada have an existing relationship through the earn-in
agreement over the Company’s Lana Corina Project (refer to the Company’s ASX announcement dated 20 March 2023 for details).
Key terms of the Option Agreement are set out below:
(a) Acquisition: Culpeo has acquired an 80% interest in the Fortuna Project.
(b) Option Payments: to retain its 80% interest, Culpeo must make option payments totalling US$600,000 (comprising of
US$10,000 per month) over a 5-year period (Option Term).
(c) Option: Culpeo may cease making the option payments for Fortuna at any time during the Option Term at its election, in which
case it must return the Fortuna Project to the vendors and the Fortuna option agreement will terminate.
(d) Rights: During the Option Term, Culpeo has the right to explore for minerals on the Fortuna Project as operator.
(e) Minimum Expenditure: In addition to making the option payments, Culpeo must satisfy a minimum expenditure requirement of
US$1,500,000 across both the Fortuna Project and the Company’s existing Lana Corina Project (with allocation of expenditure
to be at the sole discretion of the Company).
(f) Buy-out Option: Upon Culpeo completing all option payments (US$600,000) and has satisfied the minimum expenditure
requirement at the Fortuna and Lana Corina Projects, the Company can elect to purchase 100% of the Fortuna Project, for a
negotiated amount at the relevant time.
New Tenement Applications and Prospectivity
Post Quarter end, a new tenement application was made for an area of approximately 2,250 ha (Figure 1). The application area contains
numerous historic shafts and evidence of small-scale mining (Figure 6). The lithological and structural setting is similar to the known
copper occurrences at Fortuna, but has not been subject to modern exploration.
A preliminary geological assessment of the surface geology in the application area has identified the presence of similar lithologies and
alteration types that are observed at Fortuna and Lana Corina indicating that the area is highly prospective for hosting the high-grade
copper mineralisation that exists in the district, such as at Lana Corina.
Mapping and geochemical sampling is planned to rapidly define new drill targets.
PAGE | 7
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 October 2023
Figure 6: Numerous historic shafts and small-scale mining operations exist on the new application area (ASX announcement 4 October 2023).
Copper Equivalent (Cu Eq) values: Assumed commodity prices for the calculation of Copper Equivalent (Cu Eq) is Cu US$3.00/lb, Au US$1,700/oz, Mo US$14/lb
and Ag US$20/oz. Recoveries are assumed from similar deposits: Cu = 85%, Au = 65%, Ag = 65%, Mo = 80%, Cu Eq (%) was calculated using the following formula:
((Cu% x Cu price 1% per tonne x Cu recovery) + (Au(g/t) x Au price per g/t x Au recovery) + (Mo ppm x Mo price per g/t x Mo recovery) + Ag ppm x Ag price per
g/t x Ag recovery)) / (Cu price 1% per tonne x Cu recovery). Cu Eq (%) = Cu (%) + (0.54 x Au (g/t)) + (0.00037 x Mo (ppm)) + (0.0063 x Ag (ppm))
It is the Company’s opinion that all elements included in the metal equivalents have a reasonable potential to be recovered.
PAGE | 8
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 October 2023
Corporate Activities
During the period, the Company announced the proposed issue of approximately 38.25 million new fully paid ordinary shares in the
Company to professional and sophisticated investors at an issue price of $0.032 per share (Placement Shares), to raise approximately
$1.224 million (before costs) comprising:
•
Tranche 1: Approximately $0.62 million via the issue of approximately 19.37 million Placement Shares within the Company’s
placement capacity under ASX Listing Rule 7.1 and 7.1A; and
•
Tranche 2: Approximately $0.6 million via the issue of approximately 18.87 million Placement Shares, subject to obtaining
shareholder approval at a General Meeting of the Company’s shareholders (GM).
The Offer Price was $0.032 per Placement Share reflecting a:
•
20.0% discount to the last close price of $0.040 on 29 August 2023; and
•
25.4% discount to the 5-day volume weighted average price of $0.043.
Placement participants received 1 free attaching option for every 2 Placement Shares subscribed for, on the terms and conditions set out
in the Explanatory Memorandum accompanying the Notice of Meeting, which were subject to shareholder approval at the GM (Attaching
Options). The Attaching Options are intended to be unquoted with an exercise price of $0.048 and the expiry date (exercisable anytime)
two years from the date of issue.
The Company engaged Unified Capital Partners Pty Ltd (UCP) as Lead Manager to the Placement (Lead Manager) (excluding the Tranche
2 North America placement). The Lead Manager (or its nominee) will receive a 6% management and selling fee on all funds raised under
the Placement. The Company will also issue the Lead Manager (or its nominees) 2,000,000 Options (Lead Manager Options) upon full
subscription of the Placement, subject to Shareholder approval to be sought at the GM. The Lead Manager Options will be issued on the
same terms as the Attaching Options.
Salary Sacrifice Plan
At the GM, the Company sought shareholder approval for a Salary Sacrifice Plan to enable executives, employees and directors of the
Company to receive share rights in the Company, in lieu of remuneration or fees. The Salary Sacrifice Plan has been designed to further
align participants (being executives, employees and directors of the Company) with shareholder interests whilst being an effective way for
the Company to conserve capital. Directors, Messrs McNamara, Tuesley and Schmiede have each received shareholder approval at the
GM to participate in the Salary Sacrifice Plan.
Use of Funds
The Company spent approximately A$232k on exploration activities during the Quarter, predominantly relating to sampling and drilling
programs on the Lana Corina Copper and Molybdenum Project. In addition, Option earn-in payment of $30k respecting the newly acquired
Fortuna Project. Included in the working capital below are the exploration activities on the Lana Corina and Fortuna Projects of A$221k
and $39k, respectively .
PAGE | 9
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 October 2023
The Company’s cash balance as at 30 September 2023 was A$230k. Post quarter end, shareholder approval was received for Tranche
2 of the raising; the Company issued approximately 18.9 million Placement Shares and receipted approximately A$0.6 million, providing
cash and equivalents of approximately A$0.9 million. Pursuant to ASX Listing Rule 5.3.4, the Company provides its actual expenditure on
the individual items in the two year “use of funds” statement in its IPO prospectus since the date of its admission to ASX’s Official List
(being 10 September 2021) against the estimated expenditure on those items and an explanation of any material differences:
Prospectus
Actual
Actual
24-month period
Q1 FY24
TOTAL
A$
A$
A$
Exploration Las Petacas Project
2,486,340
-
1,621,084
Exploration Quelon Project
1,868,453
2,087
570,093
Exploration San Sebastian Project
300,000
-
473
Expenses of the Offer
243,890
-
309,432
Administration Costs
845,000
-
845,000
Working Capital (includes Lana Corina expenditure)
790,709
585,208
5,703,815
Total
6,534,392
587,295
9,049,897
Summary of Material Variances
The Company exceeded budgeted expenditure since admission to the ASX predominantly due to the strong results from the Phase 1 and
2 drilling programs and subsequent fast-tracking of exploration activities at the Lana Corina Project.
Payments to Related Parties
As outlined in the Appendix 5B for the quarter ending 30 September 2023 (Sections 6.1 and 6.2), approximately A$136k in payments
were made to related parties and/or their associates, which comprised remuneration for the Managing Director, Non-Executive Director
fees and Consulting fees.
This announcement has been authorised by the Board of Directors of Culpeo Minerals Limited
CONTACT
Max Tuesley
Managing Director
E: max.tuesley@culpeominerals.com.au
P: +61 (08) 6311 9160
PAGE | 10
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 October 2023
ABOUT CULPEO MINERALS LIMITED
Culpeo Minerals is a copper exploration and development company with assets in Chile, the world’s number one copper producer. The Company
is exploring and developing high grade copper systems in the coastal Cordillera region of Chile.
The Company has recently acquired the Lana Corina Copper and Molybdenum Project situated in the Coquimbo region of Chile, where near
surface breccia hosted high-grade copper mineralisation offers walk up drilling targets and early resource definition potential.
The Company has two additional assets, the Las Petacas Project, located in the Atacama Fault System near the world-class Candelaria Mine.
Historic exploration has identified significant surface mineralisation with numerous outcrops of high-grade copper mineralisation which provide
multiple compelling exploration targets. The Quelon Project located 240km north of Santiago and 20km north of the regional centre of Illapel, in
the Province of Illapel, Region of Coquimbo. Historical artisanal mining has taken place within the Quelon Project area, but modern exploration
in the project area is limited to rock chip sampling and geophysical surveys.
Culpeo Minerals has a strong board and management team with
significant Chilean country expertise and has an excellent in-country
network. All these elements enable the
company to gain access to quality assets in a non-competitive
environment. We leverage the experience and relationships developed
over 10 years in-country to deliver low cost and effective discovery and
resource growth. We aim to create value for our shareholders through
exposure to the acquisition, discovery and development of mineral
properties which feature high grade, near surface copper mineralisation.
COMPETENT PERSONS’ STATEMENTS
The information in this announcement that relates to Exploration Results
is based on information compiled by Mr Maxwell Donald Tuesley, BSc
(Hons) Economic Geology, MAusIMM (No 111470). Mr Tuesley is a member of the Australian Institute of Mining and Metallurgy and is a
shareholder and Director of the Company. Mr Tuesley has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Tuesley consents to the inclusion in this
report of the matters based on this information in the form and context in which it appears.
PAGE | 11
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 October 2023
Appendix A Culpeo Minerals Exploration Concessions as at 30 September 2023
Project
Licence
Lana - Corina
San Agustin
Socavon
Lana Segunda
Corina
Laco 1 1 – 10
Sara 1 – 20
Patty 2 1 – 75
Patty 3 1 – 260
Patty 4 1 - 111
Petacas
Peta 31/55
Peta 91/96
Peta 15/28
La Rosa 27/28
La Rosa 31/46
La Rosa 1/30
Corredor 2, 1/12
Corredor 3, 1/6
Cachorro 1/20
Cachorro 1,1/160
Cachorro 2, 1/95
Cachorro 3, 1/24
Cachorro 4, 1/173
Cachorro 5, 1/87
Almudena 1,1
Amudena 2, 1/3
Almudena 3, 1/2
Almudena 4, 1/7
Almudena 5, 1/6
Almudena 6,1
Almudena 7,1
Almudena 8,1/4
Quelon
Angela 10 1/20
Angela 1 1/15
Angela 11 1/10
Angela 12 1/10
Angela 13 1/30
Angela 14 1/20
Angela 15 1/14
Angela 3 1/30
Angela 4 1/29
Angela 5 1/18
Angela 6 1/30
Angela 7 1/30
Angela 8 1/20
Angela 9 ½
San Andres 10 1/24
San Andres 1 1/15
San Andres 11 1/24
San Andres 13 1/19
San Andres 14 1/15
San Andres 15, 1-30
San Andres 16, 1-30
San Andres 17 1-30
San Andres 18, 1-10
San Andres 2, 1-10
San Andres 4 1/5
San Andres 5 ¼
San Andres 6 1/20
San Andres 7 1/20
San Andres 8 1/20
San Andres 9 1/20
Teresa 1 1/30
Teresa 2 1/15
Teresa 3 1/20
Teresa 4 1/20
San Sebastian
San Sebastian 1/16 (2/16)
San Sebastian 1/16 (1)
Company
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
Antofagasta Minerals S.A.
SCM Antares
SCM Antares
SCM Antares
Total – Lana Corina
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
Total – Las Petacas
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Vasco Minera
Total – Quelon
Minera Panga SpA
Minera Panga SpA
Total – San Sebastian
Area
(Ha)
1
1
1
1
10
90
75
260
111
550 Ha
120
10
70
6
80
300
12
6
20
160
95
242
173
87
1
3
2
7
6
1
1
4
1,406 Ha
191
150
63
66
255
200
70
170
205
108
236
236
131
17
216
114
216
102
102
290
330
324
100
57
23
36
200
200
200
161
279
150
200
155
5,553 Ha
45
5
50 Ha
Grant
Expiry
1951
1951
1951
1951
2015
2006
2019
2019
2019
None
None
None
None
None
None
None
None
None
11-Nov-89
11-Nov-89
06-Nov-89
26-Dec-89
28-Jun-11
25-Nov-91
18-Feb-15
18-Feb-15
11-Nov-14
28-Jul-15
18-Feb-15
18-Feb-15
18-Feb-15
18-Feb-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
19-Aug-13
19-Aug-13
22-Dec-15
20-Jan-16
28-Dec-15
08-Jan-13
08-Jan-13
30-Nov-15
13-Feb-14
13-Jan-14
13-Feb-14
02-Dec-14
02-Dec-14
13-Feb-14
13-Jun-17
03-Jun-17
03-Jun-17
03-Jun-17
03-Jun-17
01-Feb-19
06-Jul-19
01-Feb-19
14-May-19
12-Nov-17
13-Jun-17
03-Jun-17
03-Jun-17
03-Jun-17
03-Jun-17
03-Jun-17
21-Oct-13
21-Oct-13
21-Oct-13
21-Oct-13
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
1998
1998
None
None
PAGE |8
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 October 2023
Project
Fortuna
Licence
LA FLORIDA 1/20
LA FLORIDA II 1/20
PIEDRA DURA 1/20
EL QUILLAY 5A 1/100
EL QUILLAY 4A 1/25
Bastis 29CB 1/16
Bastis 29CB 17/20
LOS QUILLAYES 1/4 (3/4)
LA ESPERANZA 1/10
PRETECATEMO 1/XX
Antares 1 al 200
MATILDE 2 1/50
El Quillay 2 1/224
El Quillay 3 1/236
El Quillay 4A 1/89
El Quillay 4B 1/40
El Quillay 5A 1
El Quillay 5C 1/98
El Quillay 6 1/13
El Quillay 6A 1/7
La Escondida 1-14
Company
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SLM La Escondida
Total – Fortuna
Area
(Ha)
100
100
96
17
25
127
35
10
50
100
165
200
224
236
89
40
1
98
13
7
42
1775 Ha
Grant
Expiry
2007
2010
2006
2011
2011
2011
2011
1984
1960
1953
2011
2011
2011
2011
2011
2011
2011
2011
2011
2011
2005
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
PAGE |8
CULPEOMINERALS.COM.AU
Share your feedback
Discover