ASX ANNOUNCEMENT
30 OCTOBER 2025
ASX:CPO OTCQB:CPORF
QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDED 30 SEPTEMBER 2025
Culpeo Minerals Limited (Culpeo or the Company) (ASX:CPO, OTCQB:CPORF) is pleased to report
on its activities for the quarter ended 30 September 2025 (the Quarter).
ACTIVITY HIGHLIGHTS
FORTUNA PROJECT
• Maiden diamond drilling programme completed at the La Florida Prospect, representing the
first ever holes drilled into this highly prospective target area.
• Drilling followed up on a successful trenching campaign, which revealed surface copper
mineralisation of up to 2.70% Cu within a 1,700m by 500m structural corridor1,2
.
• Results from drilling (returned post Quarter-end), identified multiple zones of >1% copper,
interpreted to lie on the boundary of a structurally controlled porphyry system3
.
• Notable high-grade drill intercepts included3
:
• 6.65m at 1.03% Cu from 14.00m (CMLFD002); including
▪ 4.40m at 1.44% Cu from 15.00m.
• 13.60m at 0.88% Cu from 4.00m (CMLFD005); including
▪ 6.10m at 1.35% Cu from 10.00m; and
▪ 16.00m at 0.70% Cu from 107.00m; including
• 7.47m at 1.36% Cu from 115.00m; and
• 1.95m at 3.49% Cu from 121.50m; and
• 0.49m at 4.19% Cu from 121.50m.
• Trenching continued across the La Florida corridor, with additional targets expected to be
defined for follow-up drilling³.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 OCTOBER 2025
PAGE |2
Figure 1: Culpeo Minerals primary project areas, approximately 350km north of Santiago, Chile.
LANA CORINA PROJECT
• Preparations advanced for the upcoming fully-funded 4,000m diamond drilling programme
at Vista Montana.
• Programme has been designed to test the potential link between the Lana Corina and Vista
Montana Prospect areas to confirm a 3km continuous copper trend4
.
CORPORATE
• Ms Michaela Stanton-Cook was appointed Joint Company Secretary on 3 July 2025, with Ms
Sue Wong continuing in her role⁵.
• General Meeting of Shareholders held on 3 July 2025, with all resolutions duly passed⁶.
• Cash balance of A$1.2 million at the end of the Quarter.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 OCTOBER 2025
PAGE |3
ACTIVITY DETAIL
FORTUNA PROJECT
The Fortuna Project is located approximately 25km north of the Company’s Lana Corina Project,
hosting numerous historical, small-scale workings that targeted near-surface, high-grade
mineralisation (Figure 2). The Project is situated within the Coastal Cordillera, a prolific porphyry belt
that hosts multiple major copper deposits.
Figure 2: Culpeo Minerals primary project areas, with significant trenching and drilling results1,2,3,4,7,8,9,10,11,14
15,16, 17, 18, 19, 20,23, 24, 25, 26.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 OCTOBER 2025
PAGE |4
La Florida Prospect
In July 2025, Culpeo announced that trenching and surface sampling at the La Florida Prospect had
identified multiple new zones of wide, high-grade copper mineralisation, defining a highly
prospective structural corridor hosting an anomalous zone of copper mineralisation measuring
approximately 1.7km long and 500m wide2
.
La Florida was interpreted to represent a structurally controlled porphyry system hosted within
similar lithologies to those observed at the nearby Lana Corina discovery. Copper mineralisation was
associated with porphyry-style veining and alteration, and elevated copper-gold geochemistry
features consistent with the central zones of productive porphyry systems2
.
Trenching and surface sampling results included:2
• 21m at 1.10% Cu (FLO1);
• 6m at 2.31% Cu (FLO26);
• 3m at 2.25% Cu (FLO49);
• 10m at 2.70% Cu (FLO67);
• 30m at 1.00% Cu (FLO70);
• 6m at 1.12% Cu (FLO71); and
• 6m at 1.29% Cu (FLO77).
Diamond drilling commenced in early July 2025, comprising eight holes, designed to test porphyry-
style mineralisation across multiple target zones. Trenching continues and is expected to generate
additional targets within the known La Florida corridor2
.
Post Quarter End
Following the end of the Quarter, Culpeo reported results from its maiden diamond drilling
programme at La Florida, which confirmed multiple zones of high-grade, near-surface copper
mineralisation (refer Figures 4, 5 and 6)3
.
Significant intercepts included:
• 6.65m at 1.03% Cu from 14.00m (CMLFD002); including
• 4.40m at 1.44% Cu from 15.00m; and
• 1.90m at 0.88% Cu from 65.50m (CMLFD002);
• 13.60m at 0.88% Cu from 4.00m (CMLFD005); including
• 6.10m at 1.35% Cu from 10.00m; and
• 16.00m at 0.70% Cu from 107.00m (CMLFD005); including
• 7.47m at 1.36% Cu from 115.00m; and
• 1.95m at 3.49% Cu from 121.50m; and
• 0.49m at 4.19% Cu from 121.50m.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 OCTOBER 2025
PAGE |5
• 1.00m at 1.37% Cu from 76.00m (CMLFD006);
• 3.00m at 0.61% Cu from 49.60m (CMLFD008); including
• 0.50m at 1.84% Cu from 51.00m (CMLFD008).
These results confirmed copper mineralisation on the interpreted margins of a porphyry system,
representing the first drilling ever completed at the target. The results were considered highly
encouraging and provided key vectors to guide the next phase of exploration3
.
The maiden eight hole diamond drilling programme at La Florida tested multiple high-grade zones
within the 1.7km by 500m zone of anomalous copper mineralisation sitting within an extensive
structural corridor. Assays were received for all eight holes, with four returning significant high-grade
intercepts and silver grades up to 5.19g/t Ag3
.
Figure 3 illustrates a schematic interpretation of the porphyry system, with the green shaded areas
showing the interpreted zones intersected during this drilling phase. Drilling confirmed the presence
of a copper-bearing, porphyry-style system hosted in lithologies comparable to those at Lana Corina.
Mineralisation was characterised by porphyry-style veining, alteration, and elevated copper and silver
geochemistry, consistent with the core zones of productive porphyry systems (refer Figure 3) 3
.
Figure 3: Schematic interpretation of a porphyry system, the green shaded areas showing the interpreted zones
intersected in the current round of drilling3
.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 OCTOBER 2025
PAGE |6
Figure 4: Location of completed diamond drillholes at La Florida. Datum PSAD56 19S2,3
.
Figure 5: Section showing high-grade intercepts from diamond drillhole CMLFD002.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 OCTOBER 2025
PAGE |7
Figure 6: Section showing high-grade intercepts from diamond drillhole CMLFD005.
Future Work Programmes
Drilling continued at the El Quillay and Piedra Dura targets, with assay results expected in the coming
weeks, to be followed by a fully-funded 4,000m maiden drill programme at Vista Montana.
Concurrent trenching activities are expected to deliver additional high-priority targets across La
Florida, El Quillay and Piedra Dura.
Results to date highlighted the widespread distribution of copper mineralisation across multiple drill
sections and confirmed the strong prospectivity of the La Florida corridor. Mineralisation was
interpreted to occur on the peripheral zones of a porphyry system, providing clear vectors for
systematic follow-up drilling and further exploration.
Trenching, sampling, and mapping at La Florida will continue through Q4 2025, with drilling expected
to commence in Q1 2026.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 OCTOBER 2025
PAGE |8
CORPORATE ACTIVITY
Joint Company Secretary Appointment
On 3 July 2025, the Company appointed Ms Michaela Stanton-Cook as Joint Company Secretary,
joining Ms Sue Wong⁵. Ms Stanton-Cook is a qualified lawyer and Chartered Secretary with extensive
governance and compliance experience across ASX-listed entities.
Results of General Meeting
A General Meeting of Shareholders was held on 3 July 2025, with all resolutions passed by the
requisite majorities⁶.
Cash Position at Quarter End
At Quarter end, the Company had A$1.2 million in cash and cash equivalents and zero debt.
Exploration expenditure for the Quarter totaled approximately A$0.9 million, primarily directed
towards drilling and field activities at the La Florida Prospect.
Payments to Related Parties
As outlined in the Appendix 5B for the Quarter ending 30 September 2025 (Sections 6.1 and 6.2),
approximately A$0.1 million in payments were made to related parties and/or their associates, which
comprised remuneration for Non-Executive Director fees and Consulting fees.
This announcement has been authorised by the Board of Directors of Culpeo Minerals Limited.
CONTACT
Geoff McNamara
Interim Executive Chairman
E: geoff.mcnamara@culpeominerals.com.au
P: +61 (08) 6383 7894
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 OCTOBER 2025
PAGE |9
ABOUT CULPEO MINERALS LIMITED
Culpeo Minerals Limited is committed to copper exploration, discovery and development, with strategic assets
in Chile, the world’s leading copper-producing nation. The Company is focused on high-grade copper systems
within Chile’s infrastructure-rich Coastal Cordillera.
Culpeo has recently announced a significant copper and molybdenum discovery at the Lana Corina Project and
acquired the highly prospective Fortuna and Jupiter copper-gold projects.
The Lana Corina and Fortuna Projects are located in Chile’s Coquimbo Region, approximately 350km north of
Santiago, in proximity to the world-class Los Pelambres mine. The Jupiter Project is situated in the Antofagasta
Region, renowned for hosting multiple tier-one copper and gold operations, including Escondida, Collahuasi
and El Teniente.
These project areas feature substantial outcropping high-grade copper systems, and importantly, they are
supported by well-established regional infrastructure, including roads, power transmission lines, water sources
and a strong local mining industry - factors critical in enabling cost-effective and efficient development.
The Company is led by a highly experienced board and management team with more than two decades of
operational and exploration experience in Chile. Culpeo’s objective is to deliver Shareholder value through the
exploration, acquisition and development of high-grade, near-surface copper systems.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 OCTOBER 2025
PAGE |10
COMPETENT PERSONS’ STATEMENTS
The information in this report that relates to Exploration Results is based on information compiled by Mr
Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian
Institute of Geoscientists and a Director and shareholder of the Company. Mr Reeves has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion in
this report of the matter based on this information in the form and context in which it appears.
The information in this announcement that relates to the historic Exploration Results as listed in the table below
is based on, and fairly represents, information and supporting documentation prepared by the Competent
Person whose name appears in the same row, who is a Director or shareholder of or independent consultant
to the Company and is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM), Australian
Institute of Geoscientists (AIG), Australian Society of Exploration Geophysics (ASEG), or a Recognised
Professional Organisation (RPO). Each person named in the table below has sufficient experience which is
relevant to the style of mineralisation and types of deposits under consideration and to the activity which he
has undertaken to quality as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves.
Activity Competent Person Membership Status
Exploration Results (until 31 Oct 2024) Mr Maxwell Tuesley (Shareholder and former Director) AusIMM Member
Exploration Results (after 31 Oct 2024) Mr Zeffron Reeves (Director and Shareholder) AIG Member
The information relating to historic Exploration Results in this announcement, or as otherwise noted in this
announcement, is available from the Company’s website at www.culpeominerals.com.au or on the ASX website
www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially
affects the Exploration Results and Geophysical Results information included in previous announcements. The
Company confirms that the form and context in which the applicable Competent Persons’ findings are
presented have not been materially modified from the previous announcements.
FORWARD-LOOKING STATEMENTS
This document may include forward-looking statements. Forward-looking statements include, but are not
limited to, statements concerning Culpeo Minerals Limited’s planned exploration programme and other
statements that are not historical facts. When used in this document, the words such as "could," "plan,"
"estimate," "expect," "intend," "may”, "potential," "should," and similar expressions are forward-looking
statements. Although Culpeo Minerals Limited believes that its expectations reflected in these forward-looking
statements are reasonable, such statements involve risks and uncertainties, and no assurance can be given that
actual results will be consistent with these forward-looking statements.
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 OCTOBER 2025
PAGE |11
Appendix A: Culpeo Minerals Exploration Concessions at 30 September 2025
Project Licence Company Area (Ha) Grant Expiry Ownership
Lana - Corina San Agustin SCM Antares 1 1951 None 50%
Socavon SCM Antares 1 1951 None 50%
Lana Segunda SCM Antares 1 1951 None 50%
Corina SCM Antares 1 1951 None 50%
Laco 1 al 10 SCM Antares 10 2015 None 50%
Sara 1 – 20 Antofagasta Minerals 90 2006 None 50%
Patty 2 1 – 75 SCM Antares 75 2019 None 50%
Patty 3 1 – 260 SCM Antares 260 2019 None 50%
Patty 4 1 - 111 SCM Antares 111 2019 None 50%
Total – Lana Corina 550 Ha
Petacas Peta 31/55 EM DOS 120 11-Nov-89 None 66%
Peta 91/92 EM DOS 10 11-Nov-89 None 66%
Peta 15/28 EM DOS 70 06-Nov-89 None 66%
La Rosa 27/28 EM DOS 6 26-Dec-89 None 66%
La Rosa 31/46 EM DOS 80 28-Jun-11 None 66%
La Rosa 1/30 EM DOS 300 25-Nov-91 None 66%
Corredor 2, 1/12 EM DOS 12 18-Feb-15 None 66%
Corredor 3, 1/6 EM DOS 6 18-Feb-15 None 66%
Cachorro 1/20 EM DOS 20 11-Nov-14 None 66%
Cachorro 1,1/160 EM DOS 160 28-Jul-15 None 66%
Cachorro 2, 1/95 EM DOS 95 18-Feb-15 None 66%
Cachorro 3, 1/24 EM DOS 242 18-Feb-15 None 66%
Cachorro 4, 1/173 EM DOS 173 18-Feb-15 None 66%
Cachorro 5, 1/87 EM DOS 87 18-Feb-15 None 66%
Almudena 1,1 EM DOS 1 22-May-15 None 66%
Amudena 2, 1/3 EM DOS 3 22-May-15 None 66%
Almudena 3, 1/2 EM DOS 2 22-May-15 None 66%
Almudena 4, 1/7 EM DOS 7 22-May-15 None 66%
Almudena 5, 1/6 EM DOS 6 22-May-15 None 66%
Almudena 6,1 EM DOS 1 22-May-15 None 66%
Almudena 7,1 EM DOS 1 22-May-15 None 66%
Almudena 8,1/4 EM DOS 4 22-May-15 None 66%
Total – Las Petacas 1,406 Ha
San Sebastian San Sebastian 1/16 (2/16) Minera Panga SpA 45 1998 None 100%
San Sebastian 1/16 (1) Minera Panga SpA 5 1998 None 100%
Total – San Sebastian 50 Ha
Fortuna LA FLORIDA 1 a 20 SCM Antares 100 2007 None 80%
LA FLORIDA II 1 al 20 SCM Antares 100 2010 None 80%
PIEDRA DURA 1 a 20 SCM Antares 96 2006 None 80%
EL QUILLAY 5A 1 al 17 SCM Antares 17 2011 None 80%
EL QUILLAY 4A 1 al 25 SCM Antares 25 2011 None 80%
Bastis 29CB 1 al 16 SCM Antares 127 2011 None 80%
Bastis 29CB 17 al 20 SCM Antares 35 2011 None 80%
LOS QUILLAYES 1/4 (3/4) SCM Antares 10 1984 None 80%
LA ESPERANZA 1/10 SCM Antares 50 1960 None 80%
PRETECATEMO 1/20 SCM Antares 100 1953 None 80%
Antares 1 al 165 SCM Antares 165 2011 None 80%
MATILDE 2 1 al 50 SCM Antares 200 2011 None 80%
El Quillay 2 1 al 224 SCM Antares 224 2011 None 80%
El Quillay 3 1 al 236 SCM Antares 236 2011 None 80%
El Quillay 4A 1 al 89 SCM Antares 89 2011 None 80%
El Quillay 4B 1 al 40 SCM Antares 40 2011 None 80%
El Quillay 5A 1 SCM Antares 1 2011 None 80%
El Quillay 5C 1 al 98 SCM Antares 98 2011 None 80%
El Quillay 6 1 al 13 SCM Antares 13 2011 None 80%
El Quillay 6A 1 al 7 SCM Antares 7 2011 None 80%
La Escondida 1-14 SLM La Escondida 42 2005 None 80%
FLORIDA 1 Culpeo Mining Chile Spa 300 02/05/2024 15/03/2026 100%
FLORIDA 10 Culpeo Mining Chile Spa 300 02/05/2024 15/03/2026 100%
FLORIDA 11 Culpeo Mining Chile Spa 300 02/05/2024 15/03/2026 100%
FLORIDA 12 Culpeo Mining Chile Spa 300 02/05/2024 15/03/2026 100%
FLORIDA 2 Culpeo Mining Chile Spa 300 02/05/2024 15/03/2026 100%
FLORIDA 3 Culpeo Mining Chile Spa 300 02/05/2024 21/02/2026 100%
FLORIDA 4 Culpeo Mining Chile Spa 300 02/05/2024 21/02/2026 100%
FLORIDA 5 Culpeo Mining Chile Spa 300 02/05/2024 13/02/2026 100%
FLORIDA 6 Culpeo Mining Chile Spa 300 02/05/2024 13/02/2026 100%
FLORIDA 7 Culpeo Mining Chile Spa 300 02/05/2024 14/02/2026 100%
FLORIDA 8 Culpeo Mining Chile Spa 300 02/05/2024 14/02/2026 100%
FLORIDA 9 Culpeo Mining Chile Spa 300 02/05/2024 20/02/2026 100%
Total – Fortuna 5,375 Ha
Jupiter Jupiter 1 200 30/09/2022 18/07/2026 0%
Jupiter 2 200 10/07/2022 25/04/2027 0%
Jupiter 3 200 30/09/2022 22/06/2026 0%
Jupiter 4 200 30/09/2023 28/06/2027 0%
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 OCTOBER 2025
PAGE |12
Jupiter 5 100 9/12/2022 1/09/2026 0%
Jupiter 6 200 10/07/2023 30/03/2026 0%
Jupiter 7 200 30/09/2022 29/06/2026 0%
Jupiter 8 300 12/07/2023 4/05/2027 0%
Jupiter 9 200 30/09/2022 22/06/2026 0%
Jupiter 10 200 10/07/2023 25/04/2027 0%
Jupiter 11 200 9/12/2022 1/09/2026 0%
Jupiter 12 300 9/09/2022 29/06/2026 0%
Jupiter 13 300 9/09/2022 29/06/2026 0%
Jupiter 14 200 20/09/2023 27/06/2027 0%
Jupiter 15 200 30/09/2022 22/06/2026 0%
Jupiter 16 300 9/12/2022 1/09/2026 0%
Jupiter 17 300 30/12/2022 29/06/2026 0%
Jupiter 118 200 10/07/2023 30/03/2026 0%
Total Jupiter 4,000 Ha
Appendix B: Technical Details
Copper Equivalent (CuEq) values: Assumed commodity prices for the calculation of CuEq is Cu
US$3.00/lb, Au US$1,700/oz, Mo US$14/lb and Ag US$20/oz. Recoveries are assumed from similar
deposits: Cu = 85%, Au = 65%, Ag = 65%, Mo = 80%, Cu Eq (%) was calculated using the following
formula: ((Cu% x Cu price 1% per tonne x Cu recovery) + (Au(g/t) x Au price per g/t x Au recovery) +
(Mo ppm x Mo price per g/t x Mo recovery) + Ag ppm x Ag price per g/t x Ag recovery)) / (Cu price
1% per tonne x Cu recovery). Cu Eq (%) = Cu (%) + (0.54 x Au (g/t)) + (0.00037 x Mo (ppm)) + (0.0063
x Ag (ppm)). It is the Company’s opinion that all elements included in the metal equivalents have a
reasonable potential to be recovered and sold.
Appendix C: References
1.
Refer to ASX announcement dated 24 June 2025 “Multiple New High Priority Targets Identified at La Florida”.
2.
Refer to ASX announcement dated 21 July 2025, “High-Grade Surface Copper Mineralisation Identified at the La Florida Prospect.”
3.
Refer to ASX announcement dated 7 October 2025, “High Grade Near Surface Copper Intersected at La Florida”.
4.
Refer to ASX announcement dated 28 April 2025 “New Priority Porphyry Targets Identified at the Lana Corina and Fortuna Copper Projects”.
5.
Refer to ASX announcement dated 3 July 2025, “Appointment of Joint Company Secretary”.
6.
Refer to ASX announcement dated 3 July 2025, “Results of General Meeting”.
7.
Refer to ASX announcement dated 11 September 2023 “High Priority El Quillay North target defined”.
8.
Refer to ASX announcement dated 1 November 2023” High grade Copper and gold trend at Fortuna”.
9.
Refer to ASX announcement dated 12 December 2023 ”Culpeo extends Piedra Dura Mineralisation”.
10.
Refer to ASX announcement dated 29 February 2024 “High-Grade Surface Copper and Gold Confirmed at El Quillay South”.
11.
Refer to ASX announcement dated 18 March 2024 “Culpeo Minerals Identifies new target at Fortuna”.
12.
Refer to ASX announcement dated 14 May 2024 “Reconnaissance Drilling Deliveries Grades up to 2.19% CuEq”.
13.
Refer to ASX announcement dated 29 February 2024 “High Grade Surface Copper and Gold Mineralisation Confirmed at El Quillay South”.
14.
Refer to ASX announcement dated 11 September 2023 “High Priority El Quillay North Target Defined at Fortuna with Historical Grades up to 6.92% Cu”.
15.
Refer to ASX announcement dated 1 November 2023 “New High-Grade Copper and Gold Trend at Fortuna with up to 4.16% Cu and 48.3g/t Au”.
16.
Refer to ASX announcement dated 4 October 2023 “Fortuna Copper Project Tenure Expanded by over 125%”.
17.
Refer to ASX announcement dated 7 July 2025 “Maiden Drilling Commences at La Florida Prospect”.
18.
Refer to ASX announcement dated 4 January 2024 “Copper-Gold Porphyry System Identified at La Florida”.
19.
Refer to ASX announcement dated 21 November 2023 “High-grade Copper trend discovered”.
20.
Refer to ASX announcement dated 7 August 2023 “CPO Acquires Significant New Tenement Package”.
21.
Refer to ASX announcement dated 17 January 2024 “Drilling Returns Wide Copper Intersections (Replacement)”.
22.
Refer to ASX announcement dated 30 July 2025, “June 2025 Quarterly Activities Report”.
23
Refer to ASX announcement dated 10 July 2024 “Drill Results Extend Mineralisation At Lana Corina To 454M @ 0.93% CuEq”
CULPEOMINERALS.COM.AU
ASX ANNOUNCEMENT 30 OCTOBER 2025
PAGE |13
24.
Refer to ASX Announcement dated 11 May 2022: “Culpeo intersects 257m @ 0.95% copper at Lana Corina”.
25
Refer to ASX Announcement dated 6 June 2022: “Culpeo Minerals intersects 173m @ 1.05% copper”.
26.
Refer to ASX Announcement dated 23 November 2022: “Drilling intersects 169m @ 1.08% Cu grades up to 3.56% Cu”.