Culpeo Minerals Limited (Culpeo or the Company) (ASX:CPO, OTCQB:CPORF) is pleased to report on its
activities for the Quarter ended 31 March 2025 (the Quarter).
Subsequent to Quarter end, the Company advised of recently completed mapping, rock chip, and channel
sampling at the Vista Montana Prospect where recently results of up to 2.62% copper, 2.07g/t gold,
11.2g/t silver, 749ppm antimony and 117.5ppm bismuth follow on from previous soil sampling and
geophysical results and analysis 1, 4, 6, 10 (Figure 1).
Results from the latest round of sampling provide confirmation of a well-defined copper porphyry target,
exhibiting typical zoned alteration and associated geochemical zonation, commonly associated with
copper-bearing porphyry intrusions. At surface, the core of the porphyry target at Vista Montana has a
footprint of approximately 250m x 250m and is interpreted to represent a “finger” of a larger, buried
intrusive identified through geophysics10 (Figure 2).
Subsequent to the end of the Quarter, Culpeo announced it had signed a binding, staged option
agreement with Excava Holdings SpA (Excava) to acquire up to 100% of the highly prospective Jupiter
Copper Project (Jupiter), covering approximately 4,000ha in the low-altitude Coastal Cordillera belt of
Chile (refer Figure 5). Jupiter is a strategic acquisition offering large-scale, high-grade copper exposure in
the Antofagasta region of Chile. The concession package includes multiple small-scale mines (refer Figure
6) and two distinct zones of identified copper mineralisation, with surface samples returning grades up
to 4.33% Cu and 3.24g/t Au (refer to ASX announcement 14 April 2025). The acquisition structure has
minimal upfront capital requirement and provides Culpeo with the option of increasing to 100%
ownership of the project.
Subsequent to Quarter end, the Company advised that it had agreed to an amended Earn-In Schedule
for the acquisition of the Lana Corina Copper-Molybdenum Project, Chile (Lana Corina) (the Earn-In
Schedule)1. This favourable amendment means Culpeo retains the option to increase its ownership in
Lana Corina to an 80% aggregate interest through a further four staged payments at six-monthly intervals
(Table 1), and a right of first refusal to acquire the final 20%, for 100% ownership. Culpeo has sole
discretion as to whether the consideration at each remaining stage is settled in shares or cash.
CULPEOMINERALS.COM.AU
info@culpeominerals.com.au
Level 39, 152-158 St Georges Terrace, Perth WA 6000
61 (8) 6383 7894
ASX ANNOUNCEMENT 30 APRIL 2025
OPERATING ACTIVITY DETAIL
LANA CORINA AND VISTA MONTANA PROJECTS
On 28 April 2025, the Company advised of recently completed mapping, rock chip, and channel sampling
at Vista Montana where recently returned results of up to 2.62% copper, 2.07g/t gold, 11.2g/t silver,
749ppm Antimony and 117.5ppm Bismuth) follow on from previous soil sampling and geophysical
results and analysis.
Results from the latest round of sampling provide confirmation of a well-defined copper porphyry target,
exhibiting typical zoned alteration and associated geochemical zonation commonly associated with
copper-bearing porphyry intrusions. At surface, the core of the porphyry target at Vista Montana has a
footprint of approximately 250m x 250m and is interpreted to represent a “finger” of a larger, buried
intrusive identified through geophysics10.
Figure 1: Vista Montana porphyry target approximately 250m x 250m, interpreted to be a “finger” of a larger
buried intrusive identified by geophysics, (refer ASX announcement dated 18 May 2022).
PAGE |2
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 APRIL 2025
Copper-mineralised porphyry systems often display a well-developed alteration and geochemical
zonation which aid in the targeting and identification of high-priority intrusive centres. Vista Montana
demonstrates the classical porphyry zonation, significantly upgrading its status as a high-priority target
for Culpeo.
Figure 2: Lana Corina and Vista Montana mineralised trend and location of the Vista Montana zoned porphyry
target above a larger interpreted porphyry target. Image of inverted magnetics (Refer ASX announcement
31 August 2022)1, 2, 5.
There remains considerable potential for additional high-grade copper discoveries along the
approximately 3km prospective trend from Lana Corina in the south to Vista Montana in the north,
where several undrilled breccia targets have been identified along this corridor, in addition to the
newly confirmed Vista Montana porphyry target.
MAIDEN DRILLING PROGRAM AT VISTA MONTANA
The large copper-bearing zone at Vista Montana is considered prospective for intrusive-hosted
copper mineralisation at surface. The metal assemblage observed suggest a shallower erosional level
at Vista Montana, relative to typical vertical and lateral zonation of porphyry systems (Figure 3),
indicating that the mineralised system is present at or near surface.
Mineralisation begins at surface and is expected to continue at depth, with the metal assemblage
evolving as the system becomes deeper and hotter (Figure 3).
Culpeo has planned an initial three-hole diamond drilling program to test the Vista Montana
porphyry target. Due to the proximity of the small settlement of Soruco, located approximately 750m
northwest of the target area, the Company is in the process of negotiating a long-term access
PAGE |3
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 APRIL 2025
Figure 3: Schematic Diagram showing the pathfinder geochemical and alteration patterns of a typical porphyry
copper mineral system and the relative location of Lana Corina and the NE-Sector – Vista Montana (modified
from Halley et. Al. 2015) 4.
agreement with the Soruco community to facilitate both the initial drilling and future exploration
programs at Vista Montana. It is expected that an access agreement will be finalised within the next
two months.
FORTUNA PROJECT
Recent exploration and analysis at the La Florida Prospect have identified an additional copper porphyry
target to the north of the Fortuna Project tenement area (Figure 4).
The La Florida porphyry target exhibits classic porphyry-style alteration and geochemical zonation, with
previous surface sampling returning results of up to 3.96% copper and 2.61g/t gold13.
PAGE |4
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 APRIL 2025
Figure 4: Plan view of the La Florida Prospect showing high priority porphyry targets over an area of 1.7km by
0.5km.
SAN SEBASTIAN AND LAS PETACAS PROJECTS
No exploration activities were completed during the Quarter.
2025 EXPLORATION PROGRAMS
Culpeo continues to advance its exploration activities across its key projects, with the following activities
set to commence through the remainder of 2025:
•
Final preparations are currently underway for a maiden drill program at the Vista Montana porphyry
target where Culpeo has planned an initial three-hole diamond drilling. Recognising the proximity
of the small settlement of Soruco, situated approximately 750m northwest of the target area, the
Company is in the process of negotiating a long-term access agreement with the Soruco community
to facilitate both the initial drilling and future exploration programs at Vista Montana. It is expected
that an access agreement will be finalised within the next two months.
PAGE |5
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 APRIL 2025
•
Preparations are also underway for the maiden drill program at La Florida, including securing site
access and selecting a drilling contractor to commence testing this large and compelling target. An
initial four-hole diamond drilling program is planned to commence in the next four to six weeks.
•
The Company will commence exploration at Jupiter during Q2 2025, including district-scale
geological mapping, regional litho-geochemical surveys and ground-based geophysical surveys.
CORPORATE ACTIVIT Y
JUPITER PROJECT ACQUISITION
On the 14th of April 2025, the Company announced the acquisition of the Jupiter Project, which was
structured as a earn-in arrangement.
Financial terms include:
•
Initial Payment: US$40,000 within five business days of executing the binding agreement.
•
Year 1: US$80,000 on the first anniversary of the execution date.
•
Year 2: US$200,000 on the second anniversary.
•
Year 3: US$300,000 on the third anniversary, with Culpeo earning a 51% interest in the project
upon completion of 2,000m of drilling.
•
Year 4: US$380,000 on the fourth anniversary.
•
Year 5: US$1,000,000 on the fifth anniversary, with Culpeo acquiring an additional 29% interest
(totalling 80%) upon completing an additional 2,000m of drilling.
•
Feasibility Study: US$1,100,000 upon announcing a positive feasibility study under the JORC
Code concluding that extraction is reasonably justified (economically mineable), securing 100%
ownership of the Project.
The Jupiter Project is located in the Coastal Cordillera belt of Chile, 70km south of Antofagasta city and is
accessible by paved roads (refer Figure 5).
This project complements Culpeo’s existing project interests and aligns with its strategy of focusing on
high-grade copper discoveries proximal to infrastructure within the Coastal Cordillera of Chile. Jupiter
offers near-term opportunity to define high-grade copper resources in a world-class region, well
supported by existing infrastructure.
LANA CORINA PROJECT EARN-IN SCHEDULE AMENDMENT
Culpeo has met the required expenditure and work commitments to earn a 50% ownership interest in the
Lana Corina Project1. The amended Lana Corina Earn-In Schedule is outlined In Table 1 below with
payments already made under the earn-in schedule presented in grey scale
PAGE |6
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 APRIL 2025
Figure 5: Simplified regional geology showing main Jurassic La Negra formation and Jurassic to Cretaceous
intrusive units.
PAGE |7
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 APRIL 2025
Figure 6: An example of one of several mines within the Jupiter Project area.
Table 1: Amended Lana Corina Project Earn-In Schedule
Stage
Period from signing
Consideration*
Work
Commitment
Stage
Interest
Aggregate
Interest
(Months)
(US$)
Description
(%)
(%)
1
Signing
100,000
N/A
0
0
2
12
150,000
US$1M expenditure
20
20
3
24
250,000
US$1M expenditure
30
50
4
3rd May 2025
100,000
N/A
0
50
5
4th March 2026
750,000
N/A
5
55
6
4 September 2026
700,000
N/A
10
65
7
4 September 2027
1,000,000
N/A
5
70
8
4 September 2026
1,650,000
N/A
10
80
Where stages 5 and 8 may be settled in the fair-value equivalent of ordinary shares of Culpeo Minerals
Limited
PAGE |8
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 APRIL 2025
CASH POSITION AT QUARTER END
During the Quarter, the Company spent A$0.326 million on exploration activities, primarily focused on
assays and sampling programs. At Quarter end, the Company had A$0.415 million in cash and cash
equivalents and zero debt.
PAYMENTS TO RELATED PARTIES
As outlined in the Appendix 5B for the Quarter ending 31 March 2025 (Sections 6.1 and 6.2),
approximately A$0.129 million in payments were made to related parties and/or their associates, which
comprised remuneration for the Managing Director, Non-Executive Director fees and Consulting fees.
This announcement has been authorised by the Board of Directors of Culpeo Minerals Limited.
CONTACT
Geoff McNamara
Interim Executive Chairman
E: geoff.mcnamara@culpeominerals.com.au
P: +61 (08) 6383 7894
PAGE |9
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 APRIL 2025
ABOUT CULPEO MINERALS LIMITED
Culpeo Minerals Limited is committed to copper exploration, discovery and development, with strategic assets
in Chile, the world’s leading copper-producing nation. The Company is focused on high-grade copper systems
within Chile’s infrastructure-rich Coastal Cordillera.
Culpeo has recently announced a significant copper and molybdenum discovery at the Lana Corina Project and
acquired the highly prospective Fortuna and Jupiter copper-gold projects.
The Lana Corina and Fortuna Projects are located in Chile’s Coquimbo Region, approximately 350 km north of
Santiago, in proximity to the world-class Los Pelambres mine. The Jupiter Project is situated in the Antofagasta
Region, renowned for hosting multiple tier-one copper and gold operations, including Escondida, Collahuasi
and El Teniente.
These project areas feature substantial outcropping high-grade copper systems, and importantly, they are
supported by well-established regional infrastructure, including roads, power transmission lines, water sources
and a strong local mining industry- factors critical in enabling cost-effective and efficient development.
The Company is led by a highly experienced board and management team with more than two decades of
operational and exploration experience in Chile. Culpeo’s objective is to deliver Shareholder value through the
exploration, acquisition and development of high-grade, near-surface copper systems.
PAGE |10
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 APRIL 2025
COMPETENT PERSONS’ STATEMENTS
The information in this announcement that relates to the historic Exploration Results and Geophysical Results
as listed in the table below is based on, and fairly represents, information and supporting documentation
prepared by the Competent Person whose name appears in the same row, who is a Director or shareholder of
or independent consultant to the Company and is a Member of the Australasian Institute of Mining and
Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG), Australian Society of Exploration Geophysics
(ASEG), or a Recognised Professional Organisation (RPO). Each person named in the table below has sufficient
experience which is relevant to the style of mineralisation and types of deposits under consideration and to
the activity which he has undertaken to quality as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.
Activity
Exploration Results (until 31 Oct 2024)
Exploration Results (after 31 Oct 2024)
Geophysical Results
Competent Person
Mr Maxwell Donald Tuesley (Shareholder
and former Director)
Mr Zeffron Reeves (Director and
Shareholder)
Mr Nigel Cantwell (Consultant)
Membership
AusIMM
Status
Member
AIG
Member
AIG and ASEG
Member
The information relating to historic Exploration Results and Geophysical Results in this announcement or as
otherwise noted in this announcement, is available from the Company’s website at www.
culpeominerals.com.au or on the ASX website www.asx.com.au. The Company confirms that it is not aware of
any new information or data that materially affects the Exploration Results and Geophysical Results information
included in previous announcements. The Company confirms that the form and context in which the applicable
Competent Persons’ findings are presented have not been materially modified from the previous
announcements.
FORWARD -LOOKING STATEMENTS
The information contained in this release is not investment or financial product advice and is not intended to
be used as the basis for making an investment decision. Please note that, in providing this release, the Company
has not considered the objectives, financial position or needs of any particular recipient. The information
contained in this release is not a substitute for detailed investigation or analysis of any particular issue and
does not purport to be all of the information that a person would need to make an assessment of the Company
or its assets. Current and potential investors should seek independent advice before making any investment
decisions in regard to the Company or its activities.
This announcement includes “forward-looking statements” within the meaning of securities laws of applicable
jurisdictions. Forward-looking statements can generally be identified by the use of the words “anticipate”,
“believe”, “expect”, “project”, “forecast”, “estimate”, “likely”, “intend”, “should”, “could”, “may”, “target”, “plan”,
“guidance” and other similar expressions. Indications of, and guidance on, future earning or dividends and
financial position and performance are also forward-looking statements. Such forward-looking statements
involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are
beyond the control of the Company, and which may cause actual results, performance or achievements to
differ materially from those expressed or implied by such statements.
Forward-looking statements are provided as a general guide only and should not be relied on as an indication
or guarantee of future performance. Given these uncertainties, recipients are cautioned to not place undue
reliance on any forward-looking statement. Subject to any continuing obligations under applicable law the
Company disclaims any obligation or undertaking to disseminate any updates or revisions to any forwardlooking statements in this document to reflect any change in expectations in relation to any forward-looking
statements or any change in events, conditions or circumstances on which any such statement is based.
PAGE |11
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 APRIL 2025
This announcement is not, and does not constitute, an offer to sell or the solicitation, invitation or
recommendation to purchase any securities and neither this announcement nor anything contained in it forms
the basis of any contract or commitment.
PAGE |12
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 APRIL 2025
Appendix A Culpeo Minerals Exploration Concessions at 3 1 March 2025
Lana - Corina
Licence
Company
Area (Ha)
Grant
Expiry
Ownership
San Agustin
Socavon
Lana Segunda
Corina
Laco 1 al 10
Sara 1 – 20
Patty 2 1 – 75
Patty 3 1 – 260
Patty 4 1 - 111
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
Antofagasta Minerals
SCM Antares
SCM Antares
SCM Antares
1
1
1
1
10
90
75
260
111
1951
1951
1951
1951
2015
2006
2019
2019
2019
None
None
None
None
None
None
None
None
None
50%
50%
50%
50%
50%
50%
50%
50%
50%
Peta 31/55
Peta 91/92
Peta 15/28
La Rosa 27/28
La Rosa 31/46
La Rosa 1/30
Corredor 2, 1/12
Corredor 3, 1/6
Cachorro 1/20
Cachorro 1,1/160
Cachorro 2, 1/95
Cachorro 3, 1/24
Cachorro 4, 1/173
Cachorro 5, 1/87
Almudena 1,1
Amudena 2, 1/3
Almudena 3, 1/2
Almudena 4, 1/7
Almudena 5, 1/6
Almudena 6,1
Almudena 7,1
Almudena 8,1/4
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
EM DOS
11-Nov-89
11-Nov-89
06-Nov-89
26-Dec-89
28-Jun-11
25-Nov-91
18-Feb-15
18-Feb-15
11-Nov-14
28-Jul-15
18-Feb-15
18-Feb-15
18-Feb-15
18-Feb-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
22-May-15
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
66%
San Sebastian 1/16 (2/16)
San Sebastian 1/16 (1)
Minera Panga SpA
Minera Panga SpA
1998
1998
None
None
100%
100%
LA FLORIDA 1 a 20
LA FLORIDA II 1 al 20
PIEDRA DURA 1 a 20
EL QUILLAY 5A 1 al 17
EL QUILLAY 4A 1 al 25
Bastis 29CB 1 al 16
Bastis 29CB 17 al 20
LOS QUILLAYES 1/4 (3/4)
LA ESPERANZA 1/10
PRETECATEMO 1/20
Antares 1 al 165
MATILDE 2 1 al 50
El Quillay 2 1 al 224
El Quillay 3 1 al 236
El Quillay 4A 1 al 89
El Quillay 4B 1 al 40
El Quillay 5A 1
El Quillay 5C 1 al 98
El Quillay 6 1 al 13
El Quillay 6A 1 al 7
La Escondida 1-14
FLORIDA 1
FLORIDA 10
FLORIDA 11
FLORIDA 12
FLORIDA 2
FLORIDA 3
FLORIDA 4
FLORIDA 5
FLORIDA 6
FLORIDA 7
FLORIDA 8
FLORIDA 9
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SCM Antares
SLM La Escondida
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
Culpeo Mining Chile Spa
2007
2010
2006
2011
2011
2011
2011
1984
1960
1953
2011
2011
2011
2011
2011
2011
2011
2011
2011
2011
2005
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
02/05/2024
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
None
15/03/2026
15/03/2026
15/03/2026
15/03/2026
15/03/2026
21/02/2026
21/02/2026
13/02/2026
13/02/2026
14/02/2026
14/02/2026
20/02/2026
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Total – Lana Corina
Petacas
550 Ha
Total – Las Petacas
San Sebastian
1,406 Ha
Total – San Sebastian
Fortuna
Total – Fortuna
120
10
70
6
80
300
12
6
20
160
95
242
173
87
1
3
2
7
6
1
1
4
45
5
50 Ha
100
100
96
17
25
127
35
10
50
100
165
200
224
236
89
40
1
98
13
7
42
300
300
300
300
300
300
300
300
300
300
300
300
5,375 Ha
PAGE |13
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 APRIL 2025
Appendix B: Jupiter Project Concession s at 3 1 March 2025
Licence
Area (Ha)
Grant
Expiry
Ownership
Jupiter 1
200
30/09/2022
18/07/2026
0%
Jupiter 2
200
10/07/2022
25/04/2027
0%
Jupiter 3
200
30/09/2022
22/06/2026
0%
Jupiter 4
200
30/09/2023
28/06/2027
0%
Jupiter 5
100
9/12/2022
1/09/2026
0%
Jupiter 6
200
10/07/2023
30/03/2026
0%
Jupiter 7
200
30/09/2022
29/06/2026
0%
Jupiter 8
300
12/07/2023
4/05/2027
0%
Jupiter 9
200
30/09/2022
22/06/2026
0%
Jupiter 10
200
10/07/2023
25/04/2027
0%
Jupiter 11
200
9/12/2022
1/09/2026
0%
Jupiter 12
300
9/09/2022
29/06/2026
0%
Jupiter 13
300
9/09/2022
29/06/2026
0%
Jupiter 14
200
20/09/2023
27/06/2027
0%
Jupiter 15
200
30/09/2022
22/06/2026
0%
Jupiter 16
300
9/12/2022
1/09/2026
0%
Jupiter 17
300
30/12/2022
29/06/2026
0%
Jupiter 18
200
10/07/2023
30/03/2026
0%
PAGE |14
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 APRIL 2025
Appendix C: Technical Details
Copper Equivalent (Cu Eq) values: Assumed commodity prices for the calculation of Copper
Equivalent (Cu Eq) is Cu US$3.00/lb, Au US$1,700/oz, Mo US$14/lb and Ag US$20/oz. Recoveries are
assumed from similar deposits: Cu = 85%, Au = 65%, Ag = 65%, Mo = 80%, Cu Eq (%) was calculated
using the following formula: ((Cu% x Cu price 1% per tonne x Cu recovery) + (Au(g/t) x Au price per
g/t x Au recovery) + (Mo ppm x Mo price per g/t x Mo recovery) + Ag ppm x Ag price per g/t x Ag
recovery)) / (Cu price 1% per tonne x Cu recovery). Cu Eq (%) = Cu (%) + (0.54 x Au (g/t)) + (0.00037
x Mo (ppm)) + (0.0063 x Ag (ppm)). It is the Company’s opinion that all elements included in the
metal equivalents have a reasonable potential to be recovered and sold.
Appendix D: References
1
Refer to ASX announcement dated 28 April 2025 “2New High Priority Porphyry Targets Identified at Lana Corina and Fortuna”.
2
Refer to ASX announcement dated 10 July 2024 “Drill Results Extend Mineralisation at Lana Corina to 454m @ 0.93% CuEq”.
3
Refer to ASX announcement dated 31 August 2022 “Culpeo Minerals Strikes Critical Metals at Lana Corina”.
4
Refer to ASX announcement dated 8 March 2023” Geochemical Survey Completed at Lana Corina”.
5
Refer to ASX announcement dated 3 April 2023 ”Geochemical Survey Identifies Multiple Significant Surface Copper and Molybdenum Targets at Lana Corina”.
6
Refer to ASX announcement dated 27 May 2024 “High-Grade Copper Assay Results in Rock Chip Samples from Vista Montana”.
7
Refer to ASX announcement dated 11 May 2022 “Culpeo intersects 257m @ 0.95% copper at Lana Corina”.
8
Refer to ASX announcement dated 6 June 2022 “Culpeo Minerals intersects 173m @ 1.05% copper”.
9
Refer to ASX announcement dated 23 November 2022 “Drilling intersects 169m @ 1.08% Cu grades up to 3.56% Cu”.
10
Refer to ASX announcement dated 2 May 2022 “Culpeo intersects 104m @ 0.74% copper at Lana Corina”.
11
Refer to ASX announcement dated 20 June 2022 “Multiple high-grade Cu intersections at Lana Corina Project”.
12
Refer to ASX announcement dated 18 May 2022“Culpeo Minerals Identifies Multiple New Regional Targets at Lana Corina Project”
13
Refer to ASX announcement dated 4 January 2024 “Substantial Copper-Gold Porphyry System Identified at New La Florida Prospect Grades of 3.96% Cu And 2.61g/t Au”
PAGE |15